Action Date |
Action |
Description |
DEC Staff |
1/22/1999 |
Update or Other Action |
EPA CERCLA discovery date. |
Bruce Wanstall |
7/21/1999 |
Preliminary Assessment Approved |
EPA START Preliminary Assessment completed. |
Bruce Wanstall |
1/24/2001 |
Site Added to Database |
Abandoned fuel storage tanks and drums. |
Bruce Wanstall |
1/24/2001 |
Site Ranked Using the AHRM |
Preliminary ranking. |
Bruce Wanstall |
12/29/2003 |
Update or Other Action |
Site Assessment Draft recieved. Lat/ Long interpolated using NAD 23 datum. |
Bruce Wanstall |
1/5/2004 |
Update or Other Action |
Site Investigation Report on AST removal action at the site. Findings discussed with environmental consultant; inaccessible contamination is associated with a french drain adjacent to the operations building |
Bruce Wanstall |
1/26/2004 |
Update or Other Action |
Changed the name in the Stakeholders Table for: AT&T Alascom - Huntington to AT&T Alascom - Seaford and associated address from Huntington NY to Seaford NY to reflect current RP/Landowner contact information. Also updated the telephone number. |
Bruce Wanstall |
1/27/2004 |
Update or Other Action |
Ongoing review of the removal actions and site assessment sampling results. Discussed draft Site Assessment and workplan design for 2004 with consultant. |
Bruce Wanstall |
1/29/2004 |
Update or Other Action |
Elevated concentrations of benzo(a)pyrene (PAH), benzene (BTEX) and DRO detected in soil found along UST vent piping adjacent to the operations building. Discussion of 2003 Site Assessment with consultant and additional contaminated soil removal. |
Bruce Wanstall |
6/28/2004 |
Update or Other Action |
ENSR consulted on pending GW investigation for Lot 5. ENSR CAP recommendations to AT&T appear accurate and acceptable to the RP and prospective purchaser KPU. |
Bruce Wanstall |
2/4/2005 |
Update or Other Action |
Draft Site Investigation Report recieved by email; lab report by hard copy. |
Bruce Wanstall |
2/18/2005 |
Update or Other Action |
CS and LUST files gathered for the property and adjacent property status review; combined features mapped; CSM roughed out for Site Characterization and Cleanup Level review. |
Bruce Wanstall |
2/24/2005 |
Cleanup Level(s) Approved |
Method Two migration to groundwater for the 40 inch rainfall zone soil cleanup levels and industrial use soil cleanup level for lead approved for the site. Reviewed piping run tightness tests; IDW storage and sampling methods; and lab report. The Abandoned UST surface sampling was re-scheduled for mid December 2004. |
Bruce Wanstall |
4/22/2005 |
Update or Other Action |
Contacted Jim Wickes in Anchorage to request an update on site status and that a site visit be arranged to examine the property for groundwater seeps that could be used to assess groundwater conditions. |
Bruce Wanstall |
5/4/2005 |
Update or Other Action |
ENSR phoned to state that the property sale is on hold; AT&T intends to upgrade all fuel storage tanks on the property; ENSR will check for seeps on-site to obtain additional data if possible; otherwise will send update as contract work is finalized.
|
Bruce Wanstall |
7/18/2005 |
Update or Other Action |
ADEC evening drive-by on the road behind and above the facility; photographed the UST and AST sites behind operations building; no improvements to the fuel storage areas were observed at this time.
|
Bruce Wanstall |
7/13/2006 |
Update or Other Action |
Telephoned AT&T Southeast Regional Office; Brian Buck stated that last fall AT&T installed 2 - 550 gallon double-walled ASTs replacing the 6,000gallon tank and another double-walled tank replaced the other single-walled AST; cleanup was apparently performed by ENSR; called ENSR and left a message requesting a Final Report for the cleanup.
|
Bruce Wanstall |
9/26/2006 |
Update or Other Action |
ADEC attempted to contact consultant ENSR about facility rebuilding project Report; left message to return the call and updated records.
|
Bruce Wanstall |
9/29/2006 |
Update or Other Action |
AT&T Southeast staff stated that last fall AT&T installed 2 550 gallon double-walled ASTs replacing the 6,000gallon tank and another double-walled tank replaced the other single-walled AST; cleanup was apparently performed by ENSR; Report is pending. |
Bruce Wanstall |
8/6/2007 |
Exposure Tracking Model Ranking |
Initial rankng found the controlling exposure pathway is surface soil where DRO concentration exceed ingestion screening levels. Updated ranking of the UST sites after cleanup; property restrictions are necessary to control excavation of residual contaminated soil and access to ground water that may be present on the propery. |
Bruce Wanstall |
8/7/2007 |
Update or Other Action |
Request for site investigation and cleanup at the site was sent by letter to AT&T Environmental Health & Safety office in New York. |
Bruce Wanstall |
2/28/2008 |
Update or Other Action |
August 2007 ADEC letter requesting a information on the scheduled site cleanup was forwarded by email to the RP and RP consultant (Bamburger & ENSR). |
Bruce Wanstall |
4/24/2008 |
Update or Other Action |
ADEC quality assurance review of laboratory reports in the 2005 Cleanup Report finds the data acceptable for site DQOs. |
Bruce Wanstall |
4/29/2008 |
Update or Other Action |
ADEC letter approved data in the ENSR cleanup report with requests to address data gaps. |
Bruce Wanstall |
5/7/2008 |
Update or Other Action |
Prepare and attend teleconference with AT&T and ENSR to discuss ADEC data request.
|
Bruce Wanstall |
8/19/2008 |
Document, Report, or Work plan Review - other |
ADEC reviewed the Spill Prevention, Control and Countermeasures Plan for the facility. The revised SPCC Plan includes a provision to conduct and maintain a log of routine visual inspections for petroleum sheen on surface drainages entering Marconi Creek stormwater discharge points. |
Bruce Wanstall |
9/30/2008 |
Update or Other Action |
ADEC contacted ENSR to provide an update on a schedule to complete the cleanup closure process. |
Bruce Wanstall |
12/17/2008 |
Final Cleanup Report Reviewed |
Small quantities of contaminated soil remains at three locations after site cleanup. None of the sources pose and acceptable human health or ecological exposure risk. Sampling and analysis of surface drainages for Water Quality Standard benchmarks show no impacts are migrating to surface water. |
Bruce Wanstall |
12/18/2008 |
Update or Other Action |
Environmental Tracking Module updated to reflect site cleanup effectiveness in controlling exposure pathways from historical petroleum contaminated soil that remains on the property in de-minimis quantities. |
Bruce Wanstall |
12/24/2008 |
Cleanup Complete Determination Issued |
ADEC sent to AT&T Alascom a determination letter designating the site cleanup remedy is complete for this facility and no conditions are placed on the property as a result of the historical spill events. |
Bruce Wanstall |
10/31/2014 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 78245 Above Ground Storage Tanks. |
Bruce Wanstall |