Site Report: Fairbanks Natural Gas Tanana Levee Industrial Park

Site Name: Fairbanks Natural Gas Tanana Levee Industrial Park
Address: 2942 Tria Road, Fairbanks, AK 99709
File Number: 100.38.260
Hazard ID: 26420
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 64.803885
Longitude: -147.794000
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

In April 2015 petroleum-stained surface soil was discovered in several locations at the Fairbanks Natural Gas facility on Tracts C and D of the Tanana Levee Industrial Park subdivision. Phase I and limited Phase II environmental site assessments were conducted in May and June, 2015 respectively. Diesel range organics, residual range organics, and arsenic were confirmed present in surface soil above DEC cleanup levels. Limited removal action was planned for the east area vehicle track and the primary vehicle track in 2015.

Action Information

Action Date Action Description DEC Staff
7/28/2015 Site Added to Database A new site has been added to the database Mitzi Read
7/29/2015 Spill Transferred from Prevention Preparedness and Response Program Spill transferred by PERP staff Ashley Adamczak. Spill no. 15309909702; spill date = 4/7/15; substance = unknown; quantity = unknown. Mitzi Read
7/30/2015 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 79790 name: Petroleum-Stained Surface Soil Mitzi Read
8/5/2015 Cleanup Plan Approved DEC approved the "Limtied Removal Action Work Plan" which describes plans to excavate and dispose of stained soil at two locations. Robert Burgess
8/12/2015 Site Visit DEC project manager visited the site to observe excavation and sampling activities. Soil at two locations was excavated to approximately two feet. Field screening and confirmation samples were taken according to procedures described in the workplan. Scattered stains less than two feet in diameter were present in a few locations at the site; some of these had been tested in the Phase II assessment and are below cleanup levels. Any contamination remaining at the site is likely de minimis. Robert Burgess
9/21/2015 Document, Report, or Work plan Review - other Received Limited Removal Action Report from Shannon & Wilson. Approximately 8 cubic yards of soil was removed and 7 samples collected. The samples were analyzed for BTEX, DRO, RRO, and PAHs. No contaminants were present in the excavation limits above ADEC soil cleanup levels. The removed soil was treated at OIT. Janice Wiegers
10/30/2015 Cleanup Complete Determination Issued Final cleanup report indicated that no contamination remains above ADEC cleanup levels at the stained areas noted in the Phase II report. Robert Burgess

Contaminant Information

Name Level Description Media Comments
RRO < Method 2 Most Stringent Soil
Arsenic - Total Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil Concentrations are consistent with background levels for the area, and the contaminant is not attributable to known activities at the site.
DRO < Method 2 Most Stringent Soil

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70)

No associated sites were found.