| Action Date |
Action |
Description |
DEC Staff |
| 4/7/1990 |
Update or Other Action |
Phase II HTRW report completed by Ecology and Environment. A soil sample was collected from the HF stained soil area. Lab results did not indicate contaminants at elevated levels. |
John Halverson |
| 2/3/1992 |
Update or Other Action |
OHM submitted a removal action report to the Corps documenting cleanup of drums, transformers, batteries, other containers of waste and some soil from the Wildwood sites. Three transformers were removed from the HF facility. Wipe samples from inside them did not contain elevated PCBs. Surface soil was removed from a small area (35 square feet) to a depth of six inches, from the stained area at the HF transformer site. No confirmation samples were collected from the limits of excavation. |
John Halverson |
| 1/25/1995 |
Site Characterization Report Approved |
E&E submitted the Phase III Remedial Investigation Report - Cleanup Design. Groundwater monitoring probes were installed at the HF facility to determine whether the removal action was sufficient to address this area. Groundwater samples did not contain contaminants above drinking water standards. No further investigation or cleanup was proposed for this area. |
John Halverson |
| 7/20/1996 |
Update or Other Action |
ADEC received a draft record of decision for the Wildwood Air Force Station FUDS. It recommended no further action for the HF facility following completion of a removal action to address some residual petroleum contaminated soil. ADEC concurred with this portion of the ROD, however, there were several issues on other source areas that were not resolved between ADEC and the Corps. The ROD has not been finalized. |
John Halverson |
| 11/22/1996 |
Interim Removal Action Approved |
HLA/Wilder submitted a Remedial Action Report for removal actions done during the summer of 1996. An additional 5 cubic yards of soil from the former transformer pad area were excavated and shipped off-site for thermal treatment. Confirmation samples from the base of the excavation contained up to 4,500 mg/kg DRO. |
John Halverson |
| 11/10/1999 |
Site Added to Database |
DRO contamination. |
John Halverson |
| 2/5/2003 |
Update or Other Action |
Project Manager changed to Caillouet. |
Debra Caillouet |
| 2/3/2005 |
Update or Other Action |
File number issued 2320.38.051 |
Aggie Blandford |
| 6/2/2005 |
Site Characterization Workplan Approved |
A work plan for Site Characterization and Attenuation Monitoring was approved with minor comments. The work plan describes the planned investigation to delineate further the locations of remaining NAPL at the various source areas within the former Wildwood AFS using the Rapid Optical Screening Tool (ROST), Laser-Induced Fluorescence (LIF). It includes sampling and analysis to calibrate the results of the ROST LIF work and to further characterize contaminant nature and obtain data with which to evaluate the status of each source area using current Method II and III tools, and possibly a 4-phase partitioning model. Sampling and analysis will also obtain data with which to evaluate natural attenuation occurrence at each source area. |
Debra Caillouet |
| 6/21/2005 |
Meeting or Teleconference Held |
Staff visited all of the Wildwood sites with the new project manager and the environmental engineer for the site. Staff also observed the ROST/LIF in operation. |
Debra Caillouet |
| 6/15/2007 |
Update or Other Action |
The Declaration of Project Closure Decison for the CON/HTRW project at Wildwood was signed. |
Debra Caillouet |
| 9/5/2007 |
Update or Other Action |
Staff reviewed and prepared comment on No DOD Action Indicated Report, Wildwood AFS, F10AK0251 HTRW Project 03, Draft July 07
The report summarizes the actions and data for twelve areas of concern at the former Wildwood Air Force station that are located at the High Frequency Facility, ACS MARS facility, Operations Building Facility, Rifle Range, Firing Range, Main Complex, and the Main Drum Storage Area.
