Site Report: City of Cordova New Office Building
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
During excavation for construction of a new building in Cordova, on property owned by the City of Cordova, the contractor found a red-colored paint-like material with a paint thinner odor mixed with soils at the western edge of the site. The red paint and thinner mix was found to have leaked from a drum stored inside a container van at the site. An estimated 17 gallons spilled into soils. Soils were analyzed, found not be hazardous waste, and 70 cubic yards were excavated and thermally treated at an approved facility in Cordova (Soil Processing, Inc.) with Department approval.
Action Information
Contaminant Information
| Name |
Level Description |
Media |
Comments |
|
|
|
For more information about this site, contact DEC at (907) 465-5390. |
Control Type
| Type |
Details |
| No ICs Required |
|
Requirements
| Description |
Details |
| Advance approval required to transport soil or groundwater off-site. |
|
There are no documents for this site report.
No associated sites were found.