Site Report: AKARNG Nightmute FSA
Site Name: | AKARNG Nightmute FSA |
---|---|
Address: | Unnamed Road, Nightmute, AK 99690 |
File Number: | 2435.38.001 |
Hazard ID: | 3199 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 60.479662 |
Longitude: | -164.724998 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Petroleum product from heating oil system. Last staff assigned was Pexton.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
7/27/1998 | Update or Other Action | Received Preliminary Assessment Records Review report and Draft Site Sampling Plan, both prepared by Hart Crowser, Inc. | Scott Pexton |
9/14/1998 | Site Characterization Workplan Approved | Received Final Site Sampling Plan for Site Investigation, prepared by Hart Crowser, Inc. | Scott Pexton |
1/25/1999 | Update or Other Action | Received Draft Site Investigation report, prepared by Hart Crowser, Inc. | Scott Pexton |
6/17/1999 | Update or Other Action | Letter sent with comments on draft site investigation report. | Scott Pexton |
8/20/1999 | Update or Other Action | Received Final Site Investigation report, prepared by Hart Crowser, Inc. | Scott Pexton |
11/12/1999 | Site Added to Database | Petroleum product from heating oil system. | Scott Pexton |
11/16/1999 | Site Ranked Using the AHRM | Site ranked based on information provided in the Final Site Investigation report prepared by Hart Crowser, Inc. | Scott Pexton |
1/22/2004 | Update or Other Action | ADEC received draft Alternate Cleanup Level Demonstration Project workplan. | Beatrice Egbejimba |
3/22/2004 | Update or Other Action | File number assigned: 2435.38.001. | Sarah Cunningham |
6/2/2004 | Update or Other Action | ADEC received Final Interim Removal Action Plan. | Beatrice Egbejimba |
7/2/2004 | Update or Other Action | DEC issued a letter stating the following: DEC has completed review of the document titled: Final Interim Removal Action Plan, Federal Scout Armory, Nightmute, Alaska dated March 2004 and offers the following comments. DEC concurs with the general approach of the plan however, can not provide approval to the plan as written. The plan provides a general approach for the excavation, and handling of impacted petroleum contaminated soil but lacks site specific detail for DEC approval under 18 AAC 75. DEC understands that the AKARNG is performing this action to reduce risk to human health and the environment under 18 AAC 75.330, to provide for a partial cleanup at the site and not achieve cleanup levels. It is presumed that information gathered during this interim action will provide data to be used in determining any future actions required for site clean up. In conclusion, DEC has no objection to the interim removal approach provided and will defer any further regulatory decisions until review of the data collected from the site work. | David Pikul |
4/1/2008 | Exposure Tracking Model Ranking | Initial ranking with ETM completed. | Debra Caillouet |
4/25/2008 | Site Characterization Report Approved | The Alaska Department of Environmental Conservation (DEC) received the Alternative Cleanup Level Demonstration Project Report, Nightmute Federal Scout Armory, April 2006 on April 14, 2008. The report incorporates acceptable response to comment provided by DEC on the draft. The report provides additional site characterization data and is approved under 18 AAC 75.335. DEC is not providing a determination on an alternative cleanup level at this time. | Debra Caillouet |
2/3/2010 | Meeting or Teleconference Held | Staff participated in the Installation Action Plan meeting. | Debra Caillouet |
11/30/2010 | Document, Report, or Work plan Review - other | Staff reviewed and sent comment to the Alaska Army National Guard on the Draft Work Plan for Site Characterization at 21 Alaska Federal Scout Readiness Centers, November 2010, including the Site Specific Plans for Akiak, St. Mary’s and Tuntutuliak. | Debra Caillouet |
5/23/2011 | Site Characterization Workplan Approved | Final Work Plan for Site Characterization at 21 Alaska Federal Scout Readiness Centers, April 2011 approved. | Debra Caillouet |
3/20/2012 | Document, Report, or Work plan Review - other | Comment sent on the draft data gap investigation report. | Debra Caillouet |
5/31/2013 | Cleanup Complete Determination Issued | Final Nightmute Federal Scout Readiness Center, Data Gap Investigation Report December 2012 | Debra Caillouet |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|
No associated sites were found.