Action Date |
Action |
Description |
DEC Staff |
5/18/2012 |
Document, Report, or Work plan Review - other |
DEC received a Draft Remedial Investigation results report for the Site. |
Dennis Shepard |
9/7/2012 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
10/10/2012 |
Update or Other Action |
DEC sent a letter to EPA concerning Risk Assessments (RAs) for Remedial Investigation Sites at Galena. DEC has asked EPA to provide an opinion on risk assessment issues requiring resolution for the remedial investigation sites at Galena. Specific issues of concern are: determination of risk assessment source area and calculation of exposure point concentrations |
Dennis Shepard |
10/22/2012 |
Document, Report, or Work plan Review - other |
DEC provided review comments for the Remedial Investigation results report for the Site. |
Dennis Shepard |
11/15/2012 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79327 name: SS015 South Apron Trichloroethene Area |
Dennis Shepard |
2/18/2013 |
Document, Report, or Work plan Review - other |
DEC received a Draft Final Remedial Investigation results report for the Site. |
Dennis Shepard |
5/8/2013 |
Document, Report, or Work plan Review - other |
DEC provided review comments for the Draft Final Remedial Investigation results report for the Site. |
Dennis Shepard |
5/23/2013 |
Meeting or Teleconference Held |
A comment resolution conference call meeting was held to reach agreement on the final unresolved issues for the Remedial Investigation results report for the Site. DEC comments were adequately addressed and all issues for the report were resolved. |
Dennis Shepard |
7/1/2013 |
Document, Report, or Work plan Review - other |
A Final version of the Remedial Investigation results report was submitted. |
Dennis Shepard |
8/30/2013 |
Document, Report, or Work plan Review - other |
DEC received Draft Risk Assessment Data files and figures to review for this Site. The Air Force is preparing both human health and ecological risk assessments for this site, and by previous agreement, DEC review and approval of the data set is a critical first step in the process.
DEC provided review comments for Human Health assessment concerns for the Data set on this day. |
Dennis Shepard |
9/17/2013 |
Document, Report, or Work plan Review - other |
DEC provided review comments for Ecological Risk Assessment concerns for the Draft Risk Assessment Data files and figures provided on August 30, 2013. |
Dennis Shepard |
10/22/2013 |
Meeting or Teleconference Held |
The Air Force, its contractor and DEC met in a teleconference meeting to agree on a framework for evaluating vapor intrusion of SS015 in the risk assessment for the site. Groundwater at the site has high concentrations of chlorinated solvents; i.e., up to 910 ug/L of Trichloroethylene (TCE). Vapor intrusion is a potential issue. |
Dennis Shepard |
10/22/2013 |
Meeting or Teleconference Held |
The Air Force, its contractor and DEC met in a teleconference meeting to agree on a framework for evaluating vapor intrusion of SS015 in the risk assessment for the site. Groundwater at the site has high concentrations of chlorinated solvents; i.e., up to 910 ug/L of Trichloroethylene (TCE). Vapor intrusion is a potential issue. |
Dennis Shepard |
10/29/2013 |
CERCLA RI Report Approved |
DEC approved the Remedial Investigation (RI) results report for the Site. By Agreement with DEC, the RI results report does not contain a Baseline risk assessment. A risk assessment for the Site is being completed under a separate Air Force contract/effort. |
Dennis Shepard |
11/13/2013 |
Document, Report, or Work plan Review - other |
DEC received a Draft Risk Assessment for Site. |
Dennis Shepard |
12/20/2013 |
Document, Report, or Work plan Review - other |
DEC provided review comments for the Draft Risk Assessement for the Site. One significant comment concerned the absence of a proposed approach to assess the inhalation exposure potential for a pregnant woman exposed to Trichloroethylene (TCE) during a 21 day early gestation period. |
Dennis Shepard |
4/15/2014 |
Meeting or Teleconference Held |
A Technical Project Team meeting was held to meet the Air Force newly selected Performance Based Remediation Contractor for Galena. The 6.5 year remediation contract was awarded to Parsons Governmental Services (Parsons). The contract includes completing the risk assessments, remediation feasibility studies, proposed plans and record of decision for remedial investigations at 10 Sites (FT001, SS006, SS013, SS015, SS019, SS018/AOC023, SS022/B400, DP023/DSWD, OW024/OWS1833, and SS025). |
Monte Garroutte |
9/5/2014 |
Risk Assessment Report Approved |
DEC approved the Human Health and Ecological Risk Assessment, South Apron Maintenance Area (Site SS015). The assessment concluded that cumulative carcinogenic risk is greater than the cumulative risk goal of 1 × 10-5 for: Current/future occupational workers, Near-term and long term future residents, exposed to surface soil, indoor air, and potable groundwater. The reported Hazard Index for petroleum hydrocarbon constituents is greater than 1 for each of these receptor groups. |
Dennis Shepard |
6/1/2015 |
CERCLA FS |
