Action Date |
Action |
Description |
DEC Staff |
5/26/1987 |
Document, Report, or Work plan Review - other |
Environmental assessment conducted by the USACE. |
Sammi Castle |
8/29/1988 |
Preliminary Assessment Approved |
PA action added by Shannon and Wilson, Inc., on 2/19/97. Based on FUDS Site Summary, PA was completed 8/29/88; second PA started 8/31/95. |
S&W-Miner |
2/19/1997 |
Site Added to Database |
Site added by Shannon and Wilson, Inc. |
S&W-Miner |
4/17/1998 |
Update or Other Action |
Corps plans Site Investigation in 1998. |
John Halverson |
12/14/1999 |
Update or Other Action |
The site investigation work was postponed and is now scheduled for 2000. |
John Halverson |
4/16/2002 |
Update or Other Action |
DEC received a copy of the Caines Head/Fort McGilvray Preliminary Assessment Report Seward, AK done by Ecology and Environment for EPA and dated Feb. 2002. EPA determined that no further action is required under CERCLA but that State environmental laws and regulations still need to be addressed. |
John Halverson |
5/1/2002 |
Site Ranked Using the AHRM |
Updated location and ranking to reflect EPA START soil sampling. Minor DRO and RRO detected in or near chimneys of several collapsed structures at the South Beach area. |
Bruce Wanstall |
8/18/2004 |
Update or Other Action |
File number issued 2332.38.023 |
Aggie Blandford |
2/23/2011 |
Document, Report, or Work plan Review - other |
Caines Head Site Inspection Quality Assurance Project Plan dated February 2011 and received on this date. |
Sammi Castle |
10/28/2011 |
Document, Report, or Work plan Review - other |
Caines Head Site Inspection Work Plan dated October 2011 and received by ADEC on this date. |
Sammi Castle |
10/3/2012 |
Document, Report, or Work plan Review - other |
Caines Head Site Inspection Report dated September 2012 and received by ADEC on this date. 13 petroleum storage tank sites, seven power house sites, three septic sites, and one former dump site from the FUDS were inspected. |
Sammi Castle |
11/25/2015 |
Document, Report, or Work plan Review - other |
Revised Final Rocky Point Tank Closure Work Plan dated November 2015 and received by ADEC on this date. Work to be performed includes closure of two 300-gallon and one 960-gallon USTs in place. |
Sammi Castle |
8/29/2016 |
Document, Report, or Work plan Review - other |
Final Underground Storage Tank Closure Report dated March 2016 and received by ADEC on this date. Three USTs were closed in place. The tanks included a 960-gallon water UST, 300-gallon diesel UST, and 300-gallon gasoline UST. |
Sammi Castle |
12/1/2016 |
Meeting or Teleconference Held |
CS managers participate in the annual FUDS site management action plan meeting. The purpose of the is to collaborate with FUDS management on site progress and prioritization for all of the formerly used defense sites. FUDS prioritization is based on risk, congressional interest, state input and proximity to other sites on the prioritization list. FUDS has increased environmental restoration funding in Alaska for the 2017 and 2018 field seasons to meet National goals for site progress. |
Darren Mulkey |
3/23/2018 |
Update or Other Action |
New DEC Project Manager assigned. |
Jamie McKellar |
6/7/2018 |
Update or Other Action |
REPORT RECEIVED: Draft Declaration of Project Closeout Decision for Caines Head / Fort McGilvray Formerly Used Defense Site. Prepared by USACE. Dated June 2018. Comments requested from DEC by July 6, 2018. |
Jamie McKellar |
8/7/2018 |
Document, Report, or Work plan Review - other |
COMMENTS SUBMITTED: DEC to USACE for the Draft Declaration of Project Closeout. Prepared by USACE. Dated June 2018. |
Jamie McKellar |
5/9/2019 |
Update or Other Action |
Sent an email to USACE requesting a status update on the Project Closeout document. DEC provided comments on August 7, 2018. To date, USACE has not submitted a response to comments. |
Jamie McKellar |
5/20/2020 |
Update or Other Action |
On October 28, 2019 DEC sent a follow up email to the USACE/FUDS Program which detailed the following 1) In 2015, DEC approved the use of Table B2 Method Two Ingestion cleanup levels for petroleum hydrocarbon contaminated soil at the Rocky Point portion of the Caines Head project. If USACE intends to use cleanup levels other than migration to groundwater in the other three areas (North Beach, Battery 293, and South Beach), written documentation supporting the use of Table B2 Ingestion Cleanup levels at each of the other three areas must be submitted to DEC for review and approval. 2) One sample collected at the Battery 293 Mess Hall Man Hole Septic Tank Vault exceeds the Table B1 Human Health Cleanup level for benzo(a)pyrene. Additional investigation must be conducted at this site to delineate the extent of contamination. |
Jamie McKellar |
8/14/2020 |
Document, Report, or Work plan Review - other |
On August 14, 2020, DEC issued a letter to USACE indicating that DEC does not concur with the submitted 2020 Project Closeout Report Containerized Hazardous, Toxic, and Radioactive Waste Project #F10AK0039-02. |
Jamie McKellar |
8/19/2020 |
Site Visit |
On 8/19/2020, DEC staff visited North Beach and Battery 293. |
Jamie McKellar |
11/5/2020 |
Meeting or Teleconference Held |
DEC and the landowner, DNR, had a meeting to discuss Caines Head. DEC provided a general site status update. |
Jamie McKellar |
11/10/2020 |
Update or Other Action |
DEC received guidance from Region 10 EPA that the Battery 293 Septic Vault falls under the purview of the EPA's UIC Program and must be closed out in coordination with EPA. |
Jamie McKellar |
6/21/2021 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final Project Closeout Report, Containerized Hazardous, Toxic, and Radioactive Waste Project # F10AK0039-02, Caines Head / Rocky Point Formerly Used Defense Site Seward, Alaska (USACE, June 2021) |
Jamie McKellar |
11/7/2022 |
Meeting or Teleconference Held |
CS Staff participated in a Caines Head scoping meeting with USACE. |
Jamie McKellar |
6/26/2023 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 73577 name: auto-generated pm edit Caines Head - Fort McGilvray |
Jamie McKellar |
6/28/2023 |
Update or Other Action |
On 6/27/2023 DEC issued a No Further Action (NFA) letter for Rocky Point, the Battery 293 Ammo Storage and Laundry Building Tanks, and the South Beach Wood Stave Tank & Power house/Garrison Power House. The Caines Head site will remain open until all areas of concern have met the criteria for a cleanup complete determination. The 6/27/2023 NFA letter is available for download on the database. |
Jamie McKellar |