Action Date |
Action |
Description |
DEC Staff |
7/19/1999 |
Site Added to Database |
Elevated levels of PCE, TCE and DRO in the groundwater above MCLs. |
Deborah Williams |
7/19/1999 |
Site Ranked Using the AHRM |
By staff. |
Deborah Williams |
7/10/2002 |
GIS Position Updated |
Changed the Latitude, Longitude, Method Accuracy, Accuracy and Unit fields. |
Heather Goldman |
4/7/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Tamara Cardona-Marek |
4/9/2008 |
Update or Other Action |
Letter sent to current property owners requesting information on the environmental status of the site and their willingness to do additional assessment. |
Tamara Cardona-Marek |
4/23/2008 |
Update or Other Action |
Spoke with Ed Derby from Raintree Properties. His records indicate at the time the property was purchased no information was provided regarding contamination. He is not sure previous owner (Ray Kimberlain) was aware of contamination. Will look into doing a site assessment to obtain closure. |
Tamara Cardona-Marek |
7/7/2008 |
Update or Other Action |
Sent letter requesting site status and assessment plans. Nothing has been received since last communication. |
Tamara Cardona-Marek |
7/22/2008 |
Update or Other Action |
Received fax from Ed Darby at Raintree properties. He has hired Travis/Peterson, they should be submitting a work plan within the next few weeks. |
Tamara Cardona-Marek |
8/5/2008 |
Meeting or Teleconference Held |
Meeting with consultant Travis /Peterson about actions needed on site. ADEC requested temporary well points at the old leach field location and downgradient of the old leach field. Analysis for DRO, RRO, GRO and VOC's requested on groundwater samples. Location of the supply well requested to determine if it needs to be sampled. |
Tamara Cardona-Marek |
10/13/2008 |
Document, Report, or Work plan Review - other |
Received the Travis/Peterson Groundwater Monitoring Report for the three temporary wells installed at the site. One well had detectable levels of PCE but below cleanup level. However, groundwater depth was not measured at the time the samples were collected therefore ADEC requested re-sampling of the wells. |
Tamara Cardona-Marek |
10/24/2008 |
Update or Other Action |
ADEC received from TPECI the depths to groundwater in the temporary wells during sampling. ADEC will evaluate this data. |
Tamara Cardona-Marek |
11/10/2008 |
Update or Other Action |
ADEC sent letter to RP requesting conceptual site model for the site. Additional evaluation of the site will be done once this information has been received. |
Tamara Cardona-Marek |
1/5/2009 |
Cleanup Complete Determination Issued |
ADEC granted a Cleanup Complete with Institutional Controls determination on December 17, 2008. |
Tamara Cardona-Marek |
1/5/2009 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Tamara Cardona-Marek |
1/5/2009 |
Record of Decision |
Cleanup Complete with Institutional Controls record of decision signed by responsible party and received on December 31, 2008. |
Tamara Cardona-Marek |
2/9/2009 |
Update or Other Action |
Spoke with site owner (Ed Darby, Truckwell) to remind him of need to record Deed Notice. He was not aware of this since it was sent to Arnie Swanson (partner at Truckwell). DEC staff e-mailed Deed Notice to Ed Darby. |
Tamara Cardona-Marek |
2/18/2009 |
Update or Other Action |
Copy of recorded deed notice received from consultant. Recorded on 02/10/2009. |
Tamara Cardona-Marek |
2/15/2011 |
Update or Other Action |
DEC received from Truckwell of Alaska the results of the sampling of the drinking water well. Drinking water well was sampled per the requirements of the cleanup complete with IC's determination in July 2010. No diesel range organics or volatile organic compounds were detected in the sample. |
Tamara Cardona-Marek |
3/24/2011 |
Update or Other Action |
DEC sent letter to responsible party indicatinhg that sampling of the drinking water well is complete but decommissioning of the monitoring wells continues to be an outstanding issue of the Cleanup Complete with Institutional Controls determination. |
Tamara Cardona-Marek |
3/31/2011 |
Institutional Control Compliance Review |
IC review conducted.
|
Erik Norberg |
4/12/2011 |
Update or Other Action |
Travis / Peterson has proposed to re-drill the wells as a method for decommissioning the remaining monitoring wells. Work will be performed during July/August 2011. |
Tamara Cardona-Marek |
8/1/2011 |
Update or Other Action |
DEC received Well Decommissioning report from Travis/Peterson. Four wells were decommissioned. |
Tamara Cardona-Marek |
7/3/2013 |
Institutional Control Update |
Staff changed from Tamara Cardona-Marek to IC Unit. |
Kristin Thompson |
12/4/2013 |
Institutional Control Compliance Review |
IC review conducted. Reminder system set up for reminder letter in 2014. |
Evonne Reese |
12/4/2013 |
Update or Other Action |
Site symbol visually adjusted using ArcGIS and documents from file. 12/04/13; MLB. 64.813437, -147.789765. |
Michelle Barnes |
5/14/2014 |
Institutional Control Compliance Review |
IC compliance review conducted. IC reminder letter issued. Reminder system set to follow-up in 2019. |
Kristin Thompson |
6/6/2019 |
Institutional Control Compliance Review |
IC compliance completed and a reminder letter was issued. |
Evonne Reese |
6/18/2024 |
Institutional Control Compliance Review |
IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in five years’ time. |
Gaige Robinson |