Site Report: Hoonah RRS - EA 9 - Debris Disposal Area
| Site Name: | Hoonah RRS - EA 9 - Debris Disposal Area |
|---|---|
| Address: | 1.25 Miles NE of Hoonah, Hoonah, AK 99829 |
| File Number: | 1510.38.001 |
| Hazard ID: | 25732 |
| Status: | Cleanup Complete |
| Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
| Latitude: | 58.127513 |
| Longitude: | -135.419358 |
| Horizontal Datum: | WGS84 |
| ![]() |
![]() | ![]() |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
The Hoonah Radio Relay Station (RRS) is a Formerly Used Defense Site (FUDS); FUDS project number F10AK012203; EPA ID AKN001002287. The Hoonah RRS was a tropospheric station for the Ballistic Missile Early Warning System (BMEWS) and part of the White Alice Communication System (WACS). The facility served as a telecommunications relay link between WACS sites at Duncan Canal and Ocean Cape. Exposure area (EA) 9 is described in the decision document as: Debris Disposal Area. On 9/23/11 the Hoonah Radio Relay Station database entry was divided into four separate records. Original Hazard ID 1452 (Reckey 199211X119701) was renamed from Hoonah Radio Relay Station to Hoonah RRS - Main Cantonment, and additional database records were created for EA 4: PCB Soil Stockpile Area; EA 8: Septic Outfall; and EA 9: Debris Disposal Area.
Action Information
| Action Date | Action | Description | DEC Staff |
|---|---|---|---|
| 7/1/1996 | Update or Other Action | Field Investigation Report | Employee Past |
| 3/1/1997 | Site Characterization Report Approved | Remedial Investigation Report approved this date. The Debris Disposal Area was highlighted as having multiple PRPs and so would not be addressed in FUDS-only actions and reports. | Employee Past |
| 9/11/2002 | CERCLA PA | EPA Start PA received. | Anne Marie Palmieri |
| 4/25/2008 | Meeting or Teleconference Held | DEC and DOL staff met with the USACE to discuss future DDA actions. | Anne Marie Palmieri |
| 11/5/2009 | Meeting or Teleconference Held | First PRP meeting held this date to discuss future actions at the DDA. | Anne Marie Palmieri |
| 5/17/2011 | Meeting or Teleconference Held | Teleconference held with PRP group. | Anne Marie Palmieri |
| 6/16/2011 | Update or Other Action | Field visit conducted by PRP group consultant, SLR. | Anne Marie Palmieri |
| 8/24/2011 | Meeting or Teleconference Held | Teleconference held with PRP group to discuss work plan activities. | Anne Marie Palmieri |
| 9/14/2011 | Site Characterization Workplan Approved | Work plan approved for additional characterization in the Debris Disposal Area and EA4. SLR will be on-site to implement the work plan in late September 2011. | Anne Marie Palmieri |
| 9/23/2011 | Site Added to Database | A new site has been added to the database | Mitzi Read |
| 9/23/2011 | Update or Other Action | On 9/23/11 the Hoonah Radio Relay Station database entry was divided into four separate records. Original Hazard ID 1452 (Reckey 199211X119701) was renamed from Hoonah Radio Relay Station to Hoonah RRS - Main Cantonment, and additional database records were created for EA 4: PCB Soil Stockpile Area; EA 8: Septic Outfall; and EA 9: Debris Disposal Area. | Mitzi Read |
| 3/9/2012 | Site Characterization Report Approved | Field Investigation and Assessment Report (2-12) approved this date. | Anne Marie Palmieri |
| 9/16/2013 | Cleanup Plan Approved | Cleanup plan approved this date. Additional characterization will occur in Sept. 2013 and the cleanup in summer 2014. | Anne Marie Palmieri |
| 11/26/2013 | Document, Report, or Work plan Review - other | Staff reviewed the summary report from the 2013 field work. | Anne Marie Palmieri |
| 6/9/2014 | Update or Other Action | AT&T's consultant, SLR, notified DEC that field work is scheduled to begin on July 7, 2014. | Anne Marie Palmieri |
| 8/8/2014 | Update or Other Action | CS staff received notification from the cleanup contractor that they were suspending the removal action at the landfill without achieving the cleanup levels for DRO/RRO and arsenic. They collected additional samples to try and determine higher background concentrations, however this was performed without an approved work plan. CS staff has made the contractor aware that their actions are not approved by DEC. Upon reviewing their report this winter, DEC may disagree with their conclusions and ask for additional work. | Anne Marie Palmieri |
| 6/26/2015 | Final Cleanup Report Reviewed | The final cleanup report was reviewed and approved this date. | Anne Marie Palmieri |
| 6/26/2015 | Cleanup Complete Determination Issued | A cleanup complete determination letter was issued this date. | Anne Marie Palmieri |
Contaminant Information
| Name | Level Description | Media | Comments |
|---|---|---|---|
| Aroclor 1260 | < Method 2 Most Stringent | Soil |
Control Type
| Type | Details |
|---|---|
| No ICs Required |
Requirements
| Description | Details |
|---|---|
| Advance approval required to transport soil or groundwater off-site. | |
| Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) |