Action Date |
Action |
Description |
DEC Staff |
9/19/2001 |
Site Added to Database |
Petroleum contamination. |
Bruce Wanstall |
9/19/2001 |
Site Ranked Using the AHRM |
Preliminary ranking. |
Bruce Wanstall |
1/6/2004 |
Update or Other Action |
Request for NFRAP submitted on 11/20/03 by Williams. Shannon & Wilson had installed three soil borings and temporary wells in 2000 for a limited Phase II Assessment. The assessment was completed due to possible transfer of the property to Usibelli Coal. The only contaminant to exceed cleanup levels was DRO in MW-1 at 7.28 mg/L. This well appeared to be placed outside the footprint of the former tank farm. On 11/24/03, Usibelli submitted corrections to the 2000 report. Usibelli noted that the corrections did not change the conclusions of the report. |
Janice Wiegers |
1/6/2004 |
Update or Other Action |
Reviewed site information to see if this was the same site as "Williams Healy Tank Farm" File #150.38.023. The Williams Healy Tank Farm is located directly off the Parks HIghway, while this site is located near Sutrana. |
Janice Wiegers |
1/21/2004 |
Update or Other Action |
DEC responded to the request for closure and requested delineation of the extent and concentration of soil and groundwater contamination; monitoring to determine groundwater flow direction; and information about possible exposure pathways, including potential for migration to Healy Creek. |
Janice Wiegers |
5/9/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Neal Everson |
6/15/2009 |
Update or Other Action |
Initial ranking corrected due to ETM error in surface water pathway. |
Mitzi Read |
1/15/2016 |
Potentially Responsible Party/State Interest Letter |
PRP letter sent to Williams Alaska Petroleum through the registered agent, CT Corporation System. |
Janice Wiegers |
1/15/2016 |
Update or Other Action |
Letter sent to CT Corporation System, registered agent for Williams Alaska Petroleum, requesting update regarding current property ownership and cleanup status. |
Janice Wiegers |
3/18/2016 |
Update or Other Action |
Certified letter sent to CT Corporation requesting workplan for additional site characterization by May 2, 2016. |
Janice Wiegers |
5/2/2016 |
Update or Other Action |
Received letter from Williams legal counsel requesting 60 days extension to complete a review of records. Extension granted by DEC. |
Janice Wiegers |
6/27/2016 |
Update or Other Action |
Received call from Shannon & Wilson. They are working on a workplan and requested a deadline extension. The deadline was extended until July 20. |
Janice Wiegers |
6/30/2016 |
Meeting or Teleconference Held |
DEC met with Shannon & Wilson and Williams Petroleum to discuss available information on property ownership and ownership history and plans for investigation. |
Janice Wiegers |
7/5/2016 |
Update or Other Action |
Received letter acknowledging DEC's deadline extension to July 20. Letter indicated Williams is reviewing records to determine the current property owner and plans to perform a survey of property boundaries. |
Janice Wiegers |
7/20/2016 |
Update or Other Action |
Notified that Willams and Shannon & Wilson are working on getting property boundaries surveyed. DEC extended the deadline for a workplan to December 31, 2016 to allow time for additional property research. |
Janice Wiegers |
2/14/2017 |
Document, Report, or Work plan Review - other |
Shannon & Wilson submitted a December 2016 draft workplan to collect soil and groundwater samples from four locations in and around former tank farm. DEC responded with comments to the work plan on 2/14/2017. The comments requested additional information on the tank farm configuration and recommended additional sampling within the bermed area of the tank farm. |
Janice Wiegers |
8/4/2017 |
Document, Report, or Work plan Review - other |
Final workplan submitted, reviewed, and approved. Approval letter sent to Williams. |
Janice Wiegers |
3/20/2018 |
Update or Other Action |
Notified by DEC's Division of Water of the Rosalie Coal Mine Project that is planned along the Healy Creek Road. Plans include construction of a Haul Road through the Alaska Railroad right-of-way. |
Janice Wiegers |
3/23/2018 |
Update or Other Action |
Lattitude/longitude of site updated due to better information on former tank locations. |
Janice Wiegers |
3/23/2018 |
Update or Other Action |
Co-ordinated with DEC Division of Water, Usibelli, and Williams regarding application for Rosalie Coal Mine Project. Project would include a haul road running along the south site of this side in the railroad right-of-way. Road construction not likely to happen for about 7 years. |
Janice Wiegers |
7/16/2018 |
Update or Other Action |
Site characterization report submitted by Shannon & Wilson. Seven soil boring and co-located temporary well points were installed around the former tank farm. Groundwater flow direction was south-southwest with a gradient of 0.014 to 0.019 foot/foot. Petroleum compounds were present in soil (DRO, naphthalene, ethylbenzene, 1,2,4-trimethylbenzene, and 1,3,6-trimethylbenzene) and groundwater (naphthalene and 1,2,4-trimethylbenzene) above DEC cleanup levels. PAHs were tested in SB17-03 and 1-methylnaphthalene and 2-methylnaphthalene were present above soil cleanup levels. The most contaminated soil sampling location appeared to be SB17-03, which is located approximately 100 feet south of the former tank farm and near the southern property boundary. Some groundwater contamination was found south and southwest of the former tank farm but at low levels. During well development and sampling, temporary wells did not recharge well. One well remained dry and was not sampled. |
Janice Wiegers |
10/29/2018 |
Update or Other Action |
Letter sent to responsible party requesting additional site characterization to delineate extent of impacts. |
Janice Wiegers |