Action Date |
Action |
Description |
DEC Staff |
4/2/1999 |
Site Ranked Using the AHRM |
By staff. |
Deborah Williams |
5/6/1999 |
Update or Other Action |
Sample results from drinking water wells were sent to RP and adjacent property owner. Both water samples were below the MCLs. |
Deborah Williams |
5/28/1999 |
Site Characterization Workplan Approved |
Workplan approved to install three monitoring wells (one upgradient and two downgradient), twice a year. |
Deborah Williams |
5/29/1999 |
Cleanup Level(s) Approved |
Groundwater monitoring wells will be sampled twice a year. |
Deborah Williams |
9/17/1999 |
Site Added to Database |
Soil and groundwater contamination. |
Deborah Williams |
3/9/2000 |
Site Characterization Report Approved |
Site Characterization report submitted to ADEC by Shannon & Wilson. Benzene level was found at 2.37 ppb in MW-2. DRO level was below detection limits. The on-site drinking water well sample results were below detection limits. |
Deborah Williams |
11/13/2000 |
Update or Other Action |
Groundwater monitoring report submitted by Shannon & Wilson. Benzene level at MW-2 was 0.734 ppb. DRO was below detection limits. The drinking water well sample results indicated levels below detection limits for BTEX. |
Deborah Williams |
12/18/2001 |
Update or Other Action |
Groundwater monitoring report submitted by Shannon & Wilson. Water samples were collected on 7/6/01 and BTEX and DRO were below detection limits. Drinking water well sample results also indicated DRO and BTEX below detection limits. |
Deborah Williams |
7/10/2002 |
GIS Position Updated |
Changed the Latitude, Longitude, Method Accuracy, Accuracy and Unit fields. |
Heather Goldman |
8/11/2004 |
Update or Other Action |
Groundwater samples collected from the monitoring wells and the on-site drinking water well on June 7, 2004, did not contain BTEX compounds that exceed the cleanup levels for the DRO or BTEX. Shannon & Wilson recommends that a NFA be issued for the site. ADEC requested at least one or two indoor air samples be collected from the basement to ensure that vapor intrusion is not a complete pathway. |
Deborah Williams |
8/27/2004 |
Update or Other Action |
ADEC talked to Shannon and Wilson and they stated that the Insurance Company refused to pay for indoor air sampling. The insurance company is only concerned about protecting the waters of the State. Shannon and Wilson also stated that there is currently new owners at the site who may not be aware of the site conditions. Their names are Stephen and Michelle Hekeler. |
Deborah Williams |
9/3/2004 |
Update or Other Action |
ADEC sent a letter to the new owners regarding the contamination at the property. Along with the letter, ADEC sent a copy of the Notice of Environmental Contamination to recorded on the deed so that a conditional closure could be issued for the site. |
Deborah Williams |
5/14/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Neal Everson |
2/25/2009 |
Update or Other Action |
Sent letter to new owner trying to schedule a meeting to discuss remaining issues before cleanup complete. |
Neal Everson |
4/22/2009 |
Meeting or Teleconference Held |
The current owner is on deployment until August 2009. |
Neal Everson |
8/26/2015 |
Potentially Responsible Party/State Interest Letter |
PRP letter sent to current landowner. Contacted by Ray Braiser of Re/Max. Property is up for sale. |
Janice Wiegers |
10/22/2015 |
Update or Other Action |
Realtor submitted photographs demonstrating well decommissioning complete. |
Janice Wiegers |
10/25/2015 |
Update or Other Action |
Closure letter in progress. |
Janice Wiegers |
10/25/2015 |
Cleanup Complete Determination Issued |
Petroleum contamination may remain beneath the north and east side of the garage but is of limited extent. |
Janice Wiegers |
12/3/2015 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Janice Wiegers |
1/6/2016 |
Update or Other Action |
Deed notice recorded on property. |
Janice Wiegers |
9/2/2016 |
Institutional Control Compliance Review |
IC compliance review conducted. Staff changed from Janice Wiegers to IC Unit. The ICs Agreement and Signature Page that is required as part of the closure of this site has not been returned. Will check-in with the former project manager on this and plan to send a letter requesting signature. Reminder system set to follow-up on land use conditions every five years. |
Kristin Thompson |
9/9/2016 |
Institutional Control Update |
An IC reminder letter requesting the ICs Agreement and Signature Page be signed and returned was issued to the landowner on this date. |
Kristin Thompson |
5/15/2017 |
Institutional Control Update |
An IC reminder letter requesting the ICs Agreement and Signature Page be signed and returned (3rd notice of request) was issued to the landowner on this date. |
Kristin Thompson |
6/8/2017 |
Institutional Control Periodic Reporting |
Received an email from the landowner stating the signed ICs agreement page has been placed in the mail and should arrive at the ADEC office sometime next week. Reminder system has been reset to check on this. |
Kristin Thompson |
6/12/2017 |
Institutional Control Update |
Received the signed ICs Agreement page this date. |
Kristin Thompson |
12/3/2024 |
Institutional Control Compliance Review |
IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in five years’ time. |
Gaige Robinson |