DEC approved the Feasibility Study Report for South Apron Maintenance Area (Site SS015), Performance-Based Remediation at Galena. The selected alternative consists of soil vapor extraction, bioventing, enhanced anaerobic bioremediation/enhanced biogeochemical transformation, land use controls, and monitored natural attenuation. |
Dennis Shepard |
10/2/2015 |
CERCLA Proposed Plan |
DEC approved the proposed plan - Air Force Proposes Alternatives for South Apron Maintenance Area (Site SS015) with Soil and Groundwater Impacts Based on Environmental Investigation Results – Public Comment Invited, Former Galena Forward Operating Location (FOL), Alaska. |
Dennis Shepard |
10/20/2015 |
CERCLA Proposed Plan |
A Restoration Advisory Board (RAB) Meeting was held in Galena Alaska. The DEC approved Proposed Plan for the site SS015 was presented during the RAB meeting. Public comment was recorded during the meeting and written comments were solicited in a booklet which contained all three proposed plans being presented (Plans for Sites SS015, SS0222, OW024). |
Dennis Shepard |
5/24/2016 |
Document, Report, or Work plan Review - other |
DEC provided comments for the Draft Record of Decision for the site. |
Dennis Shepard |
7/28/2016 |
Document, Report, or Work plan Review - other |
DEC approved the 2016 Site SS015 Treatment Area Verification Sampling Plan. |
Dennis Shepard |
10/26/2016 |
Meeting or Teleconference Held |
A restoration Advisory board meeting was held in Galena Alaska to discuss the general and specific status of site investigations and cleanup at Galena. |
Dennis Shepard |
8/4/2017 |
CERCLA ROD Approved |
Approval of Record of Decision (ROD) for South Apron Maintenance Area (SS015) |
Jamie McKellar |
8/22/2017 |
CERCLA Remedial Design/Remedial Action Plan Approved |
Conditional Approval of Remedial Design and Remedial Action (RD/RA) Work Plan for South Apron Maintenance Area (SS015), pending signing of the Record of Decision (ROD) for this site. |
Jamie McKellar |
8/8/2018 |
Site Visit |
DEC conducted a site visit at the Former Forward Operating Location in Galena, AK on August 8-9, 2018. A photo log is available in DEC's electronic file. |
Jamie McKellar |
10/29/2018 |
Site Visit |
On October 23, 2018, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit with inspections of each site was conducted the following day (10/24/2018) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
4/5/2019 |
Site Visit |
On April 2, 2019, DEC staff participated in a Technical Project Team meeting with representatives from USAF, Parsons, CH2M, and ADOT. The TPT meeting was held at the Fairbanks DEC office. On April 3-4, 2019, DEC staff traveled to Galena to participate in meetings with the City Mayor & RAB chair to discuss community concerns about site cleanup; a Proposed Plan meeting for Site DP023, and a community regional advisory board (RAB) meeting to discuss fieldwork completed during the 2018 field season and upcoming 2019 fieldwork. Site visits were also conducted. |
Jamie McKellar |
10/23/2019 |
Meeting or Teleconference Held |
On October 22, 2019, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit was conducted the following day (10/23/2019) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
10/30/2019 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final 2018 Performance Monitoring Report for Sites CPL006, CSS002, OW024, SS006/SS019, SS014/SS017, SS015, SS016, SS018, SS022, SS025, ST009, ST010, and FT001, Former Galena Forward Operating Location, Alaska (Parsons, October 2019) |
Jamie McKellar |
9/4/2020 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 79327 SS015 South Apron Trichloroethene Area. |
Jamie McKellar |
4/21/2021 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: 2020 Performance Monitoring Report for Sites CPL006, CSS002, SS006/SS019, SS017, SS015, SS016, SS018, SS022, ST009, ST010, and FT001, Former Galena Forward Operating Location, Alaska (Parsons, April 2021) |
Jamie McKellar |
8/23/2023 |
Document, Report, or Work plan Review - other |
REPORT APPROVED: Final Remedial Process Optimization Evaluation Report, Former Galena Forward Operating Location, Alaska (Parsons, June 2023) |
Jamie McKellar |
11/15/2023 |
Site Visit |
DEC, DOT, USAF, and contractors met at the Fairbanks DEC office on May 2, 2023 for a Technical Project Team meeting. The following day a site visit and Regional Advisory Board (RAB) meeting were held in Galena. Meeting minutes for the TPT and RAB meetings were approved on November 15, 2023. |
Jamie McKellar |
4/23/2024 |
Meeting or Teleconference Held |
CS staff participated in the biannual Technical Project Team (TPT) meeting with representatives from USAF BRAC, Parsons, Jacobs/CH2M Hill, and EA Engineering. The meeting was held at the EA Engineering office in Anchorage, AK. |
Jamie McKellar |
6/27/2024 |
Document, Report, or Work plan Review - other |
DEC approved multiple data quality assessment reports for soil, soil vapor, groundwater, and sediment. Reports were submitted by Parsons and CH2M/Jacobs. Approval letter is dated 6/27/2024. |
Jamie McKellar |
7/16/2024 |
Document, Report, or Work plan Review - other |
DEC approved the Final 2023 Soil Vapor Extraction (SVE) Remediation System Annual Report. The document describes the results of the operations, monitoring, and maintenance (OM&M) activities from October 2022 through September 2023 for five SVE systems at the Former Galena Forward Operating Location. |
Tim Sharp |