Action Date |
Action |
Description |
DEC Staff |
10/26/2011 |
Spill Transferred from Prevention Preparedness and Response Program |
Spill transferred by PERP staff Paul Lhotka. Spill no. 11309928902; spill date = 10/16/11; quantity = ~5 gallons; substance = diesel; description: fuel spilled onto soil during fuel transfer from pipeline that was being removed. |
Mitzi Read |
11/4/2011 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
11/4/2011 |
Document, Report, or Work plan Review - other |
ADEC received a Draft Site Inspection report for Site VP09. |
Dennis Shepard |
2/1/2012 |
Document, Report, or Work plan Review - other |
ADEC received a draft Site Characterization report for Site PADS. |
Dennis Shepard |
2/1/2012 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79199 name: OAP 1 |
Dennis Shepard |
3/19/2012 |
Document, Report, or Work plan Review - other |
ADEC provided comments on the Draft Site Inspection report for Site VP09. Review of the report finds that a non-qualifying site determination is appropriate for Site VP09. |
Dennis Shepard |
11/2/2012 |
Document, Report, or Work plan Review - other |
ADEC received a responce to draft comments and a Draft Final Site Characterization results report for site PADS. |
Dennis Shepard |
1/14/2014 |
Site Characterization Workplan Approved |
DEC provided approval for a Supplemental Remedial Investigation (RI) and Site Characterization (SC) Sampling Plan. The sampling plan presents step out sample locations and analytical protocols for supplemental remedial investigation at six Sites (B400, OWS1833, DSWD, SS006/SS019, and FT001) and supplemental site characterization activities at two Sites (ST010 and OAP) at the Former Galena FOL. This sampling was agreed to during a November 2012 Galena Data Gaps meeting. |
Dennis Shepard |
2/17/2015 |
Document, Report, or Work plan Review - other |
DEC approved a Site Characterization Report Addendum, Old Abandoned Pipeline (OAP). The purpose of the addendum was to address the requirements for a Site Characterization Report under 18 AAC 75.335(c) specifically, to propose cleanup levels and remedial techniques for the site.
The addendum presents three areas associated with the OAP, which are proposed for cleanup activities. Excavation of petroleum-contaminated soil is proposed at Areas 1 and 2. Bioventing and potentially In Situ Chemical Oxidation is proposed for Area 3. Monitored Natural Attenuation of contaminates in saturated soil and in groundwater is proposed for each area. |
Dennis Shepard |
4/20/2015 |
Site Characterization Report Approved |
DEC approved the Supplemental Site Characterization (SC) Report, Old Abandoned Pipeline (Site OAP renamed CLP006), Former Galena Forward Operating Location (FOL), Alaska. The report further evaluates the nature and extent of fuel-related contamination at the OAP site previously
reported in the Final Site Characterization Results Report. |
Dennis Shepard |
8/29/2015 |
Document, Report, or Work plan Review - other |
DEC approved the Pipe Verification and Surface Tar Removal Work Plan, Former Galena Forward Operating Location (FOL), Alaska. |
Dennis Shepard |
10/25/2016 |
Meeting or Teleconference Held |
A Technical project team meeting was held to discuss multiple sites and facility issues. The DEC comments for the draft Cleanup plan for the OAP was discussed. The cleanup plan is proposing alternate cleanup levels (ACLs) for areas along the OAP where groundwater has not been impacted. Due to the changes in DEC cleanup levels, the ACLs are being reevaluated with the New Method three calculator. |
Dennis Shepard |
10/26/2016 |
Meeting or Teleconference Held |
A restoration Advisory board meeting was held in Galena Alaska to discuss the general and specific status of site investigations and cleanup at Galena. |
Dennis Shepard |
1/19/2017 |
Cleanup Plan Approved |
DEC approved the cleanup plan: Site CPL006, Old Abandoned Pipeline, Former Galena Forward Operating Location, Alaska. The cleanup plan documents proposed cleanup methods, cleanup levels and interim land use controls for several sites along the old abandoned pipeline routes. |
Dennis Shepard |
8/21/2017 |
Update or Other Action |
Old Abandoned Pipeline (Site CPL006) Area 3 was excavated to remove shallow petroleum hydrocarbon contamination that could not be treated effectively by bioventing. This soil (approximately 100 cubic yards (cy)) was taken to the landfarm for treatment. |
Dennis Shepard |
