Action Date |
Action |
Description |
DEC Staff |
5/22/2001 |
Update or Other Action |
Groundwater Monitoring report recieved |
Jeff Conn |
5/24/2001 |
Update or Other Action |
Corrective action report received |
Jeff Conn |
7/9/2001 |
Update or Other Action |
Letter written to Karen Lidster, owner of 237 Ina Street, telling her that her property had not been contaminated by the spill. This letter requested by Ms. Lidster. |
Jeff Conn |
7/23/2001 |
Update or Other Action |
Air monitoring and GW results recieved |
Jeff Conn |
9/14/2001 |
Update or Other Action |
Air monitoring and GW report recieved |
Jeff Conn |
9/19/2001 |
Update or Other Action |
Meeting between ADEC, First Strike, and Rockwell to discuss cleanup levels required and NFRAP vs closure. |
Jeff Conn |
9/27/2001 |
Update or Other Action |
Letter from Jeff Conn to James Roles of First Strike Environmental summarizing meeting and requirements for NFRAPO or closure. |
Jeff Conn |
10/23/2001 |
Update or Other Action |
Air Screening/GW monitoring results recieved |
Jeff Conn |
2/27/2002 |
Update or Other Action |
Phone call received from Susan Cruikshank asking about results from air sampling in house and wondering about health effects. |
Jeff Conn |
3/1/2002 |
Site Added to Database |
Heating oil. Transferred to CS from Spills. Spills file: 102.38.118 |
Former Staff |
3/4/2002 |
Update or Other Action |
Quarterly air and GW monitoring report recieved |
Jeff Conn |
4/9/2002 |
Update or Other Action |
Indoor Air Quality/VOC monitoring report recieved from Nortech |
Jeff Conn |
10/28/2002 |
Update or Other Action |
Quarterly air and GW monitoring repoer recieved |
Jeff Conn |
11/12/2002 |
Update or Other Action |
Sampling Plan Recieved and approved |
Jeff Conn |
2/25/2003 |
Update or Other Action |
Quarterly air and groundwater report received |
Sharon Richmond |
2/25/2003 |
Update or Other Action |
Crawlspace soil sampling report received. |
Sharon Richmond |
6/11/2003 |
Update or Other Action |
Several attempts were made to contact Ms. Cruikshank regarding a pending NFRAP but were unsuccessful. Received letter from James Rolesos First Strike Environmental stating that the propeerty owner (Ms. Cruikshank) has settled with ZC Insurance/National Claims Management. First Strike Environmental is closing the spill/release cleanup project at this time. DEC will continue attempts to reach Ms. Cruikshank. |
Sharon Richmond |
10/26/2006 |
Update or Other Action |
Sent letter reminding Ms. Cruikshank that a Conditional Closure could be issued for this property if she would file a Notice of Residual Contamination with the State Recorders Office. |
Kim DeRuyter |
5/16/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Neal Everson |
4/22/2009 |
Update or Other Action |
According to FNSB database- this property has a new owner. |
Neal Everson |
7/7/2017 |
Site Visit |
DEC staff visited the site to view the crawlspace vapor barrier and collect VOC readings using a PID in the crawlspace and beneath the vapor barrier. No VOCs were detected. |
Shawn Tisdell |
7/13/2017 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 74211 HOT overfill. |
Shawn Tisdell |
7/25/2017 |
Meeting or Teleconference Held |
DEC staff met with RP to sign the notice of environmental contamination and discuss preparation for site closure. These preparations include decommissioning the monitoring well and sealing the vapor barrier. |
Shawn Tisdell |
7/27/2017 |
Update or Other Action |
A notice of environmental contamination has been filed on the property deed with the DNR Recorders Office. |
Shawn Tisdell |
8/8/2017 |
Site Visit |
DEC staff visited the site and decommissioned the monitoring well by adding bentonite chips to the 2 inch well that was cut 12 inches below grade. |
Shawn Tisdell |
8/30/2017 |
Cleanup Complete Determination Issued |
A cleanup complete determination has been issued for this site with institutional controls for the management of remaining contaminated soil. |
Shawn Tisdell |
8/30/2017 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Shawn Tisdell |
6/15/2018 |
Institutional Control Compliance Review |
IC compliance review conducted. Staff changed from Shawn Tisdell to IC Unit. Closure/IC Details updated. Reminder system set to follow-up every two years. |
Kristin Thompson |
10/15/2019 |
Institutional Control Compliance Review |
An Institutional Controls reminder letter mailed to the responsible party/landowner on this date. |
Mossy Mead |