Site Report: Fort Wainwright Hangar 7-8 (Bldg 2077) South Parking Lot

Site Name: Fort Wainwright Hangar 7-8 (Bldg 2077) South Parking Lot
Address: Hangar 7-8; Building 2077; SE End of Runway, Fort Wainwright, AK 99703
File Number: 108.38.120
Hazard ID: 26047
Status: Active
Staff: Carly Jensen, 9072697558 carly.jensen@alaska.gov
Latitude: 64.831354
Longitude: -147.595592
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

The Hangar 7-8 (Building 2077) South Parking Lot is located on Montgomery Road within the Aviation Task Force area on U.S. Army Garrison Alaska, Fort Wainwright (USAG FWA). During trenching activities in 2011 to install head-bolt outlets in the parking lot, petroleum contaminated soil was encountered. The petroleum contaminated soil was excavated to 4 feet below ground surface. Field screening and olfactory observations from the bottom of the excavation (at 4 ft depth) indicated the presence of petroleum contamination. One analytical sample was collected from the location with the highest photoionization detector reading. Gasoline range organics (GRO) and diesel range organics (DRO) exceeded 18 AAC 75.341 Table B2 migration to groundwater cleanup levels. In 2015 additional soil borings were advanced to determine extent of the petroleum contamination discovered in 2011. Five soil borings were advanced, and one was completed as a monitoring well. Soil results collected in 2015 exceeded 18 AAC 75.341 Table B2 inhalation cleanup levels for GRO, and migration to groundwater cleanup levels for DRO, 1,2-dichloroethane, and naphthalene. The exceedances were from the same area contamination was identified in 2011. All groundwater results were below 18 AAC 75.345 Table C cleanup levels. The extent of the remaining contamination has been delineated and covered by asphalt. The site is greater than 30 feet away from the nearest building. Current and future use of the site is industrial. The corresponding Army HQAES site number is: 02871.1124.