6/20/2018 |
Document, Report, or Work plan Review - other |
TECH MEMO APPROVAL: Addendum to Site CPL006 Cleanup Plan, Revised In Situ Chemical Oxidation Implementation Approach for Area 2. Prepared by Parsons. Dated June 20, 2018. The tech memo provides details on the revised approach for implementing in situ chemical oxidation (ISCO) at Site CPL006 (Old Abandoned Pipeline) to reduce concentrations of contaminants of concern (COCs) in soil and the vadose zone. |
Jamie McKellar |
8/8/2018 |
Site Visit |
DEC conducted a site visit at the Former Forward Operating Location in Galena, AK on August 8-9, 2018. A photo log is available in DEC's electronic file. |
Jamie McKellar |
10/29/2018 |
Site Visit |
On October 23, 2018, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit with inspections of each site was conducted the following day (10/24/2018) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
1/2/2019 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: 2017 Performance Monitoring Report for Sites CPL006, CSS002, OW024, SS014/SS017, SS016, SS022, SS025, ST009, and ST010. Parsons, December 2018. The report presents and evaluates performance monitoring data for sites managed by Parsons with an approved Cleanup Plan or Record of Decision (ROD), and an active remedy installed and operating for fiscal year 2017. |
Jamie McKellar |
4/5/2019 |
Site Visit |
On April 2, 2019, DEC staff participated in a Technical Project Team meeting with representatives from USAF, Parsons, CH2M, and ADOT. The TPT meeting was held at the Fairbanks DEC office. On April 3-4, 2019, DEC staff traveled to Galena to participate in meetings with the City Mayor & RAB chair to discuss community concerns about site cleanup; a Proposed Plan meeting for Site DP023, and a community regional advisory board (RAB) meeting to discuss fieldwork completed during the 2018 field season and upcoming 2019 fieldwork. Site visits were also conducted. |
Jamie McKellar |
10/23/2019 |
Meeting or Teleconference Held |
On October 22, 2019, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit was conducted the following day (10/23/2019) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
10/30/2019 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final 2018 Performance Monitoring Report for Sites CPL006, CSS002, OW024, SS006/SS019, SS014/SS017, SS015, SS016, SS018, SS022, SS025, ST009, ST010, and FT001, Former Galena Forward Operating Location, Alaska (Parsons, October 2019) |
Jamie McKellar |
9/4/2020 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 79199 OAP 1. |
Jamie McKellar |
4/21/2021 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: 2020 Performance Monitoring Report for Sites CPL006, CSS002, SS006/SS019, SS017, SS015, SS016, SS018, SS022, ST009, ST010, and FT001, Former Galena Forward Operating Location, Alaska (Parsons, April 2021) |
Jamie McKellar |
8/23/2023 |
Document, Report, or Work plan Review - other |
REPORT APPROVED: Final Remedial Process Optimization Evaluation Report, Former Galena Forward Operating Location, Alaska (Parsons, June 2023) |
Jamie McKellar |
9/14/2023 |
Document, Report, or Work plan Review - other |
WORK PLAN APPROVED: Final Addendum 3 to Work Plan for Remedial Process Optimization Technical Memorandum, Former Galena Forward Operating Location, Alaska (Parsons, September 2023) |
Jamie McKellar |
11/15/2023 |
Site Visit |
DEC, DOT, USAF, and contractors met at the Fairbanks DEC office on May 2, 2023 for a Technical Project Team meeting. The following day a site visit and Regional Advisory Board (RAB) meeting were held in Galena. Meeting minutes for the TPT and RAB meetings were approved on November 15, 2023. |
Jamie McKellar |
4/23/2024 |
Meeting or Teleconference Held |
CS staff participated in the biannual Technical Project Team (TPT) meeting with representatives from USAF BRAC, Parsons, Jacobs/CH2M Hill, and EA Engineering. The meeting was held at the EA Engineering office in Anchorage, AK. |
Jamie McKellar |
6/26/2024 |
Document, Report, or Work plan Review - other |
DEC Approved the Final Addendum 4 to Work Plan for Remedial Process Optimization at the Former Galena Forward Operating Location on this date. |
Tim Sharp |
6/27/2024 |
Document, Report, or Work plan Review - other |
DEC approved multiple data quality assessment reports for soil, soil vapor, groundwater, and sediment. Reports were submitted by Parsons and CH2M/Jacobs. Approval letter is dated 6/27/2024. |
Jamie McKellar |