Site Report: NPS Glacier Bay - Glacier Bay Lodge

Site Name: NPS Glacier Bay - Glacier Bay Lodge
Address: Glacier Bay National Park, Bartlett Cove, Gustavus, AK 99826
File Number: 1507.38.006
Hazard ID: 2971
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 58.453306
Longitude: -135.884306
Horizontal Datum:

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

In 1999 four underground heating oil storage tanks were decommissioned at the Glacier Bay Lodge. Two 3,000-gallon tanks were removed and the remaining tanks, one 3,000-gallon and one 7,500-gallon, were closed in place. Confirmation sample results from the excavations are below Method Two, Tables B1 and B2, migration to groundwater cleanup levels for diesel range organics and benzene, toluene, ethylbenzene, and xylenes. Approximately 300 cubic yards of petroleum contaminated soil was generated during these decommissioning activities. In 2006 a 1,000-gallon heating oil AST and associated piping servicing the boilers in the staff quarters at the Glacier Bay Lodge administrative area was removed and replaced with a new AST. Contamination was encountered during removal of the fuel lines and approximately 3 cubic yards of impacted soil was removed and stockpiled on site.

Action Information

Action Date Action Description DEC Staff
11/23/1999 Site Ranked Using the AHRM Initial ranking. Bill Janes
11/24/1999 Site Added to Database Approximately 300 cubic yards of contaminated soil associated with four non-regulated tanks. Bill Janes
12/10/1999 Site Characterization Report Approved Letter sent to NPS. Cleaning of site has been completed. Soil has been stockpiled and will be incorporated into NPS road paving project in 2001. Bill Janes
12/15/1999 Site Number Identifier Changed Reckey changed from 1999110126701 to 1998110112001. Former Staff
5/8/2000 Update or Other Action Soil from 5 Bartlett Cove VCP sites will be stockpiled with the GBL soil to be incorporated into the FY01 road project. Anne Marie Palmieri
10/29/2003 Update or Other Action Administrative file review for project manager transfer; file located and additional reveiw for groundwater monitoring scheduled. Bruce Wanstall
12/5/2005 Update or Other Action File Review. Soil incorporated into Bartlett Cove road project. Review of file shows confirmational soil excavation samples to meet the strictest Method One cleanup standards for DRO and BTEX compounds. Lodge is about 10 feet above high tide line. Water is supplied from an upgradient surfacewater source approximately 1.0 mile away from lodge. Will contact Park Service staff and recommend final closure of the site as originally proposed in 1999. Mike Jaynes
6/13/2008 Exposure Tracking Model Ranking Initial ETM ranking complete except for GW ingestion pathway - the source of drinking water for Bartlett Cove and the potential existence of GW wells in the area must be confirmed. Site closure recommended if GW is not used near the site. Daniel Fremgen
1/13/2009 Update or Other Action Groundwater verified not to be a source of drinking water at site. Alder Creek, a surface water body upgradient of the Lodge, is used. ETM edited to reflect this info. All soil samples well below cleanup levels. NFA should be issued for this site. Daniel Fremgen
4/5/2010 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 78868 name: AST at staff quarters Melody Debenham
8/11/2010 Cleanup Complete Determination Issued The cleanup actions to date have served to excavate and adequately remove contaminated soil associated with the decommissioning of 4 USTs at the Glacier Bay Lodge area in 1999 and the removal of one heating oil AST at the administrative area in 2006. Based on the information available, no further assessment or cleanup action is required. Melody Debenham
9/30/2014 Potentially Responsible Party/State Interest Letter Potentially responsible party letter sent to the National Park Service. Melody Debenham

Contaminant Information

Name Level Description Media Comments
DRO < Method 2 Most Stringent Soil

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

No associated sites were found.