Site Report: Fort Greely Old Power Generation Bldg 323 BRAC 116

Site Name: Fort Greely Old Power Generation Bldg 323 BRAC 116
Address: 300' East of Robin Road, 250' North of Post Road, Fort Greely, AK 99731
File Number: 141.38.071
Hazard ID: 3702
Status: Active
Staff: Carly Jensen, 9072697558 carly.jensen@alaska.gov
Latitude: 63.980597
Longitude: -145.726111
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

The Old Power Generation Building, or Building 323, is also known as Base Realignment and Closure (BRAC) 116. The 30 foot by 75 foot concrete foundation of the former Building 323 was discovered during a site investigation in 1996. The building is believed to have been a former steam generation facility and had rectangular pits/vaults along two sides of the foundation that contained apparent tank cradles. Soil staining and petroleum contaminated soils were identified during a 1998 investigation. Additional investigation and removal actions occurred in 1999, 2000, 2010, and 2011. Confirmation sample results from the removal actions show diesel range organics (DRO) contamination remaining in the subsurface soils (top 15 feet) above the ADEC migration to groundwater cleanup levels. Confirmation sidewall samples from the 2011 southeast and northwest excavation have DRO concentrations above the ADEC migration to groundwater cleanup level at depths 8 to 15 feet below ground surface. Additional site characterization work is needed to delineate the remaining contamination before this site can be closed. The corresponding Army HQAES site number is: 02341.1052.

