| Action Date |
Action |
Description |
DEC Staff |
| 2/27/2001 |
Meeting or Teleconference Held |
Met with building owner representative and consultant to discuss next steps. Owner wants to close tanks in place due to the numerous utilities in the area. ADEC requirements include installing a groundwater monitoring well as close as possible to the most contaminated area, and completing a well search for a 300-foot radius surrounding the tanks. |
Eileen Olson |
| 3/1/2001 |
Site Added to Database |
DRO contamination. |
Eileen Olson |
| 3/1/2001 |
Site Ranked Using the AHRM |
Initial ranking. |
Eileen Olson |
| 5/14/2001 |
Update or Other Action |
Received work plan to remove and/or close in place two underground fuel storage tanks. |
Eileen Olson |
| 6/11/2001 |
Site Characterization Workplan Approved |
Workplan received May14, 2001 approved for the removal and/or in-place closure of two underground storage tanks. The plan proposes excavating contaminated soils associated with the USTs and collecting and analyzing confirmation samples from the resultant excavation. At least one UST will be removed, and the second may be removed if necessary to access contaminated soil. |
Eileen Olson |
| 8/7/2001 |
Update or Other Action |
Workplan of 8/6/01 approved for additional site characterization of groundwater and soils. |
Eileen Olson |
| 11/21/2001 |
Update or Other Action |
Letter issued that is a Record of Decision and that grants NFRAP status with IC as deed notice. A minimum of one year of quarterly monitoring is required. |
Eileen Olson |
| 11/21/2001 |
Record of Decision |
NFRAP/IC and ROD all in one letter of this date with deed notice attached. |
Eileen Olson |
| 11/21/2001 |
Institutional Control Record Established |
Deed notice to be recorded within 60 days of receipt of letter provided with 11/21/01 NFRAP letter. |
Eileen Olson |
| 11/21/2001 |
Long Term Monitoring Established |
Letter issued that is a Record of Decision and that grants NFRAP status with IC as deed notice. A minimum of one year of quarterly monitoring is required. |
Eileen Olson |
| 12/1/2001 |
Update or Other Action |
Date that Notice of Environmental Contamination was recorded (DEC apparently received a copy for the first time on April 26, 2006, but the document may have been received earlier and misplaced). |
Eileen Olson |
| 12/13/2001 |
Update or Other Action |
Approved plan dated 12/12/2001 for long-term monitoring. |
Eileen Olson |
| 1/9/2002 |
Update or Other Action |
Received "December 2001 Groundwater Sample Results" dated 1/8/2002. This was 2nd monitoring event; results similar to baseline monitoring results of August 2001. Next monitoring scheduled for mid-March 2002. |
Eileen Olson |
| 2/21/2002 |
Update or Other Action |
Email to consultant acknowledging receipt of 1/8/2002 monitoring report. |
Eileen Olson |
| 3/7/2003 |
Update or Other Action |
Sampling results for quarterly monitoring for one year received; all requirements for NFRAP/IC met. |
Eileen Olson |
| 9/16/2003 |
Update or Other Action |
Rec'd letter from Anchorage Public Private Partnership, LLC, owner of former City Hall/Hill Bldg. requesting response regarding whether minimum requirements for groundwater monitoring were met with the completion of four quarterly sampling events that concluded in October 200 and that were summarized in a March 7, 2003 letter. |
Eileen Olson |
| 11/3/2006 |
Conditional Closure Approved |
All conditions met with respect to long-term monitoring. Issued final letter titled "Approval of Conditional Site Closure status and acknowledgement of Completion of Long-Term Monitoring requirements." The Department's "No Further Remedial Action" letter of November 21,2001 required quarterly groundwater monitoring of the three monitoring wells at the site for a minimum of
one year, with the first monitoring event to take place in November or December 2001, to establish a trend in the levels of benzene, GRO, and DRO. Monitoring wells remain at the property. |
Eileen Olson |
| 11/3/2006 |
Long Term Monitoring Complete |
Long-term groundwater monitoring complete as noted in letter of same date granting conditional site closure. |
Eileen Olson |
| 3/29/2007 |
Update or Other Action |
Staff made the following changes to site database entries:
1-Changed action of 11/21/2001 from "Conditional Site Closure" to "Long-Term Monitoring Established" to reflect the fact that monitoring was required before final conditional site closure was granted.
2-Added "conditional site closure" and "long-term monitoring complete" actions dated 11-3-2006. |
Eileen Olson |
| 4/10/2012 |
Update or Other Action |
Found deed notice in the hard file at the Anchorage office and attached document in CS database.
|
Kristin Thompson |
| 9/20/2012 |
Update or Other Action |
Staff changed from Eileen Olson to IC Unit. |
Kristin Thompson |
| 9/27/2012 |
Institutional Control Compliance Review |
IC review conducted. |
Evonne Reese |
| 3/18/2015 |
Institutional Control Update |
An IC reminder letter was issued to the responsible party on this date. |
Kristin Thompson |
| 6/20/2018 |
Institutional Control Compliance Review |
IC compliance review conducted. Closure/IC Details updated. Reminder system already set for next follow-up in 2020. |
Kristin Thompson |
| 8/9/2024 |
Institutional Control Compliance Review |
IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in five years’ time. |
Gaige Robinson |