Action Date |
Action |
Description |
DEC Staff |
4/22/2005 |
Update or Other Action |
Sent a Notice of Release letter to the owners requesting a Release Investigation. |
Deborah Williams |
10/6/2014 |
Update or Other Action |
Sent a letter to the RP asking for clarification of waste oil tank and UIC identified during 1989 EPA inspection. |
Jim Fish |
10/14/2014 |
Update or Other Action |
Received a phone from RP in response to 10/6 letter - indicated that there was no waste oil tank. Suggested he contact EPA UIC Program and clarify. |
Jim Fish |
4/10/2015 |
Update or Other Action |
Requested RP contact EPA Region 10 UIC Program to follow-up with suspected waste oil tank and UIC identified during 1989 EPA inspection. |
Jim Fish |
4/17/2015 |
Update or Other Action |
Letter from UST Program sent to RP requiring closure of Oil/water separator UST, that stored used oil, by August 30, 2015. |
Jim Fish |
7/24/2015 |
Update or Other Action |
Received UST and UIC closure work plan from consultant. |
Jim Fish |
8/17/2015 |
Document, Report, or Work plan Review - other |
Received amended work plan for UST and UIC closure. |
Jim Fish |
8/18/2015 |
Meeting or Teleconference Held |
Teleconference with consultant held to clarify approach to UIC assessment and adherence to UST regulations. |
Jim Fish |
8/21/2015 |
Update or Other Action |
Received second revised UST & UIC Closure work plan. |
Jim Fish |
8/24/2015 |
Update or Other Action |
Received USEPA UIC Program approval of UIC closure plan. |
Jim Fish |
8/25/2015 |
Site Characterization Workplan Approved |
Conditionally approved revised UST and UIC closure work plan, submitted 21 August, 2015. |
Jim Fish |
12/10/2015 |
Document, Report, or Work plan Review - other |
Received UST and UIC Site Assessment Closure Report from consultant. PCE above cleanup levels found at the soil-groundwater interface beneath the UST and UST piping, as well as in the soils of soil adsorption system (leach field). PCE was also detected in groundwater (below cleanup levels) beneath the soil adsorption system. Additional Release Investigation recommended by consultant. |
Jim Fish |
3/31/2016 |
Update or Other Action |
Sent a letter to the RP requesting additional site investigation of soil and groundwater contamination at the SAS, under the former OWS, and under the building; and to determine if contaminated groundwater is moving off-site. Requested 4-inch roof drain pipe currently plumbed to former SAS be rerouted to avoid spreading remaining soil contamination; Requested remediation or removal of contaminated soil if they pose a risk to building occupants; Also advised coordination with EPA Region 10 UIC Program for reclassification or closure of the MVWDW. |
Jim Fish |
3/31/2016 |
Update or Other Action |
Received a copy of Class V Injection Well Closure/Reclassification recommendation letter to RP, from USEPA Region 10. |
Jim Fish |
9/27/2016 |
Document, Report, or Work plan Review - other |
Received work plan for release investigation at the former used oil UST and UIC soil absorption system; groundwater sampling & monitoring, as well as sub-soil gas collection beneath the WWM building. |
Jim Fish |
11/18/2016 |
Site Characterization Workplan Approved |
Revised work plan for release investigation, with soil sampling, groundwater sampling (involving both temporary and permanent monitoring wells), and sub-slab soil gas sampling, approved. |
Jim Fish |
12/13/2016 |
Update or Other Action |
Reviewed and approved request to decommission soil stockpile from October 2015 UST excavation activities, and concurred with the determination that excavated soils did not contain listed of characteristic hazardous waste. Soils approved for reuse on the site as fill material. |
Jim Fish |
2/24/2017 |
Update or Other Action |
Sent work plan for groundwater evaluation and sub-slab sampling to Region 10 EPA UIC Program. |
Jim Fish |
4/5/2017 |
Update or Other Action |
Received release Investigation Letter report from consultant. |
Jim Fish |
4/14/2017 |
Meeting or Teleconference Held |
Discussed Release Investigation report and changed groundwater cleanup levels with RP and consultant, and agreed on evaluating vapor intrusion potential in building, and investigating groundwater for contaminants found in sub-slab soil gas. |
Jim Fish |
6/1/2017 |
Update or Other Action |
Received updated/revised work plan addendum for indoor air sampling and groundwater sampling from former oil/water separator. |
Jim Fish |
6/8/2017 |
Document, Report, or Work plan Review - other |
Addendum to Release Investigation Work Plan approved. Indoor air sampling in office space will be conducted, and if contaminants are identified in groundwater from beneath the oil-water separator in excess of their ADEC cleanup levels, the extent and magnitude of the contamination will be determined. |
Jim Fish |
9/1/2017 |
Update or Other Action |
Consultant indicated successful attempt to sample groundwater beneath oil-water separator pit, as planned. |
Jim Fish |
3/16/2018 |
Document, Report, or Work plan Review - other |
2017 Release investigation report received, documenting last year’s groundwater and indoor-air sampling and oil/water separator closure activities at the site. |
Jim Fish |
5/14/2018 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 80227 name: UIC & Soil Adsorption System |
Jim Fish |
5/14/2018 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 80227 UIC & Soil Adsorption System . |
Jim Fish |
5/14/2018 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 80228 name: OWS |
Jim Fish |
5/14/2018 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 80228 OWS. |
Jim Fish |
5/6/2019 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
5/30/2019 |
Workplan Requested |
DEC requested a site characterization work plan by the deadline of July 15, 2019. |
Megan Roberts |
6/25/2019 |
Meeting or Teleconference Held |
World Wide Movers staff, their environmental consultants, and DEC staff met to discuss the development of a site characterization work plan. Discussions centered around what site characterization activities are needed to move the site towards closure. DEC indicated additional air and groundwater sampling is needed. |
Megan Roberts |
10/3/2019 |
Site Characterization Workplan Approved |
Proposal and 2019 Work Plan Addendum for Site Characterization approved on this date. Plan includes sampling at two temporary well points along the property boundary downgradient of the former SAS and OWS and collecting three indoor air samples--one in the office area and two in the warehouse. |
Rebekah Reams |
12/17/2019 |
Update or Other Action |
World Wide Movers 2019 Site Characterization Summary Report submitted by Shannon & Wilson. |
Rebekah Reams |
1/28/2020 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 80227 UIC & Soil Adsorption System . |
Rebekah Reams |
1/28/2020 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 80228 OWS. |
Rebekah Reams |
2/27/2020 |
Document, Report, or Work plan Review - other |
DEC provided comments on the Summary Report for World Wide Movers 2019 Site Characterization. |
Rebekah Reams |
3/3/2020 |
Update or Other Action |
DEC requested work plan for decommissioning of MW-1 |
Rebekah Reams |
6/11/2020 |
Document, Report, or Work plan Review - other |
Well decommissioning work plan was approved by ADEC on March 13, 2020 and well decommissioning is scheduled for July 8, 2020. |
Rebekah Reams |
6/11/2020 |
Cleanup Complete Determination Issued |
|
Rebekah Reams |