Site Report: City of Ketchikan Pump Station 5
Site Name: | City of Ketchikan Pump Station 5 |
---|---|
Address: | 2959 Tongass Avenue, Ketchikan, AK 99901 |
File Number: | 1516.26.037 |
Hazard ID: | 26121 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 55.352221 |
Longitude: | -131.684683 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
A registered 550-gallon diesel storage tank (Tank #1) located under the driveway adjacent to Wastewater Pump Station 5 (PS5) near the Ketchikan waterfront was removed in August 2010 because the facility no longer needed to store a large quantity of fuel at that location. Sampling and soil excavation conducted in 2011 did not meet 18 AAC 78 requirements for permanent closure. During later investigations the former locations of the tank and piping were not precisely known so that sampling locations were to some extent estimated. On May 1, 2013 consultant BGES sampled soil and groundwater at the presumed former UST and UST piping locations with the maximum contaminant level in soil 110 mg/kg DRO (below the applicable cleanup level) and the groundwater analytical result 2.2 mg/L, exceeding the DRO cleanup level for groundwater of 1.5 mg/L. BGES recommends the site for no further action status.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
9/26/2011 | Update or Other Action | ADEC received two reports, the "Comprehensive Report for UST Removal at PUmp Station 5, Tank ID 1169" and the "Comprehensive Report for UST Removal at Pump Station 2, Tank ID 1178" with cover letter from the City of Ketchikan dated 9/26/2011. | Eileen Olson |
9/26/2011 | Update or Other Action | ADEC received two reports, the "Comprehensive Report for UST Removal at PUmp Station 5, Tank ID 1169" and the "Comprehensive Report for UST Removal at Pump Station 2, Tank ID 1178" with cover letter from the City of Ketchikan dated 9/26/2011. | Eileen Olson |
2/13/2013 | Update or Other Action | ADEC UST staff received a letter from R&M Consultants in response to a request for field notes for work by consultant William Schulz in 2010; the field notes could not be found. | Eileen Olson |
2/19/2013 | Update or Other Action | ADEC Industry Preparedness Program sent letter with subject line "Request for Corrective Action Work Plan, ADEC Facilities #1169 and #1178". The letter provided review comments for site assessment "Comprehensive Report for UST Removal at Pump Station 5", noting that the piping and tank samples were not collected at the appropriate location and depth; all of the product and vent piping was not assessed; no soil sample was collected at the soil/water interface as required when groundwater is suspected to be within five feet below the bottom of the tank; the soil samples colected were not analyzed for BTEX , GRO and PAHs as required for diesel; duplicate and QA/QC samples were not collected; and samples were not collected from stockpiled soil. | Cheryl Paige |
4/30/2013 | Document, Report, or Work plan Review - other | ADEC staff Weimer approved by email the revised work plan by consultant BGES "Work Plan for Supplemental Site Asessments, Underground Storage Tank Closures for Wastewater Pump Stations Two and Five, Ketchikan, Alaska...April 2013" received on 4/29/2013. | Eileen Olson |
6/1/2013 | Update or Other Action | Report on file "Pump Station 2 (ADEC Facility ID No. 1169) and Pump Station 5 (ADEC Facility ID No. 1178)...June 2013" prepared by BGES for S&S General Contractors of Sitka, Alaska on behalf of the City of Ketchikan. | Eileen Olson |
6/1/2013 | Update or Other Action | Report on file "Pump Station 2 (ADEC Facility ID No. 1169) and Pump Station 5 (ADEC Facility ID No. 1178)...June 2013" prepared by BGES for S&S General Contractors of Sitka, Alaska on behalf of the City of Ketchikan. | Eileen Olson |
10/3/2013 | Site Added to Database | A new site has been added to the database | Mitzi Read |
10/3/2013 | Leaking Underground Storage Tank Release Confirmed - Petroleum | LUST site created in CSP database for source area Underground Storage Tank #1 - 550-Gallon Diesel, 79510 | Mitzi Read |
10/3/2013 | Leaking Underground Storage Tank Cleanup Initiated - Petroleum | Administrative action for grant reporting purposes. | Evonne Reese |
10/9/2013 | Cleanup Complete Determination Issued | ADEC issued Decision Document; Corrective Action Complete Determination. No contaminants encountered in site soil exceeded ADEC's most stringent Method Two cleanup levels under 18 AAC 75.341. | Eileen Olson |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | < Method 2 Most Stringent | Soil | 110 mg/kg DRO was maximum concentration encountered; cleanup level is 230 mg/kg. |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. |
No associated sites were found.