Action Date |
Action |
Description |
DEC Staff |
4/4/2011 |
Document, Report, or Work plan Review - other |
DEC received the Workplan for Interim removal action at sites SS005, SS014, SS016, SS017 and AST1569. |
Fred Vreeman |
7/26/2011 |
Cleanup Plan Approved |
DEC approval of the Workplan for Interim removal action at sites SS005, SS014, SS016, SS017 and AST1569 was provided. |
Fred Vreeman |
2/1/2012 |
Document, Report, or Work plan Review - other |
Site Characterization results report received from Air Force. |
Dennis Shepard |
3/29/2012 |
Document, Report, or Work plan Review - other |
Site Characterization report review comments were provided to the Air Force. |
Dennis Shepard |
5/16/2012 |
Document, Report, or Work plan Review - other |
DEC received a Draft Interim Removal Action Excavation Report for Sites SS005, AST1569, SS014, and SS017. |
Dennis Shepard |
9/10/2012 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
11/8/2012 |
Meeting or Teleconference Held |
A meeting was conducted with DEC contractor Shannon and Wilson to identify all remaining data gaps in the site characterization for all Galena Sites including Site AST1569. |
Dennis Shepard |
11/15/2012 |
Document, Report, or Work plan Review - other |
DEC received a Draft Final Redline of the Site Characterization report and a responce to comments. |
Dennis Shepard |
11/15/2012 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79329 name: AST 1569 Electric Power Station |
Dennis Shepard |
11/28/2012 |
Meeting or Teleconference Held |
A meeting between ADEC Staff, the U.S. Air Force (USAF) and USAF contractors was held to identify remaining Data Gaps in nature and extent investigations at Galena Sites. It was agreed that an additional monitoring well would be installed during the 2013 field season to address DEC concerns for Groundwater impacts at Site AST 1569. The well installation soil sampling and groundwater monitoring results are to be presented in a Site Characterization supplemental report. |
Dennis Shepard |
12/19/2012 |
Document, Report, or Work plan Review - other |
ADEC provided comments for the Draft Final Site Characterization results report for Site AST1569. |
Dennis Shepard |
1/16/2013 |
Meeting or Teleconference Held |
A teleconference call was held to resolve remaining issues for the Site Characterization results report. All remaining issues were resolved. |
Dennis Shepard |
1/29/2013 |
Document, Report, or Work plan Review - other |
A Final version of the Site Characterization results report was recieved. |
Dennis Shepard |
10/25/2013 |
Site Characterization Report Approved |
The Site Characterization results report for 1569 Electric Power Station AST (Site AST1569) was approved. DEC/Air Force - comment/response and documentation of the agreements for a supplemental site characterization are documented in the approval letter (ADEC_approval_SCRpt_AST1569). |
Dennis Shepard |
6/24/2014 |
Site Characterization Workplan Approved |
DEC approved the 2013 Supplemental Site Characterization (SC) Sampling Plan, Former Galena Forward Operating Location (FOL), Galena, Alaska. This additional sampling was agreed to during a November 2012 Galena Data Gaps meeting. |
Dennis Shepard |
9/2/2014 |
Site Characterization Report Approved |
DEC approved the Supplemental Site Characterization Results Report, 1569 Electric Power Station (AST 1569 or CSS001). |
Dennis Shepard |
9/29/2014 |
Site Characterization Report Approved |
DEC approved the Addendum Site Characterization (SC) Results Report, 1569 Electric Power Station AST (Site AST1569 or CSS001). The purpose of the addendum was to address requirements for an SC Report under 18 AAC 75.335 (c) (DEC, 2012), specifically, to propose cleanup levels and remedial techniques for the site. |
Monte Garroutte |
8/8/2016 |
Cleanup Plan Approved |
DEC approved the Excavation Cleanup Plan for Site CSS001 (AST1569). |
Dennis Shepard |
10/26/2016 |
Meeting or Teleconference Held |
A restoration Advisory board meeting was held in Galena Alaska to discuss the general and specific status of site investigations and cleanup at Galena. |
Dennis Shepard |
12/19/2016 |
Meeting or Teleconference Held |
A meeting was held to discuss status of several sites and cleanup plans. Site AST 1569 excavation was discussed and the status of the excavation confirmation sampling was reviewed. Several side wall samples remain to be collected and analyzed. |
Dennis Shepard |
4/24/2017 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 79329 AST 1569 Electric Power Station . |
Dennis Shepard |
5/31/2017 |
Final Cleanup Report Reviewed |
DEC approved the ADEC Method Three Risk Evaluation and Cleanup Complete Report for Site CSS001 (AST 1569). The report documents the cleanup activities undertaken and evaluates the cumulative risk from contaminants remaining in site soils. Risk from residual contaminants is below 1 X 10-5 carcinogenic risk and below a Hazard Index of one for non-carcinogenic risk. |
Dennis Shepard |
6/27/2017 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 79329 AST 1569 Electric Power Station . |
Dennis Shepard |
6/30/2017 |
Cleanup Complete Determination Issued |
Based on the information provided to date, it has been determined that the contaminant concentrations remaining on site do not pose an unacceptable risk to human health or the environment. No further remedial action will be required unless new information becomes available that indicates residual contaminants may pose an unacceptable risk. |
Dennis Shepard |