| Action Date |
Action |
Description |
DEC Staff |
| 12/19/2019 |
Spill Transferred from Prevention Preparedness and Response Program |
Spill transferred by Prevention, Preparedness, and Response Program (PPRP) staff Mark Sielaff. Spill no. 19279919601; spill date = 7/15/19; substance = unknown petroleum; quantity = unknown. |
Mitzi Read |
| 1/31/2020 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
| 4/2/2020 |
Potentially Responsible Party/State Interest Letter |
Sent Potentially Responsible Party (PRP) letter to Alaska Department of Commerce, Community and Economic Development (ADCCED). |
Erin Gleason |
| 4/2/2020 |
Potentially Responsible Party/State Interest Letter |
Sent PRP letter to City of Saint Marys. |
Erin Gleason |
| 4/6/2020 |
Potentially Responsible Party/State Interest Letter |
Sent PRP letter to Catholic Bishops of Northern Alaska. |
Erin Gleason |
| 4/13/2020 |
Workplan Requested |
Work plan request letter sent to the City of Saint Mary's, Catholic Bishop of Northern Alaska (CBNA), and Alaska Department of Commerce, Community, and Economic Development (DCCED). |
Erin Gleason |
| 5/28/2020 |
Update or Other Action |
ADEC receives response from legal counsel for the Catholic Bishop of Northern Alaska (CBNA). They acknowledge receiving the ADEC letter and will work with other responsible parties to achieve the work plan. |
Erin Gleason |
| 7/17/2020 |
Update or Other Action |
On July 16th, 2020 the Alaska Village Electric Cooperative (AVEC) contractor discovered pockets of petroleum contamination along the southwest border of the new tank farm site. The contamination had a diesel odor and was located within the top two feet of soil. The soil was excavated and stockpiled near the 2019 material, but kept separate with a liner. |
Erin Gleason |
| 7/21/2020 |
Update or Other Action |
On July 18th and 19th, 2020 AVEC discovered sheen on surface and groundwater in a trench while working on their tank farm and power plant upgrade project. The contamianted water was pumped from the trench, treated, and discharged to the ground surface. On July 20th, 2020 the AVEC contractors excavated and stockpiled 267 cubic yards of soil that exhibited petroleum odors. The soil was stockpiled and secured with the soil from 2019. |
Erin Gleason |
| 7/22/2020 |
Update or Other Action |
Received letter for Catholic Bishop of North Alaska with information regarding other PRPs for the site based on a records review of their leases, easements, and deeds for the property. |
Erin Gleason |
| 7/31/2020 |
Potentially Responsible Party/State Interest Letter |
PRP letter sent to Alaska Village Electric Cooperative on this date. |
Erin Gleason |
| 7/31/2020 |
Workplan Requested |
ADEC sent a letter on this date to all responsible parties requesting a work plan to address the 3,930 cyd of soil from 2019 and the 267 cyd of soil from 2020 that is stockpiled off site. The work plan is due by August 31, 2020. Because the area is an active contaminated site, any additional work such as construction of buildings or excavation of soil will require an ADEC approved work plan in place prior to any work. |
Erin Gleason |
| 8/10/2020 |
Meeting or Teleconference Held |
Meeting with ADEC and AVEC to discuss PRP status and next steps on this date. |
Erin Gleason |
| 8/11/2020 |
Update or Other Action |
267 cubic yards of contaminated material was excavated from the southwest corner of the new tank farm site (see map) and added to the #2 stockpile from 2019. |
Erin Gleason |
| 8/28/2020 |
Update or Other Action |
Deadline for work plan was extended to January 30th, 2021 per request of AVEC. |
Erin Gleason |
| 9/11/2020 |
Update or Other Action |
Received data on 9/2 for the 267 cyd of soil that was excavated from the new tank farm area and placed into the stockpile #2 to the 2019 excavation. The material from 2020 exceeds migration to groundwater cleanup levels for diesel range organics (DRO), naphthalene, and xylenes. |
Erin Gleason |
| 9/11/2020 |
Update or Other Action |
400 cubic yards of potentially contaminated soil was taken from the southwest corner of the new tank farm site and put in the City of Saint Mary's gravel pit. Three analytical samples were collected and they are awaiting results. Analytical data received on 9/2 shows all COC below cleanup levels. |
Erin Gleason |
| 9/23/2020 |
Meeting or Teleconference Held |
PRP meeting held via teleconference on this date. AVEC, ADEC, CBNA, and City of Saint Mary were present. DCCED was unable to attend. ADEC highlighted the need for a work plan to be in place by next spring so work may be conducted in summer 2021. PRP group agrees to work together on work plan. They will meet and report back to ADEC on plans. |
Erin Gleason |
| 11/17/2020 |
Potentially Responsible Party/State Interest Letter |
The Alaska Department of Environmental Conservation (ADEC) contaminated sites program has reviewed the deed regarding Alaska Department of Commerce, Community, & Economic Development (ADCCED) ownership of Tract A of United States Survey 2984 in Saint Mary’s, Alaska. In accordance with Alaska Statute 46.03.822 (k), ADEC no longer views ADCCED as a potential responsible party (PRP) for this property at this time because it was acquired by ADCCED by default. |
Erin Gleason |
| 1/7/2021 |
