Site Report: AT&T Alascom Manley Mountain RR
| Site Name: | AT&T Alascom Manley Mountain RR |
|---|---|
| Address: | Manley Mountain, 19 Miles East of Sitka, Sitka, AK 99835 |
| File Number: | 1525.38.009 |
| Hazard ID: | 3125 |
| Status: | Cleanup Complete |
| Staff: | IC Unit, 9074655229 dec.icunit@alaska.gov |
| Latitude: | 57.115000 |
| Longitude: | -134.810556 |
| Horizontal Datum: |
| ![]() |
![]() | ![]() |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Diesel contaminated soil from two past spills. Manleyville is ~20 miles east of Sitka, on the east shore of Baranof Island. Site is about 1.5 miles north of Manleyville.
Action Information
| Action Date | Action | Description | DEC Staff |
|---|---|---|---|
| 3/22/1999 | Site Characterization Report Approved | Site Characterization Report Approved this date. | Anne Marie Palmieri |
| 6/9/1999 | Cleanup Plan Approved | Cleanup Plan Approved this date. | Anne Marie Palmieri |
| 6/9/1999 | Cleanup Level(s) Approved | Method 2 soil. | Anne Marie Palmieri |
| 7/20/1999 | Update or Other Action | Method 3 calculations submitted. | Anne Marie Palmieri |
| 8/11/1999 | Meeting or Teleconference Held | USFS, Nick Rodes (New Horizons - consultant). | Anne Marie Palmieri |
| 8/23/1999 | Interim Removal Action Approved | Soils outside of the dike to 2000mg/kg DRO; transport to USR in Juneau. | Anne Marie Palmieri |
| 8/26/1999 | Meeting or Teleconference Held | Site visit. | Anne Marie Palmieri |
| 10/5/1999 | Cleanup Level(s) Approved | Method 3 GW ACLs based on total organic carbon. | Anne Marie Palmieri |
| 10/10/1999 | Site Ranked Using the AHRM | Initial ranking. | Anne Marie Palmieri |
| 10/28/1999 | Site Added to Database | Diesel contaminated soil from two past spills. | Anne Marie Palmieri |
| 11/6/2002 | Institutional Control Record Established | No ICs required to be implemented but used for tracking purposes only. | Anne Marie Palmieri |
| 11/6/2002 | Conditional Closure Approved | Site closure letter for method 3 ACL issued this date. | Anne Marie Palmieri |
| 2/24/2010 | Institutional Control Record Removed | Administrative action since the remaining site conditions meet the 2009 site closure criteria. | Evonne Reese |
Contaminant Information
| Name | Level Description | Media | Comments |
|---|---|---|---|
| DRO | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil |
Control Type
| Type | Details |
|---|---|
| No ICs Required |
Requirements
| Description | Details |
|---|---|
| Advance approval required to transport soil or groundwater off-site. |
No associated sites were found.