Site Report: Dutch Hbr-Unalaska Vly UST 2875
Site Name: | Dutch Hbr-Unalaska Vly UST 2875 |
---|---|
Address: | Hawley Lane, Building 2875, Unalaska, AK 99685 |
File Number: | 2542.38.023 |
Hazard ID: | 2885 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 53.851115 |
Longitude: | -166.507434 |
Horizontal Datum: | WGS84 |
![]() | ![]() |
![]() | ![]() |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Diesel fuel contamination from abandoned underground fuel storage tanks, most related to heating fuel. Building 2875 is the ruins of an old latrine located just north of UV-2860 on Hawley Lane. A 300 gallon heating oil UST and six cubic yards of impacted soil were removed in 1997. Confirmation sampling indicated DRO remain up to 93 mg/kg. Amaknak and Unalaska Islands were used by the military during World War II. The Japanese bombed Dutch Harbor and Fort Mears in 1941. Following the bombing the military dispersed its troops moving back up into Unalaska Valley and Pyramid Valley to minimize the potential for damage if future air raids occurred. The Corps of Engineers had a contractor tear down the abandoned buildings and debris and dispose of them in various landfills during the mid - late 1980s. Underground fuel tanks were abandoned in place. In the mid-1990s the Corps started working on the sites again under the Formerly Used Defense Sites (FUDS) program. Site inspections were done around the former buildings to look for remaining underground fuel tanks and other potential contaminant sources.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
6/5/2000 | Site Characterization Workplan Approved | Comprehensive Remedial Investigation Report, dated May 2000 and prepared by Jacobs Engineering, documents the UST was removed in Sept. 1997; approximately 6 cy of petroleum contaminated soil were removed and thermally treated. Two soil samples were collected at the limits of the excavation and analyzed for DRO, RRO, and BTEX. All analytical results met the most stringent method 2 soil cleanup levels. | John Halverson |
2/20/2002 | Record of Decision | DEC signed the Declaration of Decision No. 1, Closed Sites, Amaknak and Unalaska Islands, Jan. 2002. UST #2875 is one of thirteen sites documened in the report as meeting the closure requirements. | Jennifer Roberts |
2/20/2002 | Site Closure Approved | The decision document closing this site was signed on this date. | Jennifer Roberts |
1/23/2003 | Site Added to Database | Unalaska Valley expanded into a total of 26 unique sites from one. | John Halverson |
12/8/2003 | GIS Position Updated | TopoZone. | Debra Caillouet |
6/10/2005 | Update or Other Action | File number issued 2542.38.023. | Aggie Blandford |
2/22/2024 | Document, Report, or Work plan Review - other | On this date, DEC reviewed and approved the redline final, RTCs, and final Restoration Summary Report for the Amaknak Formerly Used Defense Sites F10AK0841-13, -14, -15, -16, -18, -20, Unalaska Valley, Pyramid Valley-Port Levashef, Summer Bay-Humpy Cove, Margaret Bay-Airport, Mount Ballyhoo, and Little South America in Unalaska, Alaska. Of the 53 sites included in this report, 39 of these sites are either closed in the Contaminated Sites database or are not eligible active sites. Fourteen (14) sites remain open in the CS database, either pending further coordination on the pathway to closure or are currently with DEC management for closure decision. This letter is documenting the approval of the final document but does not preclude the need for further investigation of sites included in the report. | Cascade Galasso-Irish |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
For more information about this site, contact DEC at (907) 465-5390. |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. |
There are no documents for this site report.
No associated sites were found.