Document, Report, or Work plan Review - other |
ADEC received report from AVEC on 12/9/2020 for the characterization and excavation of diesel contaminated soil at the Saint Mary's tank farm and former fuel storage. ADEC has reviewed the report and requests revisions. Letter sent to AVEC. |
Erin Gleason |
| 2/18/2021 |
Document, Report, or Work plan Review - other |
Received revised report from AVEC on 1/20/21. ADEC has reviewed report and requests additional information. Letter sent to AVEC on this date. |
Erin Gleason |
| 2/19/2021 |
Workplan Requested |
Sent data gap analysis letter to responsible parties on this date. Complete characterization of soil and water contamination needs to be determined in the horizontal and vertical direction before site can be considered for closure. |
Erin Gleason |
| 3/17/2021 |
Site Characterization Report Approved |
Received revised report from AVEC on 3/1/21. ADEC has reviewed the report and it is now approved. Soil from “clean stockpile” will need to be tested for PAH before it can be disposed of. Letter sent to AVEC on 3/17/21. |
Erin Gleason |
| 3/23/2021 |
Document, Report, or Work plan Review - other |
Received work plan from AVEC on behalf of all responsible parties on 2/16/21. ADEC will reviewed the work plan and requests changes. Letter sent on this date with comment tracking matrix. |
Erin Gleason |
| 10/27/2021 |
Update or Other Action |
Received letter from legal counsel for City of Saint Mary's requesting that ADEC notice other potentially responsible parties. ADEC will consult with Alaska Department of Law (ADOL) and respond. |
Erin Gleason |
| 2/7/2022 |
Potentially Responsible Party/State Interest Letter |
Potentially Responsible Party Letters sent to Standard Oil Company of California (with Information Request) and the Department of Defense, Department of the Army. |
Naomi Mason |
| 2/10/2022 |
Update or Other Action |
Letter sent to Alaska Village Electric Cooperative (AVEC) to address data gap concerns, stockpiles, and the proposed landfarm location. |
Naomi Mason |
| 2/16/2022 |
Meeting or Teleconference Held |
Meeting with representatives from the City of Saint Mary's, AVEC, and CBNA via teleconference to discuss next steps for the Former Fuel Storage site. Travis/Peterson (TPECI, representing AVEC) is working to revise work plan for stockpiles and landfarm. |
Naomi Mason |
| 2/17/2022 |
Document, Report, or Work plan Review - other |
Received work plan from DNA Environmental (DNA) on behalf of CBNA and the City of Saint Mary's on 12/29/2021. ADEC reviewed the work plan and requests changes. Letter sent on this date to DNA with comment tracking matrix. |
Naomi Mason |
| 3/7/2022 |
Potentially Responsible Party/State Interest Letter |
Potential Responsible Party letter sent to the Society of Jesus (the Jesuits) on this date. |
Naomi Mason |
| 8/17/2022 |
Update or Other Action |
Received a response to comments from CBNA (DNA) on 8/12/2022. ADEC responded on this date. DNA is scheduled to be on-site by 9/19/2022 to conduct soil borings and groundwater monitoring wells. A work plan has not yet been approved by ADEC. |
Naomi Mason |
| 10/5/2022 |
Update or Other Action |
Site characterization is postponed until 2023. |
Naomi Mason |
| 12/3/2022 |
Meeting or Teleconference Held |
CSP meeting with DNR on this date to discuss Saint Mary's landfarm location. CSP reiterated that DEC supports this activity if it can be done in compliance with the relevant statutes and regulations. |
Naomi Mason |
| 12/15/2022 |
Site Characterization Workplan Approved |
DNA Environmental (DNA) submitted a revised work plan on behalf of the Catholic Bishop of Northern Alaska (CBNA) on December 8, 2022. The work plan is now approved. Site characterization work including soil borings, OIP, and construction of long-term monitoring wells with soil and groundwater sampling, is set to occur in summer/fall 2023. |
Naomi Mason |
| 3/17/2023 |
Site Characterization Workplan Approved |
On 3/15/2023, the DNR OHA sent a letter to all responsible parties and ADEC stating that they concur with the finding of No Historic Properties Adversely Affected. A minimum distance of 50 meters must be maintained from the known cemetery, after the soil has been remediated, the slope must be restored and native grasses must be reseeded. On this date, ADEC sent a work plan approval letter to AVEC and all other responsible parties to proceed with landfarm construction in accordance with all local, state, and federal regulations. |
Naomi Mason |
| 12/23/2024 |
Document, Report, or Work plan Review - other |
Received 2023 Site Characterization Report for review. |
Jennifer McGrath |
| 2/28/2025 |
Document, Report, or Work plan Review - other |
Sent Site Characterization Report comments to RP. |
Jennifer McGrath |
| 5/21/2025 |
Meeting or Teleconference Held |
Meeting with RP (CBNA), Consultant (DNA Environmental), and RP's lawyer to discuss comments made on 2024 Site Assessment Report, data gaps, the need for analytical samples, and steps needed to move forward. DEC agreed to review comments sent and send revised version. |
Jennifer McGrath |
| 6/4/2025 |
Document, Report, or Work plan Review - other |
Sent revised comments to RP (CBNA) and consultant (DNA Environmental). |
Jennifer McGrath |