Action Date |
Action |
Description |
DEC Staff |
12/12/2002 |
Site Ranked Using the AHRM |
Initial ranking. |
Jeff Conn |
12/12/2002 |
Site Added to Database |
DRO from AST. |
Jeff Conn |
12/12/2002 |
Update or Other Action |
Letter sent to Mike Raabe asking for soil sampling to be conducted. |
Jeff Conn |
8/29/2003 |
Site Number Identifier Changed |
Changed the Workplan from 01 to X1 to reflect the fact that this is a DoD site. |
Former Staff |
8/3/2005 |
Update or Other Action |
Staff submitted a letter to the Air Force regarding the UST at building 1301 (the UST has a different file number and hazard ID from the AST) and also requested confirmation sampling at the AST in order to close this site. 2002 soil gas survey at the AST site did not identify any vapors but soil gas data cannot be used to for site closure. |
Emily Youcha |
8/9/2005 |
GIS Position Updated |
Coordinate obtained from RP. |
Emily Youcha |
4/7/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Deborah Williams |
1/3/2011 |
Update or Other Action |
This entry contains only site-specific information. An informational site has been added to the database for actions that pertain to Eielson Air Force Base in its entirety. Please see ADEC file number 107.38.006/Hazard ID 25578/Eielson AFB Basewide Information. |
Kathleen Beutel |
11/4/2014 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 73896 Former AST. Restrictions are currently in place to prevent contaminant exposures. Approval is required for any activity on site that can result in access or movement of groundwater or soil. A 200-foot buffer boundary is on the site until better delineation can be defined. |
Anna Iverson |
9/4/2015 |
Update or Other Action |
This site is included in the Non-OU RI/FS Management Plan. Initial sampling results from the 2015 indicate the need for further sampling, and a Field Change Form for further sampling was approved on 9/4/15. |
Eric Breitenberger |
9/22/2015 |
CERCLA RI Plan Approved |
Joint approval issued by EPA and DEC for the final "Remedial Investigation / Feasibility Study Management Plan For Non-Operable Unit Source Areas, Eielson Performance-Based Remediation, Eielson Air Force Base, Alaska" dated September 2015 (Non-OU RI/FS MP). The Non-OU RI/FS MP describes planned remedial investigations at 17 contaminated sites at Eielson Air Force Base, including SO075. |
Melinda Brunner |
9/22/2015 |
CERCLA RI Plan Approved |
DEC and EPA jointly approved the "2015 Annual Field Sampling Plan, Eielson Performance-Based Remediation, Eielson Air Force Base, Alaska" dated September 2015 (FSP). The FSP describes remedial investigations planned for 2015 at 21 contaminated sites at Eielson Air Force Base, including SO075. The FSP is meant to be used in conjunction with the appropriate remedial investigation/feasibility study (RI/FS) management plans (i.e. Non-OU and OU 3, 4,& 5) and the Programmatic Quality Assurance Project Plan. |
Melinda Brunner |
10/28/2016 |
Document, Report, or Work plan Review - other |
DEC Reviewed the Non-OU RI/RA report. This report included the characterization of multiple sites. |
Monte Garroutte |
4/25/2017 |
Update or Other Action |
DEC reviewed and provided comments on the Draft Programmatic Quality Assurance Project Plan, Addendum No. 2, Eielson Air Force Base, Alaska (March, 2017). |
John O'Brien |
10/28/2017 |
Document, Report, or Work plan Review - other |
DEC reviewed and provided comments on the Draft 2015 Remedial Investigation/Risk Assessment Report for Non-Operable Unit Source Areas, Eielson AFB, Alaska [August 2016]. |
John O'Brien |
3/9/2018 |
Document, Report, or Work plan Review - other |
DEC issued comments on the Draft Site Characterization Report I Source Areas ST011, SD021, SD022, SD024, DP025, ST027, SS030, ST058, SO065, SO069, SO070, SO071, SO073, SO075, SS078, SS084, SO504, TU506, MY512, and MY518 dated February 2018. |
Bri Clark |
6/25/2018 |
Document, Report, or Work plan Review - other |
DEC issued comments on the Draft Site Characterization Report I Source Areas ST011, SD021, SD022, SD023, SD024, DP025, ST027, SS030, ST058, SO065, SO069, SO070, SO071, SO073, SO075, SS078, SS084, SO504, TU506, MY512, and MY518, Eielson Air Force Base, Alaska, dated February 2018. |
Bri Clark |
8/21/2019 |
Site Characterization Report Approved |
DEC Approval for the Final Site Characterization Report 1, Source areas ST011, SD021, SD022, SD023, SD024, DP025, ST027, SS030, ST058, SO065, SO069, SO070, SO071, SO073, SO075, SS078, SS084, SO504, TU506, MY512, and MY518, Eielson Performance Based Remediation, Eielson AFB, Alaska, May 2019 |
Sara Marshall |
5/12/2020 |
Update or Other Action |
A 2 party draft Decision Document (1 Part A) for Source Areas: SO065, SO069, SO070, SO071, SO073, SO075, SS084, and TU506, Eielson Air Force Base, Alaska, May 2020 was submitted. The sites have no known PFAS contamination associated with them. Any CERCLA contaminants will be addressed under CERCLA regulatory program in accordance with the Eielson Air Force Base, Federal Facilities Agreement. |
Dennis Shepard |
2/9/2022 |
Update or Other Action |
DEC approved and signed the Decision Document for Eielson Performance Based Remediation Source Areas SO075, SS078, SO504, MY512, and MY518, Eielson Air Force Base, Alaska (May 2021). The Decision Document describes the remedial actions at Eielson Source Areas SO075, SS078, SO504, MY512, and MY518, all of which are associated with potential contamination resulting from petroleum, storage, distribution, and/or use. The U.S. Air Force (USAF) is managing
remediation of petroleum, oil, and lubricants (POL) or petroleum-related contamination at these
source areas in accordance with the State-Eielson Agreement (USAF 2014d), the two-party agreement. Any Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) constituents remaining will be addressed by transferring source areas back to the Eielson Air Force Base, Federal Facility Agreement Under CERCLA Section 120 (USAF 2013a), the three-party agreement. |
Dennis Shepard |
5/9/2024 |
Update or Other Action |
DEC approved Land Use Control (LUC) boundary updates that were discussed at the 23 October 2023 meeting. The updated site boundaries were based on site evaluations performed since initial interim LUCs were place on the sites. Site SO075 boundaries are being expanded northeast to capture soil contamination. SS078 is being expanded to include a proposed monitoring well. MY512 was recommended for collapse and a shift north to include two monitoring well locations. MY518 and SO504 were recommended for site closure, but will retain current LUC boundaries until a final DEC decision is made. |
Axl LeVan |