Action Date |
Action |
Description |
DEC Staff |
2/16/1999 |
Preliminary Assessment Approved |
Reviewed Environmental Site Assessment Report and discussed with Ron Rozak, consultant. |
Donald Seagren |
3/23/1999 |
Update or Other Action |
Reviewed preliminary site assessment and issued Cost Recovery Notification letter. |
Donald Seagren |
6/13/1999 |
Update or Other Action |
Approved transport of 50 cubic yards of petroleum contaminated soils to SPI for thermal remediation. |
Donald Seagren |
8/11/1999 |
Update or Other Action |
Approved transport of 50 cubic yards of thermally remediated soils back to the facility. |
Donald Seagren |
10/11/1999 |
Site Characterization Workplan Approved |
Interim Site Characterization Workplan reviewed and approved. |
Donald Seagren |
11/8/1999 |
Site Added to Database |
Subsurface fuel oil contamination associated with fuel service business. Site is former location of two 15,000-gallon fuel oil ASTs. |
Greg Light |
11/8/1999 |
Site Ranked Using the AHRM |
No values changed during initial site ranking. |
Greg Light |
11/25/1999 |
Update or Other Action |
Review Underground Tank Removal and Cleanup Report; Coordinate response with UST program staff. |
Donald Seagren |
11/27/1999 |
Site Ranked Using the AHRM |
Ranking updated by Seagren. Quantity, Site Access, and Groundwater Exposure Index values modified by Seagren. Surface Water Exposure Index Value modified by Harwood. |
Donald Seagren |
12/23/1999 |
Site Characterization Report Approved |
Interim Characterization Report reviewed and approved. Quarterly GW monitoring will continue to determine plume status. Remediation measures will then be finalized. |
Donald Seagren |
4/9/2001 |
Update or Other Action |
Review monitoring report and send letter outlining remediation steps that need to be taken |
Donald Seagren |
2/23/2004 |
Update or Other Action |
File number assigned and entered into the Fileroom DB and CS DB. |
Alyce Hughey |
3/3/2005 |
Update or Other Action |
File review - sent letter requesting project status update, additional LTM data and submission of corrective action plan for implementation during the summer of 2005. |
Donald Seagren |
3/14/2005 |
Update or Other Action |
Received response from consultant summarizing actions taken to date and proposed actions for this summer. Additional sampling and analysis to be conducted this summer. Report & CAP to be presented July-August 05. |
Donald Seagren |
7/6/2005 |
Update or Other Action |
Reviewed report on GW sampling events 5,6,7 & 8. Soil and GW contamination on the property exceeds ADEC cleanup standards for DRO, GRO and Benzene. Gw contamination has migrated off site. The area is served by the City of Kenai water system. A report with conclusions & recommendations will be submitted during July/August 05. The current risk to human health and the environment is low under current conditions. |
Donald Seagren |
8/18/2005 |
GIS Position Updated |
Using the Aerial View, from a Report of Groundwater Sampling Former Doyle's Fuel Storage, from Rozak Engineering, dated June 30, 2005, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes No Topo Basemap, TopoZone Pro Street Map, Black and White Aerial Photo, on a Medium Size Map, View Scale 1:10,000, Coordinate Datum NAD83. High degree of confidence in accuracy of location. |
Alyce Hughey |
6/23/2006 |
Update or Other Action |
Telephone call from Ron Rozak. After further analysis, he met with the Doyles and have come up with a plan for installing another downgradient monitor well and installing an air sparging wsystem to address in-situ contmamination. Teh work plan will be submitted within the next few weeks, fo implementation during the summer of 06 |
Donald Seagren |
9/19/2006 |
Cleanup Plan Approved |
Review and approve Conceptual Remedial Action Plan. Rozak Engineering to develop detailed work plan for approval. |
Donald Seagren |
11/2/2006 |
Cleanup Plan Approved |
Remedial action plan to address in-situ contamination approved. Aggressive, enhanced, in-situ biological degredation consisting of the conbimantion of air-sparging, nutrient injection and heating will be used to reducethe concentration or petroleum hydrocarbons in the sub-surface. |
Donald Seagren |
4/13/2007 |
Exposure Tracking Model Ranking |
|
Donald Seagren |
6/14/2007 |
Update or Other Action |
Following a work plan approved during the winter of 06/07; one 30' air sparge well and one point of compliance well will be installed on 15 June 07 by Hughes Drilling.Ron Rozak and Dave thomas will be overseeing the instllations. |
Donald Seagren |
11/5/2007 |
Update or Other Action |
