| Action Date |
Action |
Description |
DEC Staff |
| 4/15/2000 |
Site Added to Database |
Petroleum. |
Elim Yoon |
| 4/15/2000 |
Record of Decision |
The Record of Decision for this site was signed this date. |
Elim Yoon |
| 10/10/2003 |
Record of Decision |
Site removed from OU A ROD by OU A ROD Amendment for regulation under 18 AAC 75. |
Sami Goldman |
| 3/17/2004 |
Institutional Control Record Established |
Interim conveyance document contains an equitable servitude that restricts residential land use as well as the domestic use of groundwater. Site is also located in the downtown excavation notification zone. |
Jason Weigle |
| 9/1/2004 |
Update or Other Action |
Tanks are part of spill located around Yakutat Hanger; RAC is in progress around site, including free product recovery |
Jason Weigle |
| 9/1/2004 |
Update or Other Action |
Site is in the draft proposed plan stage |
Jason Weigle |
| 9/15/2004 |
Risk Assessment Report Approved |
Risk Assessment approved as part of Focused Feasibility Study for Free-Product Sites Below Health Goals |
Jason Weigle |
| 9/15/2004 |
Site Characterization Report Approved |
Site characterization report approved as part of Focused Feasibility Study for Free-Product Sites Below Health Goals |
Jason Weigle |
| 10/19/2004 |
GIS Position Updated |
Latitude and Longitude was derived using ArcGIS with either High Resolution Aerial Photography from the Navy with an up to 3 meters error, or line maps used in investigations combined with road layers, +/-25 feet accuracy. Metadata is as follows: Updated NAD 1983 State Plane Alaska 10 FIPS 5010 Feet; Projection: Lambert Conformal Conic; False Easting: 3280833.333333; False Northing: 0.000000; Central Meridian: -176.000000; Standard Parallel 1: 51.833333; Standard Parallel 2: 53.833333; Latitude of Origin: 51.000000; GCS North American 1983. |
Jason Weigle |
| 10/26/2004 |
Conditional Closure Approved |
Changed status to NFRAP; not expecting any additional work to take place at this site. |
Jason Weigle |
| 11/19/2004 |
Update or Other Action |
Draft Final Cleanup Report, 19 Sites submitted to Department for Review. |
Jason Weigle |
| 12/10/2004 |
Cleanup Level(s) Approved |
10X Table C levels selected in Proposed Plan. |
Jason Weigle |
| 12/10/2004 |
Proposed Plan |
Proposed plan approved on this date |
Jason Weigle |
| 12/10/2004 |
Update or Other Action |
Review of Draft Final Cleanup Report, 19 sites completed; comments were submitted to the Navy. The document was incomplete as submitted; Navy will revise and resubmit. |
Jason Weigle |
| 1/24/2005 |
Update or Other Action |
Received copy of the Draft Decision Document for Petroleum Sites with No Unacceptable Risk for review. |
Jason Weigle |
| 2/8/2005 |
Update or Other Action |
Risk assessments were used to justify remedial endpoints for active remediation, not final clean-up endpoints. |
Jason Weigle |
| 2/8/2005 |
Update or Other Action |
Limited groundwater monitoring selected for the Yakutat Hangar site in Proposed Plan. Wells will monitor any residual affect from this site. |
Jason Weigle |
| 2/17/2005 |
Update or Other Action |
Completed review of the Draft Decision Document for Petroleum Sites with No Unacceptable Risk. Sent comments to the Navy for incorporation into the Decision Document. |
Jason Weigle |
| 2/17/2005 |
Update or Other Action |
Received copy of the 2004 Annual Groundwater Monitoring Report for review. |
Jason Weigle |
| 3/4/2005 |
Update or Other Action |
Completed review of the 2004 Annual Groundwater Monitoring Report; sent comments to Navy. |
Jason Weigle |
| 3/7/2005 |
Update or Other Action |
Added MRTS data, derived from ADNR and USGS range, township, and section data overlaid on lat/lon coordinates derived previously. Accuracy is equivalent to the lat/lon coordinates. MRTS information depicts the center point of range fans and target areas; actual target areas or fans may overlap several sections. |
