Action Date |
Action |
Description |
DEC Staff |
11/12/1999 |
Site Added to Database |
POL wastes and radioactive mine tailings. 184,000 tons of radioactive waste rock is the upper bound on the estimate. This rock has gamma radiation levels exceeding 100 microR/hr. the content of RA-226 in the waste rock is estimated to range from 43 to 69x10*12 picocuries. Estimate 300 gallons of petroleum and 25 gallons of lubricating oil, anti-freeze, and transmission fluid. |
Bill Janes |
11/12/1999 |
Site Ranked Using the AHRM |
One value changed - Surface Water Exposure. |
Dennis Harwood |
11/18/1999 |
Site Number Identifier Changed |
Other Reckey associated with this site was 1995131018101 and 1998130933501. |
Former Staff |
6/9/2000 |
Update or Other Action |
Lynn sent letter to Keith Simila asking that action be taken to minimize risk. See G:\SPAR\Spar-Contaminated Sites\Bokan2.doc. |
Lynn Kent |
10/16/2000 |
Update or Other Action |
Follow-up letter sent to Keith asking for status update. According to Betsy Walatka signs have been ordered but have not yet arrived. Ken Maas also working on removal action. See SPAR\Spar-Contaminated Sites\SITES\Bokan Mt.doc. |
Bill Janes |
1/4/2001 |
Update or Other Action |
Betsy informed me that signs have been put up. Discussed possibility of site visit in spring. |
Bill Janes |
6/14/2001 |
Update or Other Action |
Per teleconference with Ken Maas. Red Dotson, the caretaker, removed twelve 55 gallon diesel drums, jugs of transmission fluid, oils, etc., and a wooden crate of battery acid. Taken to Ketchikan for disposal (Anderes Oil). |
Bill Janes |
12/10/2001 |
Update or Other Action |
PRP negotiation occurring. Funding for EECA available if PRP declines. Newmont Mining is one of the PRPs. EECA expected to be conducted this summer. |
Bill Janes |
1/8/2002 |
Update or Other Action |
Site name changed from Bokan Mountain Mine to Ross-Adams. |
Anne Marie Palmieri |
5/5/2003 |
Meeting or Teleconference Held |
Teleconference with EPA, Doug Dasher and FS. |
Anne Marie Palmieri |
9/22/2003 |
Update or Other Action |
FS has contracted with Kent & Sullivan to develop a PASI. |
Anne Marie Palmieri |
2/23/2004 |
Update or Other Action |
Staff provides comments on PA/SI workplan. |
Anne Marie Palmieri |
3/10/2004 |
Meeting or Teleconference Held |
Staff participates in comment resolution meeting with EPA and the USFS. |
Anne Marie Palmieri |
12/17/2004 |
Update or Other Action |
Staff provides comments on the draft Preliminary Assessment/Site Investigation report done for the Air Force. The report documented elevated levels of radioactive components in the waste rock at the 3 mining locations, along the haul road, and in the marine intertidal zone adjacent to an ore staging area. Contamination is also present in freshwater and marine sediments. |
Former Staff |
3/2/2007 |
Exposure Tracking Model Ranking |
|
Anne Marie Palmieri |
8/30/2007 |
Meeting or Teleconference Held |
Meeting with EPA and USFS to discuss path forward. DEC and EPA request that the USFS use the CERCLA remedial approach. |
Anne Marie Palmieri |
10/4/2007 |
Meeting or Teleconference Held |
Staff participates in pre-permitting meeting for exploration. |
Anne Marie Palmieri |
10/23/2007 |
Meeting or Teleconference Held |
Meeting with USFS, EPA, DEC. USFS commits to a "full characterization and full risk assessment under the removal path". DEC/EPA commit to providing a list of data gaps to USFS by 11-16-07. USFS unable to commit to a date for when their list might be completed. |
Anne Marie Palmieri |
11/16/2007 |
Update or Other Action |
DEC and EPA send combined list of data gaps to USFS. |
Anne Marie Palmieri |
12/14/2007 |
Update or Other Action |
USFS releases their data gaps memo authored by the US Army Corps of Engineers. |
Anne Marie Palmieri |
1/15/2008 |
Meeting or Teleconference Held |
A teleconference was held with the State (DEC, LAW, Epi), EPA and USFS to resolve comments on the technical memos provided by the different agencies on the data gaps which still need to be addressed after the PA/SI. USFS committed to resolving several internal issues within the next month. |
Anne Marie Palmieri |
1/30/2008 |
