Action Date |
Action |
Description |
DEC Staff |
9/19/1996 |
Site Visit |
On September 19, 1996, ADEC conducted a site inspection where the spilling of a 500 gallon tank was reported. Soil samples collected downgradient of the 500 gallon tank at the riverbank, where surface water sheen was noted, contained DRO contamination up to 514 mg/kg. Upon further site inspection, surface soil staining was noted beneath the above ground storage tanks located at the caretakers cabin and the generator shed. Soil samples collected at the caretaker’s cabin contained DRO up to 13,000 mg/kg. |
Gail Volt |
8/8/1997 |
Document, Report, or Work plan Review - other |
ADEC received a Sampling Report dated August 8, 1997, submitted by Ellis. The report analyzed two main area of contamination; the soil near the dock and the soil near the caretaker and generator shed. 9 soil samples collected along the river bank, at 6 inches bgs, did not contain contamination. Four soil samples collected down gradient of the Generator shed contained DRO up to 26,000 mg/kg and GRO up to 1,200 mg/kg. (Note: benzene was not detected, but the PQL for benzene was up to 1.3 mg/kg therefore this result is bias low.) Four soil samples collected from the caretaker’s cabin contained DRO up to 9,200 mg/kg. During the sampling events a passive bioventing remediation system was installed in the area of contamination at the Generator Building and an area adjacent to the Caretaker Cabin at 4 ft. bgs. During the system’s installation, the soils were aerated and fertilizer was added. |
Grant Lidren |
1/6/2000 |
Site Added to Database |
Diesel, and gasoline contamination. |
Shah Alam |
2/8/2001 |
Site Ranked Using the AHRM |
Site ranked based on information in file. |
Scott Pexton |
2/14/2001 |
Update or Other Action |
Letter sent to Lee Brown with request for a sampling plan to confirm the effectiveness of bioventing treatment system. |
Scott Pexton |
5/1/2001 |
Update or Other Action |
Received email attachment with Sampling and Analysis Plan prepared by ICRC. |
Scott Pexton |
5/16/2001 |
Update or Other Action |
Letter sent to Catherine Shuman of ICRC with comments on Sampling and Analysis plan. |
Scott Pexton |
6/19/2001 |
Meeting or Teleconference Held |
Met with Catherine Shuman and Kurt Kinnevan of ICRC environmental consultants to discuss ADEC comments on sampling and analysis plan. |
Scott Pexton |
6/26/2001 |
Update or Other Action |
Received Final Submittal - Sampling and Analysis Plan prepared by ICRC. Project schedule included for evaluation of passive bioventing system. |
Scott Pexton |
6/28/2001 |
Site Characterization Workplan Approved |
Letter sent to Catherine Shuman of ICRC with approval of Sampling and Analysis plan to collect soil samples and install three monitoring wells and collect groundwater samples. The sampling and analysis plan will help to determine the effectiveness of a passive soil venting remediation system installed during 1997 and to characterize impacts to groundwater. |
Scott Pexton |
9/20/2001 |
Update or Other Action |
ADEC received letter from Department of Law that indicated a check was received from the Ugashik River Lodge (Bill #CO25138). |
Scott Pexton |
11/19/2001 |
Update or Other Action |
Received email from Catherine Shuman of ICRC. Email message included an attachment with a copy of text of a Draft Confirmation Sampling Report. Email message indicated an original report would follow and should include the appendices with analytical data, photographs, and chain-of-custody's. |
Scott Pexton |
11/23/2001 |
Update or Other Action |
ADEC received hardcopy of DRAFT Confirmation Sampling Report prepared by ICRC for Ugashik River Lodge, Inc. Six soil borings were collected at 1 ft. to 12 ft. bgs; 3 samples from the generator’s shed contained DRO up to 11,800 mg/kg and GRO up to 462mg/kg and 3 samples from the caretaker’s cabin contained DRO up to 4750 mg/kg. A GW sample collected from the generator shed and the caretaker cabin did not contain detectable levels of contaminants. |
Scott Pexton |
1/3/2002 |
Update or Other Action |
Letter sent to Catherine Shuman of ICRC with comments on draft Confirmation Sampling Report and request for submittal of a final report that addresses the comments provided. |
Scott Pexton |
4/9/2002 |
Update or Other Action |
ADEC received letter from Department of Law indicating receipt of a check from the Ugashik River Lodge (Bill #CO25282). |
Scott Pexton |
5/15/2002 |
Update or Other Action |
ADEC received letter from Department of Law that indicated a check was received from the Ugashik River Lodge (Bill #CO25282). |
Scott Pexton |
7/8/2002 |
Update or Other Action |
Received Dept. of Law notification of receipt of cost recovery check. |
Scott Pexton |
8/20/2002 |
Update or Other Action |
Date of letter from Dept. of Law acknowledging receipt of final payment on CO25282, received September 11, 2002 by CS. RP info: Clyde Bradford, Ugashik River Lodge, Inc., 65 East 400 South, Orem UT 84058, Phone 800-233-4868. |
Eileen Olson |
11/10/2004 |
Spill Transferred from Prevention Preparedness and Response Program |
