Site Report: Chugach Electric Association Operations Facility
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
A 1,000-gallon underground diesel tank (Tank #8) and its assocaited piping were removed on October 3, 2011. All soil samples met default cleanup levels. Up to 21.1 mg/kg DRO, 251 mg/kg RRO, and1.26 mg/kg GRO in the samples collected. Recommend site for corrective action complete status.
Action Information
Contaminant Information
Name |
Level Description |
Media |
Comments |
DRO |
< Method 2 Most Stringent |
Soil |
|
GRO |
< Method 2 Most Stringent |
Soil |
|
RRO |
< Method 2 Most Stringent |
Soil |
|
Control Type
Type |
Details |
No ICs Required |
|
Requirements
Description |
Details |
Advance approval required to transport soil or groundwater off-site. |
|
No associated sites were found.