Action Information

Action Date Action Description DEC Staff
5/1/2013 Spill Transferred from Prevention Preparedness and Response Program Spill transferred by PERP staff Paul Lhotka. Spill no. 11309925102; spill date = 9/8/11; substance = petroleum; quantity = unknown; PERP file no. 108.02.002. Mitzi Read
5/2/2013 Document, Report, or Work plan Review - other 2011 Building 2077 Parking Lot After-Action Report, Draft, April 16, 2013 ADEC has no comment on the report and has created a new site in the Contaminated Sites Database, Fort Wainwright Hangar 7-8 (Bldg 2077) South Parking Lot, Hazard ID 26047. The report documents a release with a soil sample analyzed containing gasoline range organics of 1390 mg/kg and diesel range organics of 2950 mg/kg. Based on field screening, visual and olfactory observations is the contamination appeared to extend to the west, north and south of the sample point. Groundwater was not investigated. ADEC requests this site be added to the Fort Wainwright Army Environmental Database Record and included in the Installation Action Plan for investigation to delineate the extent of the contamination. Debra Caillouet
5/2/2013 Site Added to Database A new site has been added to the database Mitzi Read
5/2/2013 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 79453 name: South Parking Lot Debra Caillouet
12/13/2016 Meeting or Teleconference Held A two day Federal Facilities Agreement (FFA) and Stakeholders meeting was held on December 13 & 14, 2016. The main focus of the meeting was to develop a site discovery and site intake process that would satisfy requirements of the Fort Wainwright FFA, RCRA Permit, and two party agreements. The Army, EPA and DEC committed to a flowchart of the preliminary source evaluation process. Timelines were established for scoping a land use control implementation plan (LUCIP) and developing a contracting schedule for Fort Wainwright contaminated site investigations and remedial actions. Seven sites were proposed for inclusion into the FFA (three party agreement) by the Army and the RPMs documented the assignment of the regulatory path for these sites using a newly developed and agreed to signature form. Dennis Shepard
1/1/2017 Document, Report, or Work plan Review - other DEC approved the 2015 Annual Institutional Controls Report, Fort Wainwright, Alaska (August 2016). Dennis Shepard
4/15/2021 Document, Report, or Work plan Review - other DEC provided review comments for the "Sampling and Analysis Plan for FTW434 Hangar 7/8 Version 2.1" dated March 2021 to the U.S. Army. The sampling and analysis plan describes proposed field screening and analytical sampling procedures to follow during a construction project to upgrade and replace the infrastructure at the Building 2077 South Parking Lot site (Hangars 7&8). Erica Blake
4/22/2021 Document, Report, or Work plan Review - other DEC responded to review comment responses for the "Sampling and Analysis Plan for FTW434 Hangar 7/8 Version 2.1" dated March 2021. DEC requested additional revisions be made and a final work plan sent for review and approval. Erica Blake
4/22/2021 Document, Report, or Work plan Review - other DEC provided review comments for the draft "Environmental Summary Report: Building 2077 Parking Lot Site" dated February 4, 2021 to the U.S. Army. The report summarizes environmental investigations conducted at the B2077 site since 2011 and discusses the potential human health and environmental risks associated with the remaining petroleum contamination. Gasoline range organics (GRO) remains in the subsurface (approximately 4-5 feet below ground surface) above DEC's 18 AAC 75.341(c) Table B2 Method Two inhalation and maximum allowable levels. Erica Blake
4/29/2021 Document, Report, or Work plan Review - other DEC provided approval for the "Sampling and Analysis Plan for FTW434 Hangar 7/8 Version 2.3" dated March 2021 to the U.S. Army. The sampling and analysis plan (SAP) describes environmental tasks which include field screening and analytical sampling to ensure protection of worker health and safety during construction work at the Hangar 7 & 8 site on Fort Wainwright, Alaska. Erica Blake
6/28/2021 Document, Report, or Work plan Review - other ADEC provided review comments for the Doyon Utilities Addendum to the Post-Wide Sampling and Analysis Plan, Ft. Wainwright Army Post, Fairbanks, Alaska P2377 Hangars 7 & 8 Building 2077 Upgrades to Electrical Services (dated June 24, 2021) to the U.S. Army. The document describes utility upgrade work planned to be conducted around and within the Building 2077 South Parking Lot site. Erica Blake
6/30/2021 Document, Report, or Work plan Review - other ADEC provided approval for the “Doyon Utilities Addendum to the Post-Wide Sampling and Analysis Plan, Ft. Wainwright Army Post, Fairbanks, Alaska P2377 Hangars 7 & 8 Building 2077 Upgrades to Electrical Services” (dated June 28, 2021) to the U.S. Army. The sampling and analysis plan (SAP) will involve completing an electrical service upgrade at the Hangar 7 & 8 (Building 2077) area. Soil disturbing activity will be limited to trenching, utility pole placement and transformer demolition and installation. Erica Blake
11/1/2021 Document, Report, or Work plan Review - other ADEC received the following report "P2377 Hangars 7&8 Building 2077 Upgrades to Electrical Services Project, Fort Wainwright, Alaska" (dated October 18, 2021) from the U.S. Army. The document describes field screen and analytical results from utility upgrades that occurred at the Building 2077 South Parking Lot site. Analytical soil sample results were below ADEC cleanup levels. The document was provided to ADEC for information only. Erica Blake
12/23/2021 Document, Report, or Work plan Review - other ADEC provided approval for the "Final Environmental Summary Report: Building 2077 Parking Lot Site" (dated December 23, 2021) to the U.S. Army. The summary report discusses environmental investigations and results from work conducted at the Building 2077 South Parking Lot site since 2011. Gasoline range organics (GRO) remains in the soil above the 18 AAC 75.341 Table B2 inhalation and maximum allowable cleanup levels. Additional investigation at this site will be conducted to cleanup the remaining contamination. Erica Blake

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close