Site Report: Eielson AFB Bldg 2205
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Low pressure in the heating system of building 2205 and Eielson Air Force Base was first identified on 5/2/17. After testing and investigation a leaking pipe was found in the closet wall of dormitory room 111. It was determined that approximately 300 gallons of a 60% ethylene glycol and 40% water solution had soaked into the drywall, insulation, and carpet, and had migrated down a construction joint in the cement floor and is now beneath the building. The piping was repaired and contaminated building materials were drummed and sent to the Eielson Air Force Base hazardous waste facility.
Action Information
Contaminant Information
Name |
Level Description |
Media |
Comments |
Control Type
Requirements
There are no documents for this site report.
No associated sites were found.