All the wells proposed in the Remedial Action Plan date 27 October 06 have been installed. The Air Sparge test well was installe don 6/15/07 but th etruck rig could not get to the POC wells site due to overhead electical lines. A flow test on the AS well was conducted to determine the radius of influence. It concludedd tha ta total of 5-6 AS wells with 2'screened interval at 25-27' bgs would cover the spill site. Due to the drillers heavy work load, the additional AS wells were not installed until 4 September 07. A total of 6 AS wells have been installed. The POC well was installed on 12 October 07.No petroleum odor or sheen was detected during drilling or development.A groundwater survey and sample results from the POC well are exp[ected by the end of November. Some of the equipment for remedial action has been installed. But, due to timing of the AS well installationa dn Redoubt Plumbing's work load, they have been unable to install piping between the equipment and the AS well site. this will be done as soon as possible. |
Donald Seagren |
6/12/2008 |
Update or Other Action |
Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. |
Alyce Hughey |
8/19/2010 |
Update or Other Action |
Contacted consultant Ron Rozak with Rozak Engineering regarding the status of the site. Ron stated that two seasons of remediation efforts had occurred at the site and that an end of remediation report will be submitted in the near future for our review. |
Alyce Hughey |
4/15/2011 |
Document, Report, or Work plan Review - other |
Reviewed the Report of Remedial Action and Cleanup Confirmation, dated February 18, 2011, from Rozak Engineering. In June of 2008 the installation of the in-situ remedial system was completed which consisted of air-sparging, nutrient injection using nitrogen, phosphorus and potash, and heating the subsurface with hot water introduced through two infiltration trenches. On July 1, 2008 the hot water and air sparge systems were first placed into operation, with the hot water treatment running until mid-September and the air sparging running until mid-November. Two applications of fertilizer was applied at the site one in late July, and the second application was added late in September, for a total of 60 pounds of nitrogen, 20 pounds of phosphorus and 15 pounds of potash. On June 10, 2009 the hot water and air sparge systems were placed back into operation, with the hot water running until mid-November and the air sparge system running until late-November. A total of 50 pounds of Nitrogen, 10 pounds of phosphorus and 5 pounds of potash were added in 2009. Four groundwater monitoring events occurred from November of 2008 until August of 2010 with the last sampling detecting groundwater concentrations below the groundwater cleanup levels for the first time since 1999 when groundwater monitoring began at the site. |
Alyce Hughey |
6/28/2011 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 74006 Underground Heating Fuel Tank. |
Paul Horwath |
7/4/2011 |
Final Cleanup Report Reviewed |
Completed the review of Rozak Engineering's final cleanup report. |
Paul Horwath |
7/7/2011 |
Long Term Monitoring Complete |
Groundwater quality monitoring is no longer required. The groundwater monitoring wells must now be properly decommissioned, with a written groundwater decommissioning report submitted to ADEC by December 31, 2011. |
Paul Horwath |
7/7/2011 |
Cleanup Complete Determination Issued |
A cleanup complete determination decision letter was issued July 7, 2011. The groundwater monitoring wells must now be decommissioned, with a documenting report provdied to ADEC by December 31, 2011. |
Paul Horwath |
8/24/2011 |
Document, Report, or Work plan Review - other |
Reviewed and approved the Proposed Work Plan for Decommissioning Seven Groundwater Monitoring Wells, dated August 7, 2011, prepared and submitted by Rozak Engineering. The work plan approval entails the decommissioning of 7 groundwater monitoring wells, 6 air sparge wells, and 2 infiltration galleries. |
Paul Horwath |
12/15/2011 |
Document, Report, or Work plan Review - other |
Reviewed the Report for Decommissioning Groundwater Monitor and Air Sparge Wells, dated October 22, 2011, from Rozak Engineering. Decommissioning activities began for the seven Monitoring Wells on August 27th, resumed on September 17th, and finished on September 18th. The six Air Sparge Wells and the two Infiltration galleries were decommissioned on September 23rd and 24th. Twenty-seven feet of infiltration and air supply lines that were closest to the remediation connex were left in place due to the close proximity of buried electrical service cables. |
Alyce Hughey |