Action Date |
Action |
Description |
DEC Staff |
4/19/1995 |
Site Characterization Report Approved |
Phase 1 Remedial Investigation report approved this date. |
Employee Past |
9/1/1995 |
Update or Other Action |
Community Relations Plan |
Employee Past |
7/3/1996 |
Risk Assessment Workplan Approved |
Risk Assessment work plan approved this date. |
Employee Past |
8/1/1996 |
Site Characterization Report Approved |
Phase 2 Remedial Investigation approved this date. |
Employee Past |
3/1/1998 |
Update or Other Action |
EE/CA submitted. |
Employee Past |
8/1/1998 |
CERCLA FS |
Feasibility Study approved this date. |
Employee Past |
11/20/1998 |
Risk Assessment Report Approved |
Risk Assessment report approved this date. |
Employee Past |
2/23/1999 |
Cleanup Plan Approved |
Cleanup plan for the excavation and off-site disposal of contaminated soil approved this date. Cleanup levels approved as interim removal action screening levels. |
Anne Marie Palmieri |
2/24/2000 |
Interim Removal Action Approved |
The Interim Removal Action Report was approved this date. Although excavation was planned at each of these areas, supplemental sampling did not find contamination present at concentrations above the IRA screening levels. Therefore, no soil was excavated. Sample results are documented in the IRA report. |
Anne Marie Palmieri |
9/27/2002 |
Cleanup Level(s) Approved |
18 AAC 75.350 Determination granted for this site.
Groundwater cleanup levels approved as 10x the Table C values. These alternative cleanup levels are appropriate for an area where groundwater is not a current or reasonably potential future source of drinking water. |
Anne Marie Palmieri |
6/8/2004 |
Cleanup Level(s) Approved |
Soil cleanup levels approved this date. Soil alternative cleanup levels for petroleum are based upon the groundwater 10x rule. |
Anne Marie Palmieri |
4/2/2007 |
CERCLA ROD Approved |
John Halverson signed tht Declaration of Project Closure Decision for the CON/HTRW project on this date. |
Anne Marie Palmieri |
9/28/2008 |
Site Characterization Report Approved |
Final Remedial Investigation Report Addendum approved this date. The report summarizes all of the past information (characterzation and cleanup) of the site. No significant areas of contamination remain. No Feasibility Study will be prepared. Perferred alternative is "no action". |
Anne Marie Palmieri |
9/24/2009 |
CERCLA ROD Approved |
Decision document signed this date. All sample results were below the approved groundwater and soil cleanup levels, therefore no action is needed. |
Anne Marie Palmieri |
9/27/2011 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
9/27/2011 |
Update or Other Action |
On 9/27/11 the Sitka Naval Operations Base database entry was divided into seven separate records. Original Hazard ID 1992 was renamed from Sitka Naval Operating Base to Sitka NOB - Area F - Tank Farm No. 2, and additional database records were created for Area A - Power Plant; Areas B/C/D/I/J - Frmr Army Navy Service Station, Water Tower TF, TF Nos. 1/4/5; Area E - Millerville Housing; Area G -Igarotte Housing Area; Area H - Seaplane Dock; and Area K Tank Farm No. 3. |
Mitzi Read |
9/30/2011 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79176 name: Sitka NOB - Areas B/C/D/I/J - Frmr Army Navy Service Station, Water Tower TF, TF Nos. 1/4/5 |
Anne Marie Palmieri |
10/13/2011 |
Cleanup Complete Determination Issued |
USACE Declaration of Project Closure signed by John Halverson this date |
Anne Marie Palmieri |
11/17/2011 |
Institutional Control Record Removed |
Institutional Controls have been removed. |
Anne Marie Palmieri |
11/17/2011 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Anne Marie Palmieri |
11/17/2011 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Anne Marie Palmieri |
11/17/2011 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 79176 Sitka NOB - Areas B/C/D/I/J - Frmr Army Navy Service Station, Water Tower TF, TF Nos. 1/4/5. |
Anne Marie Palmieri |
7/9/2021 |
Document, Report, or Work plan Review - other |
Reviewed the June 24, 2021 SEARHC Millerville Phase II ESA work plan on this date. This is a landowner driven investigation so DEC did not provide comments/recommendations on the work plan, but is aware that the work is being done later in the month. |
Evonne Reese |