Action Date |
Action |
Description |
DEC Staff |
3/5/2013 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
4/1/2013 |
Document, Report, or Work plan Review - other |
2013- Phase 1 Source Evaluation Report (SER) for SS533 received January 2013. The purpose of this preliminary evaluation was to determine the appropriate path forward for the source area. The source of contamination is suspected to be from a spill released from the heating fuel day tank located in the northeast corner of the building resulting in fuel migrating under the overhead door seals and contaminating the soil outside and north of the overhead door access. Subsequent analytical data (July 2012) indicates this general area was found to have petroleum-impacted soil exceeding cleanup levels. There is insufficient data to determine either extent of contamination or potential risk to receptors. Therefore, a Phase II Source Evaluation Report (SER) should be completed as a site inspection, and additional environmental data will be collected. *Added to CSP: 8/8/2014* |
Anna Iverson |
6/13/2014 |
Update or Other Action |
On April 23, 2014, the Alaska Department of Environmental Conservation and the United States Air Force reached agreement on the State-Eielson Air Force Base Petroleum Site Restoration Agreement (Two-party Agreement). This agreement was established to perform any necessary assessment, monitoring, remediation and cleanup determinations for petroleum contaminated sites at Eielson Air Force Base. This site was identified as a petroleum contaminated site requiring a response action and its cleanup will continue under Alaska regulations, following the procedures established in the agreement. |
Monte Garroutte |
3/17/2015 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area, ranking based off Phase 1 SER. |
Anna Iverson |
8/7/2015 |
Document, Report, or Work plan Review - other |
DEC provided comments to the USAF on the draft "2014 Site Characterization Report, Various Sites, Eielson Air Force Base, Alaska dated June 2015 (the 2014 CRP SCR). The 2014 CRP SCR describes sampling activities completed at PL001(M), CS082, SS530, SS068, SS083, TU531, CS074, CG517, SS533, TU077, SS519, SS079, CS525 at Eielson Air Force Base in July, August and September of 2014. Sampling of soil and groundwater was conducted to evaluate data gaps from previous investigations; delineate the nature and extent of soil and groundwater contamination; determine the potential for co-mingling of plumes from separate sites; and to determine the need, or lack thereof, for further investigation at each site. |
Melinda Brunner |
8/24/2015 |
Site Characterization Workplan Approved |
DEC approved the "Multiple Compliance Restoration Program Sites Phase II Remedial Investigation/Feasibility Study Work Plan, Eielson Air Force Base, Alaska" dated August 2015. The work plan describes soil and groundwater sampling that will occur at SS533; fieldwork is scheduled to begin in August 2015. |
Melinda Brunner |
10/28/2016 |
Update or Other Action |
DEC acknowledged receipt of the Draft Multiple Compliance Restoration Program Sites Interim Activities Report, Eielson Air Force Base, Alaska (July, 2016). DEC did not provide comments on the Interim Report and is reserving review and comments for the completed characterization reports. |
John O'Brien |
11/14/2016 |
Document, Report, or Work plan Review - other |
DEC reviewed and provided comments on the Draft 2014 Site Characterization Report for Various Sites, Appendix F - Data Quality Assessment, Eielson Air Force Base, Alaska (June, 2015). |
John O'Brien |
12/16/2016 |
Document, Report, or Work plan Review - other |
DEC completed review of the 2014 "Site Characterization Report, Various Sites - Data Quality Assessment" and resolved all comments. |
Monte Garroutte |
3/7/2017 |
Site Characterization Report Approved |
DEC approved the 2014 Site Characterization for Multiple Sites (PL001 [M], SS068, CS074, TU077, SS079, CS082, SS083, CG517, SS519, CS525, SS530, TU531, and SS533), Report 2 (January 2017). Report 2 concluded that further investigation is required to fully delineate the nature and extent of soil and groundwater contamination present at all 13 Compliance Restoration Program (CRP) sites described. |
