| Action Date |
Action |
Description |
DEC Staff |
| 10/6/2014 |
Document, Report, or Work plan Review - other |
Received work plan for the Site Assessment at Soldotna Y Chevron, ADEC UST Facility #518. Site Assessment work plan covers the area that is being prepared for the removal of the fuel piping and former dispensers. |
Carly Jensen |
| 10/8/2014 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
ADEC's Paul Horwath completed a site inspection during UST piping removal and assessment work. Arne Tikka was the qualified environmental professional conducting the UST closure assessment and release investigation sampling. Approximately 10-15 cubic yards of gasoline contaminated soil was placed on asphalt, and under a cover liner, on the property. |
Paul Horwath |
| 2/13/2015 |
Document, Report, or Work plan Review - other |
Site Assessment Report for the Soldotna Y Chevron Former Fuel Dispenser and Fuel Piping Removal completed by Prism Design and Construction was received. Report covered work that was conducted on October 7, 2014. |
Carly Jensen |
| 2/24/2015 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
| 2/24/2015 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST site created in CSP database for source area USTs 6-9, 79738 |
Mitzi Read |
| 3/12/2015 |
Update or Other Action |
Lat/long collected and verified using CS Internal ArcGIS.com web map. Entered into database.
60.485822 -151.058379 |
Paul Horwath |
| 11/1/2015 |
Document, Report, or Work plan Review - other |
An UST Closure Summary Report Soldotna Y Chevron Soldotna, Alaska Facility: # 518 November 2015 was prepared to summarize the planning and actions taken to remove the underground storage tanks and fuel piping. |
Carly Jensen |
| 11/1/2015 |
Document, Report, or Work plan Review - other |
Soil Sampling and Monitoring Well Installation Work Plan for Soldotna Y Chevron Facility was prepared for the assessment of soil below the USTs that once existed at this site and to install several monitoring wells for the ability to explore the potential that groundwater may have been impacted by gasoline and diesel that was released at this site. |
Carly Jensen |
| 1/22/2017 |
Document, Report, or Work plan Review - other |
Completed a review of the UST Closure Summary Report, November, 2015, prepared by Eric Henry, doing business as EHX. Issued a letter to Mark Rozak, expressing ADEC concerns, comments, and questions requiring a formal written response. |
Paul Horwath |
| 8/1/2017 |
Update or Other Action |
Sent an e-mail to owner/operator's consultant, Eric Henry, asking for a status update on finalizing a corrected UST Closure report. |
Paul Horwath |
| 12/14/2017 |
Update or Other Action |
Sent an e-mail to owner/operator's qualified environmental professional/consultant, Eric Henry, asking for a status update on the finalization and submission of a corrected UST Closure report. |
Paul Horwath |
| 1/31/2018 |
Update or Other Action |
No response has been received from Mr. Eric Henry in response to either ADEC's two e-mail communications issued in 2017, soliciting a update/status report.
A certified mail - return receipt letter was issued to Mark Rozak, requiring his written response to ADEC by February 16, 2018, outlining a plan and schedule for preparing and submitting a written response to the issues identified in ADEC's letter dated January 22, 2017. |
Paul Horwath |
| 2/1/2018 |
Update or Other Action |
Send a copy of ADEC's 1/31/2018 letter to Mark Rozak to consultant Eric Henry via e-mail attachment. |
Paul Horwath |
| 2/22/2018 |
Update or Other Action |
ADEC talked with owner Mark Rozak today and agreed to extend the deadline to provide a response to ADEC's 2/22/2017 letter out to 3/22/2018, since Mr. Rozak's consultant (Eric Henry) is currently out of the State of Alaska. |
Paul Horwath |
| 6/5/2018 |
Site Visit |
Review EHX's (Eric Henry's) May 25, 2018 Soil Sampling and MW Installation Workplan. Site visit while Discovery Drilling is drilling onsite, to discuss work plan with Eric Henry. Also met and discussed the project with owner Mark Rozak. |
Paul Horwath |
| 6/7/2018 |
Update or Other Action |
Two MWs installed at site, and multiple soil borings drilled/sampled in the past two days, per telephone message from EHX (Eric Henry). |
Paul Horwath |
| 8/15/2018 |
Update or Other Action |
Telecom with consultant Eric Henry. Mr. Rozak would like to proceed with cleanup excavation work. Discuss public notice process with Mr. Henry. |
Paul Horwath |
| 6/24/2024 |
Workplan Requested |
Request for work plan - June 2024 for assessment and remediation of fuel island release. |
Peter Campbell |