Meeting or Teleconference Held |
EPA and DEC meet wtih Landmark re: exploration and potential liability waiver |
Anne Marie Palmieri |
1/31/2008 |
Meeting or Teleconference Held |
USFS, EPA, and DEC -- data gap resolution |
Anne Marie Palmieri |
3/5/2008 |
Update or Other Action |
Staff provides comments on operations plan for exploration |
Anne Marie Palmieri |
3/14/2008 |
Meeting or Teleconference Held |
Meeting with State agencies re: Landmark/UCore exploration |
Anne Marie Palmieri |
6/22/2008 |
Site Visit |
site visit |
Anne Marie Palmieri |
6/24/2008 |
Meeting or Teleconference Held |
meeting with Landmark and UCore re: liability waiver |
Anne Marie Palmieri |
9/17/2008 |
Meeting or Teleconference Held |
meeting with EPA re: USFS scope of work for the EE/CA |
Anne Marie Palmieri |
9/29/2008 |
Update or Other Action |
DEC provides comments on the USFS scope of work by letter. |
Anne Marie Palmieri |
11/12/2008 |
Meeting or Teleconference Held |
Meeting with EPA, DEC, and USFS re: scope of work |
Anne Marie Palmieri |
1/21/2009 |
Meeting or Teleconference Held |
Meeting with USFS, Newmont, and DEC to discuss scope of work issues |
Anne Marie Palmieri |
4/17/2009 |
Update or Other Action |
USFS signs agreement with Newmont Mining Co and Dawn Mining Co to conduct an EE/CA. |
Anne Marie Palmieri |
5/5/2009 |
Meeting or Teleconference Held |
Public meeting held in Craig in conjunction with the Organized Village of Kasaan's mining symposium. |
Anne Marie Palmieri |
5/8/2009 |
Site Visit |
Site visit with EPA, USFS, Newmont, and OVK. |
Anne Marie Palmieri |
5/27/2009 |
Meeting or Teleconference Held |
Draft work plan for field work received and reviewed. Comments provided to USFS and Newmont. A comment resolution meeting was held on this date. |
Anne Marie Palmieri |
7/27/2010 |
Meeting or Teleconference Held |
Comment resolution meeting held this date. Subject of the meeting was the Draft Site Characterization Report. |
Anne Marie Palmieri |
3/29/2011 |
Document, Report, or Work plan Review - other |
DEC provided review comments on the draft Engineering Evaluation/Cost Analysis to the USFS this date. |
Anne Marie Palmieri |
1/6/2012 |
Update or Other Action |
The USFS provided Newmont's responses to DEC comments on the draft EE/CA this date. |
Anne Marie Palmieri |
3/12/2012 |
Update or Other Action |
DEC sent a letter this date to the USFS regarding Newmont's responses to DEC comments on the draft EE/CA. There were several responses which DEC did not concur with. Additional discussion will be needed in order to reach a resolution. |
Anne Marie Palmieri |
4/10/2013 |
Update or Other Action |
DEC sent a letter this date formally requesting that the USFS provide responses on DEC's comments on the draft EE/CA. |
Anne Marie Palmieri |
6/12/2013 |
Meeting or Teleconference Held |
A technical meeting was held this date with the USFS, Newmont, Newmont's consultant, and DEC (solid waste, contaminated sites, water quality) to discuss the remaining DEC comments on the draft EE/CA. |
Anne Marie Palmieri |
12/11/2013 |
Document, Report, or Work plan Review - other |
CS staff reviewed two technical memos from Newmont and provided comments to the USFS. |
Anne Marie Palmieri |
3/11/2014 |
Document, Report, or Work plan Review - other |
CS staff reviewed a technical memo from Newmont regarding how they propose to conduct monitoring following the removal to ensure that all contamination is removed. This memo is in response to DEC comments on the draft EE/CA. |
Anne Marie Palmieri |
9/8/2014 |
Document, Report, or Work plan Review - other |
DEC provided review comments to the USFS and Newmont on the draft-final Engineering Evaluation/Cost Analysis. |
Anne Marie Palmieri |
4/28/2015 |
Public Notice |
The USFS held a public meeting on 4/28 and 4/29 regarding the draft EE/CA. DEC attended both of these meetings. |
Anne Marie Palmieri |
9/2/2016 |
Update or Other Action |
