Skip to content Skip to content

Site Report: Marine View Center

Site Name: Marine View Center
Address: 230 South Franklin Street, Juneau, AK 99801
File Number: 1513.26.078
Hazard ID: 26521
Status: Cleanup Complete - Institutional Controls
Staff: IC Unit, 9074655229 dec.icunit@alaska.gov
Latitude: 58.299391
Longitude: -134.404708
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Two underground storage tanks located in close proximity to one another were addressed during the site work in March 2015: a 675-gallon tank was removed and a 15,000-gallon tank was closed in-place. There is petroleum contamination in soil that was left in place due to a small work area/building foundation.

Action Information

Action Date Action Description DEC Staff
2/16/2016 Site Added to Database A new site has been added to the database Nathan Maxwell
2/16/2016 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST site created in CSP database for source area Two USTs, 79880 Nathan Maxwell
2/19/2016 Update or Other Action Requested a work plan to investigate the potential for vapor intrusion due to contaminated soil left in place after UST removal. Danielle Duncan
2/19/2016 Potentially Responsible Party/State Interest Letter Sent PRP letter this date. Danielle Duncan
2/19/2016 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 79880 name: Two USTs (3593) Danielle Duncan
2/23/2016 Update or Other Action Spoke to the RP and he is planning on providing me more information regarding the potential for vapor intrusion: drawings of the building including the distances between structures, foundation type, and vapor barrier presence/absence and type/maintenance. Danielle Duncan
3/31/2016 Update or Other Action Spoke to the RP today and he has hired an engineer to do some air pressure testing and Nortech is writing a report. Danielle Duncan
4/19/2016 Document, Report, or Work plan Review - other Rec'd Vapor Intrusion letter report this date. Danielle Duncan
7/12/2016 Site Characterization Report Approved Approved the Vapor Intrusion letter report this date. The letter report states that the concrete and steel building is equipped with a roof mounted air handling unit. There is no vapor barrier in place at this time however the ADEC recommends that one be retrofitted if possible to further reduce the potential for vapor intrusion into the building. The report states that there is positive air pressure on the first floor of the building which reduces the risk of vapor intrusion into the interior living spaces. In addition, the first four (4) floors of the building closest to the petroleum contaminated soil are presumably occupied during business hours only and no reports of odor or air quality issues have been reported. Due to the non-residential use of the floors closest to the contaminated soil, the positive air pressure in the building, and the presence of an air handling unit, ADEC believes that the potential for vapor intrusion into the Marine View Building is likely to be low. Danielle Duncan
8/1/2016 Leaking Underground Storage Tank Cleanup Initiated - Petroleum Administrative action addition for grant reporting purposes. Evonne Reese
8/15/2016 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 79880 Two USTs (3593). Danielle Duncan
8/29/2016 Institutional Control Record Established Institutional Controls established and entered into the database. Danielle Duncan
8/29/2016 Cleanup Complete Determination Issued Danielle Duncan
9/8/2016 Institutional Control Compliance Review IC compliance review conducted. Staff changed from Danielle Duncan to IC Unit. There is a deed notice recorded for this site. Reminder system set to follow-up every five years. Kristin Thompson
9/24/2024 Institutional Control Compliance Review IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in five years’ time. Gaige Robinson

Contaminant Information

Name Level Description Media Comments
DRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil Remaining DRO beneath the concrete slab between the buildings has a concentration of 12,000 mg/kg.
1-Methylnaphthalene Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil Remaining 1-methylnapthalene in subsurface soil beneath the concrete slab is 11.2 mg/kg.

Control Type

Type Details
Notice of Environmental Contamination

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70)
Excavation / Soil Movement Restrictions
Groundwater Use Restrictions DEC shall be notified before any new groundwater wells are drilled at this site.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close