Action Date |
Action |
Description |
DEC Staff |
8/3/2000 |
Update or Other Action |
Site visit with Jim Sewell of Shell Exploration, Deborah Heebner of ADNR, Herman Griese of ADF&G, Gar Carothers, and Robb Crotty of CH2MHILL, Jay McKendrick of Lazy Mountain Research and Bo Douglas. |
Scott Pexton |
1/31/2001 |
Update or Other Action |
Received Draft Investigation Report for Kustatan River Number 1 Inactive Reserve Pit and Drill Site, prepared by CH2MHILL. |
Scott Pexton |
2/6/2001 |
Update or Other Action |
Letter sent from Judd Peterson of the ADEC Solid Waste Program to Jim Sewell of Shell Exploration regarding the draft Investigation report and indicating transfer of oversight of assessment and cleanup of diesel contamination to the Contaminated Sites Remediation Program. |
Scott Pexton |
2/14/2001 |
Meeting or Teleconference Held |
Attended meeting at CH2MHILL offices in Anchorage with Colleen Burgh of CH2MHILL, Jim Sewell of Shell Exploration (via teleconference), Joe Meehan and John Westlund of ADF&G, and Deborah Heebner of ADNR to discuss the draft report and plans to revegetate the gravel pad later this spring. |
Scott Pexton |
2/26/2001 |
Site Added to Database |
DRO contamination. |
Scott Pexton |
2/27/2001 |
Site Ranked Using the AHRM |
Site ranked based on information provided in the Draft Investigation Report prepared by CH2MHILL. |
Scott Pexton |
2/27/2001 |
Update or Other Action |
Letter sent to Jim Sewell of Shell Exploration with comments on the draft Investigation report. Letter also included Cost recovery Notification informing Shell of the state's intent to recover oversite costs. |
Scott Pexton |
5/7/2001 |
Update or Other Action |
Received final Investigation Report for Kustatan River Number 1 Inactive Reserve Pit and Drill Site, prepared for Shell Exploration and Production Company by CH2MHILL. Also, received a memorandum from CH2MHILL with responses to ADEC comments on the draft report. |
Scott Pexton |
6/15/2001 |
Site Characterization Workplan Approved |
Approved site characterization and re-vegetation work plan. Sediment sampling in the fall will be dependent on analytical results from this sampling event. |
Donald Seagren |
8/20/2001 |
Update or Other Action |
Conference call with Colleen Burgh and Rob Crotty regarding preliminary sampling results from summer sampling event. Discussed any additional needs for September re-vegetation inspection. Will meet with other agencies this winter to decide course of action for contaminated soils and surface water. |
Donald Seagren |
3/20/2003 |
Update or Other Action |
Talked to Rob Crotty, CH2MHill. Have not received report. He will contact Jim Sewell, Shell, to see what happened and get copy of report released to me. |
Donald Seagren |
8/11/2003 |
Update or Other Action |
Reviewed 2002 sampling report. Sent letter to Jim Sewell, requesting missing reports from previous approved work plans and background information referenced, but missing from file. |
Donald Seagren |
11/13/2003 |
Meeting or Teleconference Held |
Met with Crotty/Acomb to discuss site data, risk based closure/ nfa versus closure, no LTM, no IC with ADNR/ADFG concurrence. |
Donald Seagren |
3/24/2004 |
Update or Other Action |
File number assigned and entered into the Fileroom DB and CS DB. |
Alyce Hughey |
9/20/2004 |
Institutional Control Record Established |
Redoubt Bay Critical Habitat area regulations will act as IC to prevent development and limit access. |
Donald Seagren |
9/20/2004 |
Conditional Closure Approved |
NFRAP decision based on review of data indicating remaining weathered DRO contaminant plume is not migrating. Natural attenuation will address remaining contamination. |
Donald Seagren |
9/8/2005 |
GIS Position Updated |
Using Figure 1 from an Investigation Report for Kustatan River No. 1 Inactive Reserve Pit and Drill Site, from CH2MHILL, dated January 2001, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes USGS Topo Maps 1:63K, TopoZone Pro Street Maps, Black and White Aerial Photo, on a Medium Size Map, View Scale 1:25,000, Coordinate Datum NAD83. Moderate to high degree of confidence in accuracy of location. |
Alyce Hughey |
6/12/2008 |
Update or Other Action |
Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. |
Alyce Hughey |
11/10/2014 |
Update or Other Action |
Staff changed from Paul Horwath to IC Unit. |
Kristin Thompson |
9/4/2015 |
Institutional Control Compliance Review |
IC compliance review conducted. The area of remaining contamination is in a critical habitat area. Schedule to send a letter reminding the parties involved of this. |
Evonne Reese |
2/19/2016 |
Institutional Control Update |
Verified with DNR Oil & Gas that Shell Oil remains the lease holder. Schedule to send an IC reminder letter. |
Evonne Reese |
2/25/2016 |
Institutional Control Update |
An IC reminder letter was issued to the responsible party (Shell Oil), and a copy sent to the other involved parties (ADNR and ADF&G). |
Kristin Thompson |
3/30/2017 |
Institutional Control Compliance Review |
IC compliance review conducted. Closure/IC Details updated. |
Kristin Thompson |
5/7/2019 |
Institutional Control Update |
An Institutional Controls reminder letter mailed to the responsible party on this date. |
Mossy Mead |
6/4/2024 |
Institutional Control Compliance Review |
IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in three years’ time. |
Gaige Robinson |