Site Report: Hadley Smelter

Site Name: Hadley Smelter
Address: ~4.5 Mi. E of Kasaan; ~0.5 Mi. SW of Lyman Point; ~14 Mi. SE of Thorne Bay, SE Prince of Wales Island, Thorne Bay, AK 99919
File Number: 1515.38.003
Hazard ID: 26403
Status: Active
Staff: Nick Waldo, 9074655270 nick.waldo@alaska.gov
Latitude: 55.535579
Longitude: -132.285752
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

The Hadley Smelter was constructed in the early 1900s by the Hadley Consolidated Copper Company. The smelter operated from 1905-1908. Nearby mines continued to operate and ore was sent to a smelter in British Columbia, Canada (BC). Fires occurred in 1915 and 1918 and the smelter machinery was moved to BC. In 1965, a private entity purchased part of the site and constructed summer cabins. The rest of the site was transferred to Kavilco under ANCSA. Black slag is present in large mounds in the uplands and to a depth of at least 2-3 feet in the inter-tidal area. Copper and other metals have been confirmed in soil above DEC cleanup levels.

Action Information

Action Date Action Description DEC Staff
5/26/2015 Site Added to Database A new site has been added to the database Mitzi Read
5/26/2015 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 79772 name: Hadley Smelter Mitzi Read
4/20/2017 Site Visit Staff conducted a joint site visit with DNR. Sediment and surface water samples were collected for use in a Preliminary Assessment which will be developed using site discovery funding. Anne Marie Palmieri
6/13/2018 Potentially Responsible Party/State Interest Letter Dept of Law responded to HRG Group and Glencore regarding their PRP statuses about this site. Original PRP letters were sent 7/31/2015. Anne Marie Palmieri
6/28/2018 Workplan Requested On this date, staff sent a letter to HRG Group and Glencore requesting a site characterization work plan within 60 days. Anne Marie Palmieri
1/7/2022 Workplan Requested On this date, staff sent a letter to Glencore requesting a site characterization work plan within 60 days. Nick Waldo

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details

There are no documents for this site report.

No associated sites were found.