Transfer from PERP to CS 1/30/97, Spill # 96269920401, 50 gallons of diesel. |
Ann Rider |
11/10/2004 |
Spill Transferred from Prevention Preparedness and Response Program |
Transfer from PERP to CS "no date" , NFAD 6/19/97, 5 gallons of gasoline, spill # 96269928401. |
Ann Rider |
2/8/2005 |
Update or Other Action |
File number issued 2571.38.002. |
Aggie Blandford |
8/26/2005 |
Update or Other Action |
There is a work party headed out to the site today 8/26 to do a release investigation and fill some data gaps that I identified and wanted cleared up. They will be sampling wells at the site and putting in a couple more and getting samples from them as well.DRO and GRO contamination near the generator shed is where most of the concern for this site is. It appears to taper off once the soil borings get around the 8 to 10 feet level, which does not really substantiate the assertion that major releases have occurred here. There is a cemented lens of volcanic ash at the site that is impermeable according to reports from the site. This seems reasonable since there appears to be water perched above this lens that water samples have been collected from in the past. |
Eric Henry |
10/6/2005 |
Update or Other Action |
Site transferred to KDO and assigned to Paul Horwath. Former PM was Eric Henry. |
Linda Nuechterlein |
10/21/2005 |
Update or Other Action |
notified RP and consultant of change in ADEC project manager. |
Donald Seagren |
10/24/2005 |
Update or Other Action |
After seeing that a assessment report was due shortly, Clarus was contacted by telephone to let them know of change in ADEC PMs. Lee High is the new Clarus PM. Provided mailing information in order to send the report. |
Donald Seagren |
10/27/2005 |
GIS Position Updated |
Using the Site Background and aerial photos in a Final Submittal Sampling and Analysis Plan Ugashik River Lodge, from ICRC, dated June 22, 2001, in conjunction with TopoZone Pro, entered the coordinates for this site. Metadata includes USGS Topo Map 1:63K, on a Medium Size Map, View Scale 1:24,000, Coordinate Datum NAD83. Moderate to High degree of confidence in accuracy of location. |
Alyce Hughey |
12/21/2005 |
Update or Other Action |
Reviewed Ugashik River Lodge Confirmation Sampling Report, submitted by Clarus, dated October 28, 2005. Six soil samples were collected: 4 samples collected from the Generator building contained benzene up to 0.0706 mg/kg and two samples collected from the caretaker cabin contained DRO up to 244 mg/kg A GW sample collected from the generator shed and the caretaker cabin did not contain detectable levels of contaminates. Repairs to bioventing systems to be made as soon as practicable. No evidence of migration of contamination to GW or adjacent Ugashik River. |
Donald Seagren |
2/12/2007 |
Exposure Tracking Model Ranking |
Intitial Ranking Complete for Source Area: 73583 (Autogenerated Action) |
|
6/11/2008 |
Update or Other Action |
Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. |
Alyce Hughey |
5/29/2009 |
Update or Other Action |
File transferred from Soldotna to Anchorage 6-1-09. Project Manager changed from Paul Horwath to Linda Nuechterlein. |
Alyce Hughey |
8/7/2009 |
Update or Other Action |
Land was sold by Ugashik River Lodge, INC. to Ugashik LLC on March 16, 2009. ADEC has contacted the new landowner who is willing and able. |
Grant Lidren |
8/31/2009 |
Update or Other Action |
On this date ADEC received confirmation, per ADEC recommendation, that the monitoring wells were decommissioned. |
Grant Lidren |
9/23/2009 |
Update or Other Action |
ADEC received the conforming copy of the NEC deed notice on this date from ADNR. |
Grant Lidren |
10/27/2009 |
Cleanup Complete Determination Issued |
The Alaska Department of Environmental Conservation (ADEC), Contaminated Sites Program, has reviewed the environmental records associated with the Ugashik River Lodge.
Based on the information provided to date, the ADEC has determined that the contaminant concentrations remaining on site do not pose an unacceptable risk to human health or the environment, and no further remedial action will be required as long as the site is in compliance with established institutional controls. This decision is based on the administrative record for the Ugashik River Lodge, which is located in the offices of the ADEC in Anchorage, Alaska. |
Grant Lidren |
10/27/2009 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Grant Lidren |
10/27/2009 |
Update or Other Action |
ADEC received a signed CC-IC Agreement on this date. |
Grant Lidren |
6/13/2012 |
Update or Other Action |
Staff changed from Grant Lidren to IC Unit. |
Kristin Thompson |
7/10/2012 |
Institutional Control Compliance Review |
IC review conducted |
Evonne Reese |
1/2/2015 |
Institutional Control Update |
An IC reminder letter was issued to the responsible party on this date. |
Kristin Thompson |
6/18/2018 |
Institutional Control Compliance Review |
IC compliance review conducted. Closure/IC Details updated. |
Kristin Thompson |
9/21/2020 |
Institutional Control Compliance Review |
An IC reminder letter was issued to the responsible party on this date. |
Cascade Galasso-Irish |