Action Date |
Action |
Description |
DEC Staff |
1/6/2016 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
1/11/2016 |
Potentially Responsible Party/State Interest Letter |
|
Lisa Krebs-Barsis |
2/12/2016 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79852 name: Wards Cove Packing Former Cannery - Chignik Lagoon |
Lisa Krebs-Barsis |
6/27/2016 |
Document, Report, or Work plan Review - other |
Approved remediation work plan for 2016. |
Darren Mulkey |
8/9/2016 |
Document, Report, or Work plan Review - other |
TPECI submitted an amended remediation work plan for the 2016 Wards Cove Chignik Lagoon Cannery Tank Farm Facility Site. Work plan was approved. |
Darren Mulkey |
1/23/2017 |
Document, Report, or Work plan Review - other |
Reviewed the Wards Cove Packing - Chignik Lagoon Cannery Tank Farm Site Investigation and Remediation Report (TPECI - December 13, 2016). Landfarm baseline sampling at the Upper Landfarm, Lower Landfarm and Landfarm #3 found that surface soils were all below ADEC Method Two cleanup levels for hydrocarbon contaminants. Soil samples collected from excavated/stockpiled soils placed into the landfarms ULF and LLF found DRO and GRO concentrations well above ADEC cleanup levels. Benzene, Toluene, Ethylbenzene and Total Xylene concentrations were also found to be above ADEC Method Two cleanup levels. As the excavation was advanced, the extents of the contamination were not encountered, and contaminant concentrations did not dissipate at greater depths. At a depth of approximately 20 feet below ground surface, continued excavation was no longer safe of feasible with the equipment available onsite. Soil samples collected from excavated/stockpiled soils placed into the landfarm LF3 found DRO and RRO concentrations well above ADEC cleanup levels. Groundwater samples collected from MW1, within the Old Tank Farm excavation area, exceeded the ADEC cleanup levels for DRO GRO, and BTEX. MW2 was located in the drainage ditch, approximately 125 feet (downgradient) from the New Power Plant. While no contaminants were found to exceed ADEC cleanup levels, elevated DRO concentrations were observed in the well. |
Darren Mulkey |
6/12/2017 |
Update or Other Action |
Sent work plan request letter to Doug Brindle of Wards Cove. Due September 12,2017 |
Erin Gleason |
6/22/2017 |
Meeting or Teleconference Held |
Meeting with ADEC, Wards Cove, TPECI. Update on site and insurance issues. updated work plan due date to May 1, 2018. |
Erin Gleason |
4/11/2018 |
Workplan Requested |
Wards Cove has requested an extention for their work plan. New deadline is July 1, 2018. |
Erin Gleason |
7/2/2018 |
Update or Other Action |
ADOL has extended the work plan deadline to 7/31/2018 |
Erin Gleason |
7/31/2018 |
Document, Report, or Work plan Review - other |
Received work plan from TPECI on behalf of Wards Cove for further characterization and cleanup. ADEC will review and respond. |
Erin Gleason |
9/6/2018 |
Document, Report, or Work plan Review - other |
ADEC received a work plan from TPECI on behalf of Wards Cove for further characterization and cleanup on 7/31/2018. ADEC has review the work plan and requests revisions by 10/5/2018. In addition, ADEC would like to meet with TPECI and Wards Cove prior to 10/5/2018 to discuss the proposed alternate cleanup levels. |
Erin Gleason |
9/10/2018 |
Update or Other Action |
ADEC received the Landfarm Work Plan from TPECI on 7/31/2018 on behalf of Wards Cove. TPECI proposes to till all three landfarms on a weekly basis until soil is below ADEC cleanup levels. ADEC has reviewed the plan and requests some additional details on 8/23/2018. The revised work plan was due and received by ADEC on 9/6/2018. ADEC has reviewed the work plan and it is now approved. |
Erin Gleason |
9/14/2018 |
Update or Other Action |
Deadline extended to 11/2/2018 per TPECI request for the characterization work plan. |
Erin Gleason |
9/24/2018 |
Potentially Responsible Party/State Interest Letter |
PRP Letter sent to Top Notching Holdings LLC today. |
Erin Gleason |
10/30/2018 |
Meeting or Teleconference Held |
ADEC and TPECI had phone discussion today to review the ADEC comments from 9/5/2018 on the characterization work plan. TPECI will address the comments listed and resubmit the work plan. Cleanup levels for the site are not proposed at this time. The site will be characterized to method 2 and an appropriate cleanup level will be selected after the characterization in 2019. |
Erin Gleason |
1/2/2019 |
Update or Other Action |
TPECI revised draft of the work plan to insurance company they will take 4- 6 week from today to review. TPECI will submit revised draft of the work plan once they get approval from the insurance company. |
Erin Gleason |
4/10/2019 |
Site Characterization Workplan Approved |
ADEC received revised work plan from TPECI on behalf of wards cove. ADEC has reviewed the work plan and it is now approved. |
Erin Gleason |
6/28/2021 |
Update or Other Action |
ADEC sent letter to ward cove on this date requesting they schedule and perform work in summer 2021. A report of findings should be submitted to ADEC upon completion of work. |
Erin Gleason |
7/9/2021 |
Update or Other Action |
Work is scheduled for summer 2022 |
Erin Gleason |
2/3/2023 |
Update or Other Action |
Letter sent on this date to Wards Cove Packing Company to implement the approved "Revised Site Characterization Work Plan" dated April 10, 2019. |
Naomi Mason |