Site Report: Pillar Mountain RRS OT01
| Site Name: | Pillar Mountain RRS OT01 |
|---|---|
| Address: | Kodiak Island, Kodiak, AK 99615 |
| File Number: | 2601.38.103 |
| Hazard ID: | 2843 |
| Status: | Cleanup Complete - Institutional Controls |
| Staff: | Juliana Smit, 9072693064 juliana.smit@alaska.gov |
| Latitude: | 57.788001 |
| Longitude: | -152.439080 |
| Horizontal Datum: | WGS84 |
| ![]() |
![]() | ![]() |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
The Pillar Mountain Radio Relay Station is a former White Alice Communications Site. The site is located on Kodiak Island approximately 1 mile west of the city of Kodiak; the city and St Paul Harbor lie at the base of the mountain to the south and southeast. Pillar Creek and Pillar Creek Reservoir are located north of the site. Clean Sweep occurred in 1997 and included removal and closure of 4 ASTs and 1 UST, the assessment and removal of PCB-contaminated soil, and assessment and decontamination of PCB-contaminated concrete floor surfaces. Some PCBs and DRO above cleanup levels remain in the fractured bedrock; these areas are covered by at least 18 inches of soil cap and are to be recorded within state land records and the Air Force Base Master Plan. Point of contact: Lori Roy, Project Manager, 611th CES/CEV 10471 20th Street, Elmendorf AFB, AK 99506-2270; Telephone (907) 552-7697. Last staff assigned Norberg (907) 269-3077.
Action Information
| Action Date | Action | Description | DEC Staff |
|---|---|---|---|
| 4/22/1994 | Preliminary Assessment Approved | Preliminary Assessment (dated January 1994) prepared for US Army Engineer District and by CH2MHill; received by ADEC on April 22, 1994. | Ray Burger |
| 5/30/1995 | Update or Other Action | Final Site Inspection Report (dated April 1995) prepared by Woodward-Clyde and for USAF 611th Air Support Group, 611th Civil Engineer Squadron; received by ADEC on May 3, 1995. | Ray Burger |
| 10/15/1996 | Update or Other Action | Final Environmental Assessment Pillar Mountain White Alice Communication System Demolition (dated October 1996). | Ray Burger |
| 2/12/1997 | Site Added to Database | Site added by Shannon and Wilson, Inc. | S&W-Miner |
| 2/12/1997 | Update or Other Action | (Old R:Base Action Code = RI - Remedial Investigation). RI action added 02/12/1997 by Shannon and Wilson, Inc., based on Air Force Relative Risk Evaluation Worksheet dated 9/18/95. No other information available. | S&W-Miner |
| 5/2/1997 | Site Characterization Workplan Approved | Final Contaminated Soil Removal and Tank Demolition Workplans and associated plans (dated May 1997). | Gretchen Pikul |
| 11/14/1997 | Update or Other Action | Final Management Action Plan (dated November 7, 1997 and received by ADEC on November 14, 1997. | Gretchen Pikul |
| 2/5/1998 | Site Characterization Report Approved | Environmental Remediation / Installation Demolition Report for Pillar Mountain WACS Site, Summer 1997 (dated December 1997) - ADEC comment letter dated February 5, 1998; ADEC comment letter regarding response to comments dated March 24, 1998; ADEC received final report on March 3, 1999. | Gretchen Pikul |
| 8/3/1999 | Proposed Plan | Proposed Plan comment resolution meeting on August 3, 1999; ADEC commented on Proposed Plan 2nd version on August 18, 1999; Proposed Plan released to public on November 3, 1999 with public comment period from November 1 to December 1, 1999; no public meeting requested by community. | Gretchen Pikul |
| 8/16/1999 | Update or Other Action | Environmental Baseline Survey (dated August 2, 1999). | Gretchen Pikul |
| 8/16/1999 | Meeting or Teleconference Held | Meeting with Air Force on Decision Document. | Gretchen Pikul |
| 1/10/2000 | Meeting or Teleconference Held | Final internal Decision Document briefing meeting; final draft version received on December 20, 1999 addressing ADEC comments made in August 1999; calls with Air Force project manager on requested revisions; ADEC and Air Force call with Kodiak City Manager on remedial action, institutional controls, proposed plan and decision document; ADEC signed the Decision Document on February 1, 2000. | Gretchen Pikul |
| 3/24/2000 | Record of Decision | Final Decision Document signed by ADEC on 2-1-00, and by Air Force on 3-24-00, received on 3-30-00. ICs required are Base Master Plan and land records., however, ICs have not yet been established. | Gretchen Pikul |
| 3/24/2000 | Conditional Closure Approved | Final Decision Document signed by ADEC on 2-1-00, and by Air Force on 3-24-00, received on 3-30-00. ICs required are Base Master Plan and land records., however, ICs have not yet been established. | Gretchen Pikul |
| 9/15/2005 | Institutional Control Record Established | ICs established in Base General Plan, dated 15 Sept 2005, to restrict digging in capped areas at Points Of Interest (POI) #5, #10, #11, and #13 where residual PCBs in soil remain. | Jeff Norberg |
Contaminant Information
| Name | Level Description | Media | Comments |
|---|---|---|---|
| PCBs - Total | > Human Health/Ingestion/Inhalation | Soil |
Control Type
| Type | Details |
|---|---|
| Land Use Plan / Maps / Base Master Plan | IC has been established within the Air Force Base General Plan, dated 15 Sept 2005. |
| Land Use Plan / Maps / Base Master Plan | Land was transferred to BLM and portions are currently being transferred to City of Kodiak. The City of Kodiak has agreed with the cleanup levels of the remaining PCBs in soil and has received a copy of the documentation with location maps in order to maintain ICs indefinitely. |
Requirements
| Description | Details |
|---|---|
| Excavation / Soil Movement Restrictions | No digging in area's where PCBs were capped. All of Pillar Mountain RRS falls under site OT01. Within site OT01 are points of interest (POIs) which contain up to the following residual PCBs in soil. POI #5: 118 mg/Kg 1-ft below ground surface (bgs); POI #10: 2.43 mg/Kg 6-in bgs; POI #11: 4.27 mg/Kg 3-ft bgs and 446 mg/Kg 6-ft bgs; and POI #13: 1.83 mg/Kg 3-ft bgs. None |
There are no documents for this site report.
No associated sites were found.