Action Date |
Action |
Description |
DEC Staff |
10/25/2013 |
Site Characterization Report Approved |
The Alaska Department of Environmental Conservation (DEC) received a Draft Site Characterization results report for Sites SS014, SS017 and SS021 on May 18, 2012 and provided review comments for the draft on November 21, 2012. A response to comments (RTC) and a Draft Final version of the report was submitted on June 21, 2013. DEC provided comments for the Draft Final version of the report on August 29, 2013.
A comment resolution conference call meeting was held on September 6, 2013 to reach agreement on the final unresolved issues for the report. All DEC comments were adequately addressed and all issues were resolved during the call. A Final version of the report was submitted September 16, 2013. . The Site Characterization results report for Birchwood Hangar (Site SS014), Truck Fill-Stands (Site SS017), and Old Fire Station (Site SS021), Former Galena FOL was approved on October 25, 2013.
|
Monte Garroutte |
9/5/2014 |
Site Characterization Report Approved |
The Alaska Department of Environmental Conservation (DEC) received a draft Supplemental Site Characterization (SC) Results Report for Sites SS014, SS017, and SS021 on May 16, 2014. The Site Characterization was completed in accordance with the approved Final Addendum 01 Work Plan for Site Inspection, Remedial Investigation, and Site Characterization Former Galena Forward Operating Location, Alaska (Work Plan) (CH2M HILL, May 2013) and Final 2013 Supplemental Site Characterization Sampling Plan, Former Galena Forward Operating Location, Alaska (Supplemental Work Plan) (CH2M HILL, July 2013a).
DEC provided comments for the draft report on July 3, 2014. A response to comments (RTC) and a draft final version of the report was submitted on August 8, 2014. The draft final was also discussed on August 30, 2014 and the Air Force agreed to provide revised Table 15-1c of the Galena UFP-QAPP to address comments for the inconsistencies with the Tables 4-14 and 4-15 of the Supplemental SC Results Report. DEC provided a response to the RTC on September 3, 2014, which was discussed in a teleconference call on September 5, 2014. A revised RTC and revised draft final of the document were received by DEC on September 5, 2014. The Supplemental Site Characterization Results Report, Wilderness Hall, Former Building 1872 (Site SS005), Former Galena FOL, Alaska was approved on September 5, 2014.
|
Monte Garroutte |
11/20/2014 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
11/28/2014 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79703 name: SS017 Former Truck Fill Stands |
Monte Garroutte |
10/26/2016 |
Meeting or Teleconference Held |
A restoration Advisory board meeting was held in Galena Alaska to discuss the general and specific status of site investigations and cleanup at Galena. |
Dennis Shepard |
11/2/2016 |
Cleanup Plan Approved |
DEC approved the Cleanup Plan for Site SS014, Birchwood Hanger and Site SS017, Truck Fill Stands, Former Galena Forward Operating Location, Alaska (October 2016). The plan included interim removal actions from which approximately 12,350 CY total - 3,950 CY and 8,400 CY of petroleum contaminated soil were excavated from SS014 and SS017, respectively. Bioventing for contaminants in unsaturated soil, including the vadose zone and in the variably saturated zone, and Sulfate-enhanced bioremediation for contaminants in saturated soil and groundwater. Air sparging/biosparging is also retained as an alternative to sulfate-enhanced bioremediation. |
Dennis Shepard |
8/8/2018 |
Site Visit |
DEC conducted a site visit at the Former Forward Operating Location in Galena, AK on August 8-9, 2018. A photo log is available in DEC's electronic file. |
Jamie McKellar |
10/29/2018 |
Site Visit |
On October 23, 2018, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit with inspections of each site was conducted the following day (10/24/2018) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
4/5/2019 |
Site Visit |
On April 2, 2019, DEC staff participated in a Technical Project Team meeting with representatives from USAF, Parsons, CH2M, and ADOT. The TPT meeting was held at the Fairbanks DEC office. On April 3-4, 2019, DEC staff traveled to Galena to participate in meetings with the City Mayor & RAB chair to discuss community concerns about site cleanup; a Proposed Plan meeting for Site DP023, and a community regional advisory board (RAB) meeting to discuss fieldwork completed during the 2018 field season and upcoming 2019 fieldwork. Site visits were also conducted. |
Jamie McKellar |
10/23/2019 |
Meeting or Teleconference Held |
On October 22, 2019, DEC participated in the Technical Project Team (TPT) meeting with representatives from USAF and ADOT&PF. A site visit was conducted the following day (10/23/2019) in Galena, as well as a regional advisory board (RAB) meeting with members of the community and other interested parties. |
Jamie McKellar |
10/30/2019 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: Final 2018 Performance Monitoring Report for Sites CPL006, CSS002, OW024, SS006/SS019, SS014/SS017, SS015, SS016, SS018, SS022, SS025, ST009, ST010, and FT001, Former Galena Forward Operating Location, Alaska (Parsons, October 2019) |
Jamie McKellar |
7/2/2020 |
Update or Other Action |
Underground storage tank (UST) 1551-1, was located on the north edge of former Building 1551 (Site SS014), and used to power a standby generator. On July 2, 2020, a cleanup complete determination was issued for Site SS014. Contamination associated with UST 1551-1 will be addressed under Site SS017 (Former Truck Fill Stands), tracked under File No. 860.38.066 and Hazard ID 26312. See also the SS014 Closure Letter, available for viewing under that Site (Hazard ID 3965).
|
Jamie McKellar |
4/21/2021 |
Document, Report, or Work plan Review - other |
REPORT APPROVAL: 2020 Performance Monitoring Report for Sites CPL006, CSS002, SS006/SS019, SS017, SS015, SS016, SS018, SS022, ST009, ST010, and FT001, Former Galena Forward Operating Location, Alaska (Parsons, April 2021) |
Jamie McKellar |
8/23/2023 |
Document, Report, or Work plan Review - other |
REPORT APPROVED: Final Remedial Process Optimization Evaluation Report, Former Galena Forward Operating Location, Alaska (Parsons, June 2023) |
Jamie McKellar |
11/15/2023 |
Site Visit |
DEC, DOT, USAF, and contractors met at the Fairbanks DEC office on May 2, 2023 for a Technical Project Team meeting. The following day a site visit and Regional Advisory Board (RAB) meeting were held in Galena. Meeting minutes for the TPT and RAB meetings were approved on November 15, 2023. |
Jamie McKellar |
4/23/2024 |
Meeting or Teleconference Held |
CS staff participated in the biannual Technical Project Team (TPT) meeting with representatives from USAF BRAC, Parsons, Jacobs/CH2M Hill, and EA Engineering. The meeting was held at the EA Engineering office in Anchorage, AK. |
Jamie McKellar |
6/27/2024 |
Document, Report, or Work plan Review - other |
DEC approved multiple data quality assessment reports for soil, soil vapor, groundwater, and sediment. Reports were submitted by Parsons and CH2M/Jacobs. Approval letter is dated 6/27/2024. |
Jamie McKellar |