Comments on the draft document are being provided on the attached table. In general, DEC agrees with the conclusions to close these sites after the appropriate public comment period with the exception of the High Frequency Facility where the data supports a Conditional Closure.
|
Debra Caillouet |
| 9/5/2007 |
Site Characterization Report Approved |
The ROST/LIF Investigation, Former Wildwood Air Force Station, Revision 1, April 2007 Report was reviewed and approved. The report presents the results of the investigation at multiple areas within the former Wildwood AFS during the summer of 2005. The logs from the ROST/LIF are presented along with laboratory analysis results. The report provides valuable site characterization data to support future decisions and generally meets the requirements of 18 AAC 75.335 Site Characterization.
|
Debra Caillouet |
| 3/7/2008 |
Meeting or Teleconference Held |
Staff met with the USACE project manager and engineer to discuss comments on the draft proposed plan and incorporate them into the document. |
Debra Caillouet |
| 9/12/2008 |
Record of Decision |
ROD was signed by John Halverson |
Debra Caillouet |
| 9/12/2008 |
Cleanup Complete Determination Issued |
This alternative is the selected remedy because this
site has a small amount of remaining contaminated
soil at the former transformer pad location that may
exceed the most stringent ADEC Method Two
cleanup levels, but there are no completed exposure
pathways and therefore this soil presents no unreasonable
risk under the present land use. Although
the remaining soil does not present an excess risk at
its current location, the soil should not be excavated
and moved to a different location where it could
potentially pose an unacceptable risk, such as a wetland
or other sensitive environment. For this reason,
the site does not warrant an “unrestricted” status. |
Debra Caillouet |
| 9/12/2008 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Debra Caillouet |
| 7/31/2009 |
Document, Report, or Work plan Review - other |
Staff provided comment to the Kenaitze Indian Tribe for sampling at the site after removal of the building, tank bottom and containment area. |
Debra Caillouet |
| 8/5/2009 |
Cleanup Plan Approved |
Staff approved the Kenaitze Indian Tribe work plan under NALEMP to remove the tank containment area, concrete building and pad, and the 1/2 tank bottom. Sampling will be performed at each location to determine if there is any contamination remaining above cleanup levels. |
Debra Caillouet |
| 7/18/2011 |
Site Characterization Workplan Approved |
Work Plan for Focused Characterization, Former High Frequency (HF) Facility, Wildwood Air Force Station, June 17, 2011 Draft
DEC has no objection to the implementation of this work. Please provide a report of the results of the investigation,
|
Debra Caillouet |
| 9/28/2011 |
Site Characterization Report Approved |
Focused Characterization Report, Former High Frequency (HF) Facility, Wildwood Air Force Station, September 21, 2011 |
Debra Caillouet |
| 6/15/2012 |
Document, Report, or Work plan Review - other |
Soil Removal and Confirmation Sampling Plan, Former High Frequency (HF) Facility & Operations Building Site, Wildwood Air Force Station, June 13, 2012 |
Debra Caillouet |
| 7/25/2012 |
Document, Report, or Work plan Review - other |
Soil Removal and Confirmation Sampling Plan, Former High Frequency (HF) Facility & Operations Building Site, Wildwood Air Force Station, July 25, 2012 |
Debra Caillouet |
| 1/24/2013 |
Final Cleanup Report Reviewed |
Soil Removal and Confirmation Sampling Report, Former High Frequency (HF) Wildwood Air Force Station, January 23, 2013
The report documents the removal of DRO contaminated soil to below the most stringent cleanup level of 250 mg/kg and the proper disposal of the contaminated soil. ADEC has no comment on the report.
A Cleanup Complete decision can be granted once the monitoring wells on site have been properly decommissioned. The report states that a drill rig will be required to decommission the wells. ADEC suggests you review the November 2011 Monitoring Well Guidance and determine if one of the other methods could be used.
|
Debra Caillouet |
| 12/20/2013 |
CERCLA ROD Periodic Review |
Five-Year Review Report, First Five-Year Review Report for Wildwood Air Force Station, FUDS Property No. F10AK0251, HTRW Project 03 Kenai, Alaska, November 2013
The Five Year Review documents the remedies are in place and protective. |
Debra Caillouet |
| 6/13/2014 |
Institutional Control Record Removed |
All soil has been removed above 250 mg/kg DRO and all monitoring wells have been decommissioned. |
Debra Caillouet |