Site Report: Marine View Center
Site Name: | Marine View Center |
---|---|
Address: | 230 South Franklin Street, Juneau, AK 99801 |
File Number: | 1513.26.078 |
Hazard ID: | 26521 |
Status: | Cleanup Complete - Institutional Controls |
Staff: | IC Unit, 9074655229 dec.icunit@alaska.gov |
Latitude: | 58.299391 |
Longitude: | -134.404708 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Two underground storage tanks located in close proximity to one another were addressed during the site work in March 2015: a 675-gallon tank was removed and a 15,000-gallon tank was closed in-place. There is petroleum contamination in soil that was left in place due to a small work area/building foundation.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
2/16/2016 | Site Added to Database | A new site has been added to the database | Nathan Maxwell |
2/16/2016 | Leaking Underground Storage Tank Release Confirmed - Petroleum | LUST site created in CSP database for source area Two USTs, 79880 | Nathan Maxwell |
2/19/2016 | Update or Other Action | Requested a work plan to investigate the potential for vapor intrusion due to contaminated soil left in place after UST removal. | Danielle Duncan |
2/19/2016 | Potentially Responsible Party/State Interest Letter | Sent PRP letter this date. | Danielle Duncan |
2/19/2016 | Exposure Tracking Model Ranking | Initial ranking with ETM completed for source area id: 79880 name: Two USTs (3593) | Danielle Duncan |
2/23/2016 | Update or Other Action | Spoke to the RP and he is planning on providing me more information regarding the potential for vapor intrusion: drawings of the building including the distances between structures, foundation type, and vapor barrier presence/absence and type/maintenance. | Danielle Duncan |
3/31/2016 | Update or Other Action | Spoke to the RP today and he has hired an engineer to do some air pressure testing and Nortech is writing a report. | Danielle Duncan |
4/19/2016 | Document, Report, or Work plan Review - other | Rec'd Vapor Intrusion letter report this date. | Danielle Duncan |
7/12/2016 | Site Characterization Report Approved | Approved the Vapor Intrusion letter report this date. The letter report states that the concrete and steel building is equipped with a roof mounted air handling unit. There is no vapor barrier in place at this time however the ADEC recommends that one be retrofitted if possible to further reduce the potential for vapor intrusion into the building. The report states that there is positive air pressure on the first floor of the building which reduces the risk of vapor intrusion into the interior living spaces. In addition, the first four (4) floors of the building closest to the petroleum contaminated soil are presumably occupied during business hours only and no reports of odor or air quality issues have been reported. Due to the non-residential use of the floors closest to the contaminated soil, the positive air pressure in the building, and the presence of an air handling unit, ADEC believes that the potential for vapor intrusion into the Marine View Building is likely to be low. | Danielle Duncan |
8/1/2016 | Leaking Underground Storage Tank Cleanup Initiated - Petroleum | Administrative action addition for grant reporting purposes. | Evonne Reese |
8/15/2016 | Exposure Tracking Model Ranking | A new updated ranking with ETM has been completed for source area 79880 Two USTs (3593). | Danielle Duncan |
8/29/2016 | Institutional Control Record Established | Institutional Controls established and entered into the database. | Danielle Duncan |
8/29/2016 | Cleanup Complete Determination Issued | Danielle Duncan | |
9/8/2016 | Institutional Control Compliance Review | IC compliance review conducted. Staff changed from Danielle Duncan to IC Unit. There is a deed notice recorded for this site. Reminder system set to follow-up every five years. | Kristin Thompson |
9/24/2024 | Institutional Control Compliance Review | IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in five years’ time. | Gaige Robinson |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil | Remaining DRO beneath the concrete slab between the buildings has a concentration of 12,000 mg/kg. |
1-Methylnaphthalene | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil | Remaining 1-methylnapthalene in subsurface soil beneath the concrete slab is 11.2 mg/kg. |
Control Type
Type | Details |
---|---|
Notice of Environmental Contamination |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. | |
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) | |
Excavation / Soil Movement Restrictions | |
Groundwater Use Restrictions | DEC shall be notified before any new groundwater wells are drilled at this site. |
No associated sites were found.