On this date, DEC sent a letter to the USFS requesting action on a number of sites. For this site, DEC stated: The USFS negotiated an agreement with Newmont Mining and Dawn Mining to evaluate the presence of contamination at the site under an EE/CA. The USFS held a public comment period on the draft EE/CA in May 2015. To date, the DEC has not received a copy of an action memo or any documentation from the USFS regarding a decision following the completion of the public comment period. It is understood that the USFS will negotiate with other parties to conduct the actual cleanup. DEC hereby requests that by October 10, 2016 the USFS provide an estimated timeline of milestones for the cleanup. |
Anne Marie Palmieri |
10/11/2017 |
Meeting or Teleconference Held |
DEC, EPA, and USFS met to discuss roles and responsibilities for each agency. Specific actions regarding this site were not discussed at this meeting. |
Anne Marie Palmieri |
12/1/2017 |
Document, Report, or Work plan Review - other |
On this date, EPA and DEC provided joint comments on the Draft Action Memo to the USFS. |
Anne Marie Palmieri |
12/20/2017 |
Update or Other Action |
On this date, DEC requested a meeting with the USFS to discuss its responses to the DEC/EPA comments on the Action Memo. DEC received the responses on 12/15, however does not agree with some of them. |
Anne Marie Palmieri |
1/22/2018 |
Update or Other Action |
DEC and EPA request a meeting with the USFS to discuss the revised Action Memo and the responses to comments. No reply to the previous request had been received. |
Anne Marie Palmieri |
2/14/2018 |
Meeting or Teleconference Held |
On this date, DEC and USFS met to discuss programmatic issues. A meeting between EPA, DEC, and USFS technical staff and attorneys was agreed to. |
Anne Marie Palmieri |
4/3/2018 |
Update or Other Action |
The USFS notified DEC that it has issued the Action Memo for the removal at the site. DEC and EPA issues were not resolved. |
Anne Marie Palmieri |
4/6/2018 |
Update or Other Action |
The EPA provided a letter to the USFS on this date regarding the revised Action Memo. The Action Memo was signed by the USFS without resolving all of DEC and EPA concerns. Also, the USFS has excluded DEC and EPA from the discussions with the PRPs about the settlement agreement. |
Anne Marie Palmieri |
5/8/2019 |
Meeting or Teleconference Held |
DEC and the USFS met on this date to discuss many sites and how to move the sites forward in the cleanup process. A next meeting was scheduled for August. |
Anne Marie Palmieri |
8/12/2019 |
Meeting or Teleconference Held |
CS Staff met with the USFS to discuss site issues on this date. |
Anne Marie Palmieri |
10/8/2019 |
Meeting or Teleconference Held |
CS Staff met with the USFS to discuss general coordination issues on this date. |
Anne Marie Palmieri |
2/12/2020 |
Meeting or Teleconference Held |
CS Staff met with the USFS to discuss general coordination and site issues on this date. |
Anne Marie Palmieri |
7/24/2020 |
Update or Other Action |
DEC provided comments on the draft Settlement Agreement between Newmont/Dawn Mining and the USFS on this date. |
Anne Marie Palmieri |
3/29/2021 |
Document, Report, or Work plan Review - other |
Staff reviewed and provided comments on the Borrow Source and Mine Rock Pre-Design work plans. |
Anne Marie Palmieri |
8/6/2021 |
Document, Report, or Work plan Review - other |
Staff provided comments on 5 draft work plans - Mine Portal Pre-Design, Haul and Mine Road, Site inspection and Misc. Waste Inventory, Surface Hydrology Pre-Design Investigation, and QAPP. Comments were provided to the USFS. |
Anne Marie Palmieri |
9/7/2021 |
Meeting or Teleconference Held |
Meeting with USFS, Newmont and ADNR to discuss process for cleaning up the inter-tidal area.
|
Anne Marie Palmieri |
4/9/2024 |
Document, Report, or Work plan Review - other |
DEC has reviewed the draft surface water sampling work plan, which details proposed baseline surface water quality data collection prior to and during construction efforts for the Non-Time Critical Action (NTCRA) in which mine rock and mine-affected materials will be excavated site-wide. Water quality samples will be collected from Kendrick Creek in locations of suitable physical habitat for salmonid spawning and rearing, and post-NTCRA sampling will be collected biennially for three years, followed by once every five years thereafter dependent on results. |
Tim Sharp |