Draft Release Investigation Report dated November 2001. Soil and surface water sampling was conducted to characterize areas of concern. Sampling locations included the following: Station Tank Farm, Beach AST, Barracks, Signal and Power Building, Incinerator Building, Three 20,000-gallon water cisterns, Pipeline, mark Lake. |
Sammi Castle |
3/1/2002 |
Document, Report, or Work plan Review - other |
Final Interim Corrective Action Report USCG Loran C Station dated March 2002. This interim corrective action report has been prepared to present the results of the sampling associated with the Phase I demolition of the USCG Sitkinak LORAN C Station. |
Sammi Castle |
7/31/2002 |
Update or Other Action |
Clean up initiated. Some soils were excavated and additional soil excavation may be required. Further investigation may be required. |
Donald Seagren |
11/19/2003 |
Site Added to Database |
DRO contamination. |
Alyce Hughey |
11/19/2003 |
Site Ranked Using the AHRM |
Initial ranking. |
Alyce Hughey |
11/19/2003 |
Update or Other Action |
Report Review by Don Seagren, letter issued to Mark Ridgeway regarding report review comments. |
Donald Seagren |
5/19/2004 |
Update or Other Action |
File number assigned and entered into the fileroom DB and CS DB. |
Alyce Hughey |
7/19/2005 |
Cleanup Level(s) Approved |
Coast Guard has submitted sampling data showing the groundwater at the station is saline and not potable. Draft Sitkinak 2004 Soil and Groundwater Sampling Report dated 4/22/2005. Approval of ingestion and inhalation cleanup levels for site COC's in letter. Letter is at G:\SPAR\CS\Contaminated Site Files (38)\2504 Sitkinak Island\2504.38.001 USCG Loran C Station Sitkinak\042005 Soil and GW Sampling Report.doc |
Mike Jaynes |
9/28/2006 |
Site Characterization Workplan Approved |
Workplan for the sampling of soil stockpiles and gw monitoring wells approved this date. |
Anne Marie Palmieri |
4/30/2007 |
Document, Report, or Work plan Review - other |
Final Sitkinak 2006 Site Investigation Report. All analytical results from the two soil stockpiles sampled during the 2006 SI were below ADEC Method Two Ingestion and Inhalation cleanup levels. Only one well samples (MW-8 for DRO) exceeded cleanup criteria. |
Sammi Castle |
12/1/2007 |
Document, Report, or Work plan Review - other |
USCG Site Compliance Report dated December 2007. |
Sammi Castle |
4/7/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Anne Marie Palmieri |
6/4/2009 |
Document, Report, or Work plan Review - other |
Sitkinak Site Visit Tech Memo - detailed work performed during the May 13, 2009 site visit. During the site visit, three soil samples were collected from the drainage ditch near the former fuel farm. DRO in the samples reached a maximum of 24,300 mg/Kg. |
Sammi Castle |
6/18/2010 |
Cleanup Plan Approved |
Two work plans approved this date: 1) landspreading of stockpiled soil; and 2) groundwater monitoring (wells 2 & 8) and soil sampling/excavation in drainage ditch. Work is to be conducted in June 2010. |
Anne Marie Palmieri |
12/6/2011 |
Update or Other Action |
Site transferred from Palmieri to Dooley. AEA |
Susan Carberry |
12/7/2011 |
Meeting or Teleconference Held |
ADEC staff attended a meeting with the US Coast Guard to discuss state-wide site prioritization. |
Meghan Dooley |
3/22/2018 |
Update or Other Action |
New Project Manager assigned. |
Jamie McKellar |
3/14/2019 |
Meeting or Teleconference Held |
Teleconference with USCG, DEC, USACE and North Wind (USCG contractor) to discuss active USCG contaminated sites. |
Jamie McKellar |
10/13/2022 |
Update or Other Action |
New Project Manager assigned |
Alyssa Wood |
1/23/2023 |
CERCLA PA |
ADEC approved a combined PA report evaluating 65 USCG Units within District 17 (Alaska), excluding Base Kodiak, for potential PFAS releases related to the use of AFFF. Six potential release locations were identified at four sites: Air Station Sitka, Loran C - Attu Island, Port Clarence Loran Station, and Loran C Station - Sitkinak. These locations were recommended for Site Inspection (SI). |
Nick Waldo |
7/12/2024 |
Document, Report, or Work plan Review - other |
ADEC approved the Per- And Polyfluoroalkyl Substances Site Inspection Uniform Federal Policy-Quality Assurance Project Plan Addendum for U.S. Coast Guard Long Range Navigation Station Sitkinak. This workplan is an addendum to the Programmatic UFP-QAPP for Per- and Polyfluoroalkyl Substances (PFAS) Site Inspections (SIs) at U.S. Coast Guard (USCG) Facilities Nationwide. The addendum outlines an SI plan specific to Sitkinak Island in an effort to determine the presence or absence of PFAS contamination. |