Action Information

Action Date Action Description DEC Staff
2/8/2001 Site Added to Database Diesel fuel Bruce Wanstall
11/7/2002 Update or Other Action Proposed Plan from SMDC pending. Greg Light
10/1/2004 Institutional Control Record Established In the October 2004 Draft Decision Document Fact Sheets, administrative controls (ACs)were estblished in order to minimize risk to human health and the environment. The site is included in the post’s Geographic Information System (GIS), a tool used in the Dig Permit process for notifying contractors, workers, and base personnel of the potential for contamination to exist at this site. The Dig Permit process is used to prevent installation of water production well(s) through the contaminated area, and prevent removal of contaminated material from the site to off-base locations or to environmentally sensitive areas. If future land disturbance activities at the site encounter contamination, the contaminated material encountered will be properly remediated or disposed of in accordance with applicable regulations. The site will be included in 5-year reviews to periodically verify compliance with the ACs. Emily Youcha
12/14/2004 Update or Other Action In 1998, DRO concentrations ranged up to 55,000 mg/kg. GRO was found up to 700 mg/kg. Emily Youcha
12/14/2004 Update or Other Action In 1999, an additional boring was drilled to investigate the northern tank cradle vault. DRO up to 2,160 mg/kg was found in the upper 20 ft. DRO concentrations at 40 and 60 feet bgs were below Method Two cleanup levels. Emily Youcha
12/14/2004 Update or Other Action In 2000, two soil surface samples were taken from a surficial stained area near the southern tank cradle vault. DRO concentrations up to 10,000 mg/kg were found. 40 cubic yards of contaminated soil was excavated to 15 feet bgs. Confirmation samples were collected and DRO concentrations at 15 feet bgs remained at 8,300 mg/kg and 4,200 mg/kg. Benzen detection limits exceeded Method Two migration to ground water cleanup levels. Emily Youcha
12/14/2004 Update or Other Action ADEC received a "memorandum for record" from SMDC regarding this site. The site status is currently unresolved because SMDC wants the site to be no further remedial action planned (NFRAP). Administrative controls have been established for this site. Emily Youcha
12/20/2004 Update or Other Action ADEC reviewed a report titled "Comprehensive evaluation of groundwater monitoring program Fort Greely, Alaska". The report discussed the existing monitoring network at Fort Greely and the parameters evaluated in ground-water sampling events. ADEC recommended additional investigation into infiltration and vertical hydraulic gradients. ADEC also recommended additional monitoring wells in the Old Post area and more ground-water monitoring at certain specific sites. Emily Youcha
5/25/2005 Meeting or Teleconference Held Staff conducted a site visit of Fort Greely. Summer fieldwork is underway and includes soil gas surveys, drilling and sampling several deep boreholes, and installation of at least two new monitoring wells. Staff also attended a RAB meeting where the general public recieved an update on site work for this and upcoming seasons. Emily Youcha
8/26/2005 GIS Position Updated Coordinate obtained from RP. Emily Youcha
9/30/2005 Meeting or Teleconference Held Staff particpiated in a Restoration Advisory Board Meeting for Fort Greely on September 28. Emily Youcha
11/28/2006 Update or Other Action Per project manager instructions assigned new file number to site. Wendy Uzzell
5/22/2007 Meeting or Teleconference Held Staff attended Interagency Coordination Meeting in Fairbanks. A summary of the past years and future remedial efforts was provided. Zachary Richter
5/23/2007 Meeting or Teleconference Held ADEC Staff attended a RAB meeting held in Delta Junction. The past years work at Fort Greely was summerized and future work projects were presented. Work at the North and South Tank Farms was highlighted. Zachary Richter
5/23/2007 Update or Other Action The Alaska Department of Environmental Conservation (ADEC) received the Groundwater Monitoring and Data Analysis Work Plan Fort Greely, Alaska on April 27, 2007. This work plan abides by the 2005 Final Work Plan with modifications to the wells and analytical parameters to be monitored particularly the addition of polycyclic aromatic hydrocarbon analysis at monitoring wells MW-12, MW-13, and MW-14. Additionally, the pump type used in sampling the monitoring wells will be changed by replacing the Grundfos Ready Flow pump with a QED Sample Pro 1.75 inch bladder pump and QED MP10 controller, or equivalent. All other sampling methodology will remain the same as the 2005 Final Plan. The final modification to the 2007 Work Plan is the addition of Volatile Organic Analysis/1,2-dibromoethane monitoring at drinking water wells ECP2 and ISFAC at the missile field. An updated list of wells to be monitored, and the parameter for analysis from each well, for upcoming sampling events has been provided to replace Table 5 of the 2005 Final Work Plan. ADEC has completed its review of this document and has found that the Groundwater Monitoring and Data Analysis Work Plan Fort Greely, Alaska for 2007 adequately meets the requirements set forth in 18AAC75.355, and with the addition of the previously agreed upon amendment, this work plan is approved. Zachary Richter
7/2/2007 Update or Other Action The Alaska Department of Environmental Conservation (ADEC) has completed its assessment of the environmental laboratory data and quality assurance requirements as set forth in ADEC Technical Memorandum 06-002 for the Groundwater Monitoring 2006 Analytical Data Report Fort Greely, Alaska, February 2007. The report adequately addresses the requirements set forth by ADEC for both laboratory data packages and Quality Assurance (QA) Summaries, therefore the report is approved. Zachary Richter
3/26/2008 Exposure Tracking Model Ranking Initial ranking with ETM completed. Deborah Williams