John O'Brien |
7/19/2018 |
Site Characterization Report Approved |
DEC issued an approval letter for Site Characterization Report for Source Areas SO066, CG505, CS074, SO503, MY529, SS530, SS533, TU531, and CS082 dated February 2018. |
Bri Clark |
11/20/2018 |
Document, Report, or Work plan Review - other |
DEC issued comments on the Draft Decision Document for Installation Restoration Program Source Areas CS074, CS082, MY529, SS530, TU531, and SS533, dated August 2018. |
Bri Clark |
4/11/2019 |
Document, Report, or Work plan Review - other |
DEC completed a review of the response to comments and draft final Decision Document for Installation Restoration Program Source Areas CS074, CS082, MY529, SS530, TU531, AND SS533, dated August 2018. The Air Force is revising the document to reflect recent metals evaluation outcomes. These sites are all in the 2 party agreement. |
Dennis Shepard |
4/16/2019 |
CERCLA Removal Action Plan |
DEC received the "Remedial Action-Construction at Multiple Sites: CS074, CS082, MY529, SO501, SS530, SS533, and TU531, Draft Uniform Federal Policy - Quality Assurance Project Plan," dated April 2019 for review. |
Bri Clark |
5/8/2019 |
Document, Report, or Work plan Review - other |
The Alaska Department of Environmental Conservation (DEC) provided review comments for the Draft Uniform Federal Policy – Quality Assurance Project Plan, Remedial Action – Construction at Multiple Sites: CS074, CS082, MY529, SO501, SS530, SS533, and TU531, Eielson Air Force Base, April 2019. |
Dennis Shepard |
5/20/2019 |
Document, Report, or Work plan Review - other |
DEC approved the Final Uniform Federal Policy – Quality Assurance Project Plan, Remedial Action – Construction at Multiple Sites: CS074, CS082, MY529, SO501, SS530, SS533, and TU531. The work plan details the excavation of petroleum contaminated soils at these |
Dennis Shepard |
6/3/2019 |
Cleanup Level(s) Approved |
DEC approved the Final Decision Document for Installation Restoration Program Source Areas CS074, CS082, MY529, SS530, TU531, AND SS533, . The document identifies the cleanup levels and selected remedy to address six 2-party petroleum sites at Eielson Air Force Base. |
Dennis Shepard |
3/3/2021 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 79415 Eielson AFB Bldg 1316. |
Axl LeVan |
5/17/2022 |
Document, Report, or Work plan Review - other |
DEC provided comments for the Draft Work Plan, 2022 Installation-Wide Monitoring Program, Eielson AFB, Alaska, Revision 02, April 2022 Eielson Air Force Base, Alaska. The work plan identifies annual sampling requirements for 1 monitoring well at site SS533. |
Dennis Shepard |
9/18/2023 |
Document, Report, or Work plan Review - other |
DEC reviewed and provided comments on the "Eielson AFB Two-Party Sites, Periodic Review - Draft, August 2023". The document reviewed and recorded the current status of two party sites (managed by USAF and DEC) at Eielson Air Force Base. |
Axl LeVan |
12/21/2023 |
Document, Report, or Work plan Review - other |
DEC reviewed and approved "Draft-Final Periodic Review Report for Two-Party Sites at Eielson Air Force Base, Alaska, November 2023". This report documents the evaluation of the Interim Land Use Controls (Interim LUCs) for 23 two-party sites at EAFB. |
Axl LeVan |
6/21/2024 |
Document, Report, or Work plan Review - other |
DEC reviewed and provided comments on the "Periodic Review Report for Two-Party Sites, Eielson Air Force Base, Alaska, April 2024." DEC had previously approved the document, but is reviewing an updated version after substantial changes to the document. This report documents the evaluation of the Interim Land Use Controls (Interim LUCs) and remedy implementation for 17 sites at EAFB. |
Axl LeVan |
7/9/2024 |
CERCLA ROD Periodic Review |
DEC reviewed and approved the "Final Periodic Review Report for Two-Party Sites, Eielson Air Force Base, Alaska, July 2024". This report documents the evaluation of the Interim Land Use Controls (Interim LUCs) for 17 sites at EAFB. DEC approved a previous version of periodic review before substantial changes based on USAF legal review. Based on this DEC provided a new comment matrix addressing the updated version. |
Axl LeVan |