Jason Weigle |
| 3/8/2005 |
Update or Other Action |
Added legal description for site. |
Jason Weigle |
| 5/20/2005 |
Record of Decision |
The Decision Document for Petroleum Sites with No Unacceptable Risks was signed on this date. |
Jason Weigle |
| 1/11/2006 |
Update or Other Action |
Interim removal action completed at this site. The OU A ROD selected free product recovery as an interim measure at this site. A report, the Closure Report, Interim Action Free Product Recovery, was submitted on November 18, 2005 for review. The Department completed review and submitted a closure letter on January 11, 2006, closing the interim remedy in favor of the currently selected remedy in the Decision Document for this site. |
Jason Weigle |
| 1/19/2006 |
Update or Other Action |
File number issued 2501.38.003.08. |
Aggie Blandford |
| 3/20/2006 |
Update or Other Action |
Final 2005 Institutional Control Primary Site Inspection Report received on this date. No IC problems noted at this site. |
Jason Weigle |
| 3/20/2006 |
Update or Other Action |
The draft annual groundwater monitoring report for 2005 was received on this date. |
Jason Weigle |
| 2/16/2011 |
Document, Report, or Work plan Review - other |
The draft 2010 IC Site Inspection Report was received on January 11, 2011 and DEC sent comments on February 16, 2011. There were no observed problems with ICs at this site. |
Meghan Dooley |
| 3/11/2024 |
ANCSA Program Eligible |
This site meets the criteria for the EPA Contaminated ANCSA Lands program: the site is on ANCSA conveyed land, the contamination occurred pre-ANCSA conveyance, and there is documented proof of contamination that exceeds DEC’s cleanup values in 18 AAC 75. This site will be listed as “verified” on EPA’s contaminated lands inventory. |
Brittani Mack |
| 9/18/2025 |
Site Visit |
CSP staff conducted a site visit to Adak Island September 17-20, 2025. Along with EPA and the Navy, CSP staff attended a Regional Advisory Board (RAB) meeting in Adak to engage with the community and discuss ongoing environmental cleanup efforts at the former Adak Naval Air Station. While on island, CSP joined EPA and the Navy to visit multiple contaminated sites and met with a community member to observe the waterline supplying drinking water from Lake Bonnie Rose. |
Jamie McKellar |
| 9/29/2025 |
Document, Report, or Work plan Review - other |
COMPREHENSIVE MONITORING PLAN, Revision 9, Institutional Control Management Plan. DEC provided comments on CMP Revision 9 which describes the mechanisms that have been implemented to ensure compliance with institutional controls (ICs) for sites at the former Adak NAS (includes active sites and sites closed with ICs). The CMP also includes the details for Munitions Educational Awareness Program, which is required by the OU B-1 ROD and will address sites in the in-draft OU B-2 ROD. Note that munitions sites addressed in the OU B-1 ROD with slopes exceeding 30 degrees were issued No Further Action determinations as part of that ROD. This includes C3-01A through C3-01F, FB-01, FB-03,
260 HH-01, ML-01A, ML-01B, and ML-01C. |
Jamie McKellar |
| 10/21/2025 |
Institutional Control Periodic Reporting |
REPORT APPROVAL: DEC approved the 2024 Institutional Controls Inspection Report, which documents site inspections conducted between August 15–30, 2024. While the report is approved, DEC has noted several observations for documentation, including references to RCRA status, environmental release reporting, SWMU 1 and SWMU 20. These observations do not affect the approval of the ICIR but may warrant further evaluation during the upcoming Five-Year Review. DEC continues to coordinate with the Navy to ensure long-term protectiveness of institutional controls at the Adak site. |
Jamie McKellar |