Action Date |
Action |
Description |
DEC Staff |
5/22/2013 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
6/12/2013 |
Potentially Responsible Party/State Interest Letter |
DEC letter was sent today to the manager of the facility to inform the responsible party of the Alaska Statutes and Regulations that outline cleanup responsibility and authorize DEC to recovery costs associated with providing oversight during the cleanup, evaluating exposure pathways for contamination, and making determination for site closure. |
Bruce Wanstall |
6/26/2013 |
Offsite Soil or Groundwater Disposal Approved |
DEC approved the transport of heating oil contaminated soil off-site for remediation. Volume is estimated at seven cubic feet. |
Bruce Wanstall |
8/7/2013 |
Site Visit |
DEC accompanied Chilkat Environmental, environmental consultant to Captain's Choice Hotel to the site and inspected the buried heating oil tank site and the contaminated groundwater recovery and treatment system that was recently installed. Groundwater levels were low and the system was idle at the time of the visit. The heating oil tank has been thoroughly drained and abandoned in-place due its location under concrete near the foundation of the building. |
Bruce Wanstall |
12/6/2013 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79462 name: Abandoned Heating Oil UST |
Bruce Wanstall |
6/2/2014 |
Document, Report, or Work plan Review - other |
DEC evaluated and by letter sent approval of the letter report submitted by Chilkat Environmental for semi-annual reporting requirement on implementation of the work plan to maintain and monitor the oil water separator and water discharge filtration system. Laboratory results on discharge water were below laboratory reporting limits for contaminant of concern DRO petroleum hydrocarbons. |
Bruce Wanstall |
10/31/2014 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 79462 Abandoned Heating Oil UST. |
Bruce Wanstall |
11/14/2014 |
Spill Transferred from Prevention Preparedness and Response Program |
Spill transferred by PERP staff Sarah Moore. Spill no. 13119912601; spill date = 5/6/13; substance = diesel; quantity = unknown (less than 1,000 gallons). |
Mitzi Read |
2/6/2015 |
Document, Report, or Work plan Review - other |
DEC has evaluated and approved by letter to the RP: February 2015 Update for Captain’s Choice Motel in Haines (Report) submitted by Chilkat Environmental Inc. (CEI). DEC finds the Report is consistent with DEC approved plan for mitigation of heating oil tank failure at the Captain’s Choice Hotel. The plan includes maintenance and monitoring of the oil-water-separator and carbon filter system and biannual sampling for effectiveness.
Sampling was not performed in December 2014 because of insufficient water flow. Sampling was performed January 14, 2015 from the outfall of the granulated activated carbon filter without replacement of the media since May of 2014. Media was replaced after the sampling event. The log of maintenance intervals for free product recovery performed on the Oil/Water separator shows a total of 52.5 gallons of fuel recovered during the period.
The results of sampling, is that the concentration of diesel range (DRO) petroleum hydrocarbon in the treated discharge water (0.21 milligrams per liter), is below cleanup levels in 18 AAC 75.340 Method Two, Table C. Since the results indicate the water treatment is effective, in accordance with 18 AAC 75.360 Captain’s Choice will continue to implement the approved plan with a biannual schedule for sampling and reporting. |
Bruce Wanstall |
6/2/2015 |
Document, Report, or Work plan Review - other |
Evaluate the Chilkat Environmental Memo Report of treated water analytical results. Results are within the acceptable range for removal of dissolved petroleum from the oil/water separator but need lab report to validate the data. Send email acknowledging receipt and request copy of the lab report. |
Bruce Wanstall |
6/3/2015 |
Document, Report, or Work plan Review - other |
The Friedman & Bruya Inc. sample laboratory report received from Chilkat Environmental Inc. by email, was evaluated and is approved by DEC for water treatment effectiveness at the Captain's Choice site. |
Bruce Wanstall |
2/16/2016 |
Update or Other Action |
Collaborate with the consultant Chilkat Environmental regarding regulatory and technical issues associated with the site cleanup, monitoring and reporting schedule now that Larry Beck is no longer managing the business. |
Bruce Wanstall |
5/25/2016 |
Document, Report, or Work plan Review - other |
DEC has reviewed the memo by Chilkat Environmental Inc. DEC concludes the laboratory data, field data log and description of performance and maintenance of the collection and treatment systems at the reference site is acceptable and in accordance with the approved long term plan. The Report is approved in accordance with 18 AAC 75.335(d). DEC looks forward to the fall 2016 report. |
Bruce Wanstall |
8/29/2016 |
Update or Other Action |
Update from Elijah that he will ensure that granulated activated carbon is ready for the change out this fall. |
Bruce Wanstall |
6/15/2017 |
Document, Report, or Work plan Review - other |
DEC approved a work plan to replace the old water treatment system with a new one. The anticipated one cubic yard that may get excavated will be stored in Greg Richmond's Shop. DEC will track this when the subsequent report arrives from Chilkat Environmental Inc. Environmental sampling at the limit of excavation is anticipated in this removal action but no water samples will be collected (no water in system) because the system was tested as previously constructed. The granulated activated carbon will be replaced and laboratory samples will be collected and a report with water samples will be submitted to DEC in January 2018. |
Bruce Wanstall |
7/5/2017 |
Update or Other Action |
Contaminated Soil Transport and Treatment form approved by ADEC this date. |
Kristin Thompson |
8/3/2017 |
Update or Other Action |
Soil sampling results received. |
Amy Rodman |
6/22/2018 |
Site Visit |
Site visit: met RP, took pictures and videos of new water treatment system. |
Amy Rodman |
7/3/2018 |
Site Characterization Report Approved |
Report approval letter emailed to RP. Requested further information, due July 31, 2018. |
Amy Rodman |