Skip to content Skip to content

Site Report: ADOT&PF Tok Maintenance Station Class V Injection Well

Site Name: ADOT&PF Tok Maintenance Station Class V Injection Well
Address: Milepost 123.8 Tok Cutoff Highway, Tok, AK 99780
File Number: 130.38.016
Hazard ID: 26347
Status: Active
Staff: Michael Hooper, 9074515174 michael.hooper@alaska.gov
Latitude: 63.325427
Longitude: -142.997494
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

In July, 2011 a Class V underground injection well at the Alaska Department of Transportation & Public Facilities Tok Maintenance Station at Milepost 123.8 Tok Cutoff Highway. Samples were analyzed for metals, volatile organic compounds (VOCs), and semi-volatile organic compounds (SVOCs). Samples were not analyzed for petroleum hydrocarbons. Due to data quality issues, sample results were unreliable and insufficient to determine if contaminants were present above DEC cleanup levels.

Action Information

Action Date Action Description DEC Staff
12/19/2014 Spill Transferred from Prevention Preparedness and Response Program Spill transferred by PERP staff Ashley Adamczak. Spill no. 13309936502; spill date = 12/31/13; substance = unknown; quantity = unknown; source = Class V injection well; PERP file no. 140.02.052. Mitzi Read
2/6/2015 Site Added to Database A new site has been added to the database Mitzi Read
11/17/2016 Meeting or Teleconference Held Meeting with EPA and DOT to discuss status and CAFO requirements. John Carnahan
4/17/2019 Update or Other Action Review of historical data indicate that several tested analytes are above current DEC cleanup levels. Site changed to 'Active' status. John Carnahan
6/13/2019 Meeting or Teleconference Held Meeting held with ADOT&PF, ADEC, and Shannon and Wilson do discuss site scoping and work prioritization for the next year. Michael Hooper
12/5/2019 Meeting or Teleconference Held Meeting held with ADOT and Shannon & Wilson to discuss 2019 sampling season and plans for 2020. Michael Hooper
10/28/2021 Meeting or Teleconference Held Annual meeting held with DOT Northern Region and contractors to discuss previous field season and plans for the next year. Michael Hooper
11/18/2021 Workplan Requested Sent letter requesting site characterization at this site. Michael Hooper
11/18/2021 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 81110 name: Former Injection Well Michael Hooper
1/17/2024 Meeting or Teleconference Held Annual Meeting Held with DOT to discuss plans for coming year at all NR UIC sites. Michael Hooper
8/20/2024 Site Characterization Workplan Approved DOT&PF plans to mobilize to the site to advance and collect soil samples from six soil borings. Three borings will be completed as monitoring wells. Groundwater samples will be collected from the three newly installed wells and one pre-existing well TMW-01, as well as the on-site drinking water well in the south shop building. A vapor intrusion building inventory will also be completed. DEC has no comments on this work plan addendum, this draft document is approved as written. Michael Hooper

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details
Hazard ID Site Name File Number
23589 ADOTPF - TOK Maintenance and Operation Station 130.26.015

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close