11/5/2008 Meeting or Teleconference Held ADEC staff participated in the Restoration Advisory Board meeting for Fort Greely in Delta Junction. During the meeting, Glen Shonkwiler with the United States Army Space and Missile Defense Command presented the fieldwork that was completed during the 2008 field season at Fort Greely. The 2008 fieldwork included remediating the soil in the biocell at the South Tank Farm (STF); conducting further delineation of the subsurface soils at the STF; installing four groundwater monitoring wells in the Old Post area and downgradient of the STF; completing the investigation at the MOGAS fuel line in the Old Post area; conducting additional survey of the Jarvis Creek Munitions Burial site; and conducting additional investigation of the Building 675 vault. He also presented the work that was planned to be completed during 2009. Deborah Williams
10/21/2009 Document, Report, or Work plan Review - other ADEC staff reviewed the document titled Draft 2008 Groundwater Monitoring and Data Analysis Report, Fort Greely, Alaska, dated March 2009. The Fort Greely groundwater monitoring program consists of monitoring wells that were installed during investigation activities on FGA from 1997 to the present. DEC approved a comprehensive groundwater monitoring approach in the 2005 Work Plan. Yearly modifications to the 2005 workplan are incorporated as needed to address environmental program objectives. Monitoring well locations and sampling frequency have been chosen to provide site specific monitoring where necessary, and comprehensive coverage for the old post and main cantonment areas of Fort Greely. Currently, a total of 30 wells are included in the groundwater monitoring program: 11 of these are sampled during the spring and fall on even numbered years, two drinking water wells are sampled quarterly, and 17 monitoring wells are sampled semi–annually. This report summarizes the 2008 groundwater monitoring efforts. A letter detailing staff comments has been provided to the Army. Tana Robert
7/23/2010 Site Characterization Workplan Approved Approved the 2010 IRP work plan. Work at this site includes installing soil borings and test pits to characterize contaminant conditions. Melody Debenham
3/20/2013 Document, Report, or Work plan Review - other Approved the final soil stockpile characterization report documenting sampling of petroleum impacted soils contained in long-term stockpiles and supersacks staged near the landfarm area. The stockpiled soil was generated during remedial actions conducted from 2010 to 2012 at multiple sites at Fort Greely, including BRAC 116. Based on the information presented in the report, and in consultation with the solid waste program, the stockpiled soil is suitable for use as daily cover at the Fort Greely landfill. Melody Debenham
9/4/2013 Document, Report, or Work plan Review - other Approved the final groundwater sampling work plan for Ft. Greely. As part of the multi-year, post-wide groundwater monitoring program, groundwater samples will be collected from 35 wells. Melody Debenham
4/29/2015 Meeting or Teleconference Held Attended Restoration Advisory Board Meeting. Proposed work in 2015 includes post-wide groundwater monitoring, decommissioning unused monitoring wells, developing a Land Use Control and Long Term Maintenance Plan, and completing propose plans/no further action documents for 51 sites. Melody Debenham
8/28/2015 Document, Report, or Work plan Review - other Approved the Final 2014 Groundwater Monitoring and Data Analysis Report documenting the 2014 post-wide groundwater monitoring activities at Fort Greely. Analytical results from four monitoring wells at the BRAC 94 site were above cleanup levels for diesel range organics, gasoline range organics, and/or benzene. Results from one monitoring well at the South Tank Farm site were above the cleanup level for ethylene dibromide. All other results were either non-detect or below the cleanup level, including all supply well results. Melody Debenham
8/28/2015 Document, Report, or Work plan Review - other Approved the Final 2015 Groundwater Monitoring and Data Analysis Work Plan Addendum for long-term post-wide groundwater monitoring at Fort Greely. Groundwater samples will be collected from 25 monitoring wells and 5 supply wells. Melody Debenham
10/13/2015 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 74677 Former Power Generation Bldg. Melody Debenham
11/18/2022 Final Cleanup Report Reviewed ADEC provided comments for the Environmental Summary Report: FGLY-099 MISC UST/AST Sites, Draft (dated September 27, 2022) to the U.S. Army. The report summarized thirteen sites the Army is recommending for site closure. Four of the thirteen sites (Bldg 320, Bldg 340, POL Storage Area and the Old Power Generation Building) ADEC does not concur with the site closure recommendation at this time. ADEC recommended the four sites needing additional site characterization be removed from the Environmental Summary Report. Erica Blake
6/8/2023 Document, Report, or Work plan Review - other DEC provided responses to comments for the Environmental Summary Report: FGLY-099 MISC UST/AST Sites, Draft (dated September 27, 2022) to the U.S. Army. Thirteen sites were evaluated for closure with this summary report. Four sites requested for closure do not meet the closure criteria. Additional site characterization work is needed before the four sites can be closed. Erica Blake

Contaminant Information

Name Level Description Media Comments
DRO > Human Health/Ingestion/Inhalation Soil
GRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil

Control Type

Type Details
Land Use Plan / Maps / Base Master Plan In the October 2004 Draft Decision Document Fact Sheets, administrative controls (ACs)were estblished in order to minimize risk to human health and the environment. The site is included in the post’s Geographic Information System (GIS), a tool used in the Dig Permit process for notifying contractors, workers, and base personnel of the potential for contamination to exist at this site.

Requirements

Description Details
Excavation / Soil Movement Restrictions prevent removal of contaminated material from the site to off-base locations or to environmentally sensitive areas 5 year reviews
When Contaminated Soil is Accessible, Remediation Should Occur If future land disturbance activities at the site encounter contamination, the contaminated material encountered will be properly remediated or disposed of in accordance with applicable regulations. 5 year reviews

There are no documents for this site report.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close