Action Date |
Action |
Description |
DEC Staff |
1/21/1992 |
Site Added to Database |
This site is included in the state EPA Eielson FFA 100.38.011. |
Former Staff |
12/3/1992 |
Update or Other Action |
Received documents from EAFB on OU 3, 4 and 5. These documents are the quality-assured field sampling data. Markey is now reviewing them. Item # 35 and 36, from the CS/DOD bookcase. |
Rielle Markey |
2/23/1993 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). Sent PRP-CS database Notification Letter to RP requesting update and more environmental information concerning contaminated site. Department of the Air Force responded with update of requested site information on 3-17-93. |
Jeff Peterson |
7/15/1993 |
Update or Other Action |
(Old R:Base Action Code = DD - Decision Document (CERCLIS)). Letter sent in response to Draft RI document. Major contaminant of concern is lead in GW. |
Rielle Markey |
8/12/1993 |
Meeting or Teleconference Held |
Meeting in Seattle to discuss RI comments. Levels of lead groundwater were resampled in April to determine the extent of lead contamination. This site will proceed with an FS. We will consider limited action and institutional controls. |
Rielle Markey |
10/18/1993 |
Site Ranked Using the AHRM |
Initial ranking. |
Former Staff |
9/30/1995 |
Update or Other Action |
Eielson AFB Operable Units 3, 4 and 5 ROD includes 20 source areas that have been combined because of commonalities in contamination. These source areas are DP44, WP45, SS57, SS56, SS61, DP25, ST27, WP33, SS35, SS36, SS37, SS39, SS63, ST58, SS64, LF02, LF03, FT09, LF04, and LF06. |
Clint Adler |
9/30/1995 |
Update or Other Action |
(Old R:Base Action Code = NFA - No Further Action Required (CERCLA)). These 10 Eielson AFB OU 3, 4 and 5 source areas (ST27, WP33, SS36, SS37, SS39, SS63, SS64, LF02, and LF06) will receive no further remedial action under CERCLA because they present little risk to human health and the environment. This determination was based on a remedial investigation/baseline risk assessment and a site-wide draft ecological risk assessment. Although no further action is required, the groundwater at these source areas will continue to be monitored as part of the Site-Wide Program to confirm the results of the Remedial Investigation. |
Clint Adler |
1/16/1996 |
Site Closure Approved |
NFA under CERCLA. |
Clint Adler |
2/16/1996 |
Update or Other Action |
(Old R:Base Action Code = RA - Remedial Action). Received Remedial Action Workplan. |
Clint Adler |
9/24/1996 |
Record of Decision |
Final Site-Wide Record of Decision, September 1, 1996; two documents received. |
Rielle Markey |
3/24/1997 |
Update or Other Action |
Site updated by Shannon and Wilson, based on the Air Force Relative Risk Evaluation Worksheet dated 10/19/95. |
S&W |
2/10/2003 |
Site Number Identifier Changed |
Changed Workplan to X9 from X1 to reflect presence of hazardous substances above cleanup levels. |
Former Staff |
8/26/2004 |
GIS Position Updated |
Position acquired using "Base MW Map 2004" CAD drawing from EIAFB georeferenced to QuickBird Satellite imagery, NAD27. |
Torsten Ernst |
7/6/2006 |
Update or Other Action |
ADEC agreed to decrease sampling of the North Boundary Wells from annual sampling to biennial. Upcoming measurements will be summer 2007, 2009, 2011, etc. Concentrations of VOCs, SVOCs, and metals in the sentinel wells have been monitored annually since 1992 and there has been no detection of contamination. |
Emily Youcha |
10/25/2012 |
Site Reopened |
Site was previously closed under CERCLA but not under State of Alaska DEC regulations (see entry (1/16/1996). Site reopen action to reassign site to "active" status. |
Hannah Harrison |
10/25/2012 |
Offsite Soil or Groundwater Disposal Approved |
Approval of soil transport form for contract titled "Repair Pipe Supports at E-11 Tank Farm". Material classified as gravel, sand, silt sourced from historil spill found during excavation for verticle support member upgrades. Location listed as Cell #1, Eielson Soil Stockpile Location in an amount of 30 cubic yards. |
Hannah Harrison |
3/18/2014 |
Document, Report, or Work plan Review - other |
2012-Final installation-wide monitoring program report received June, 24 2013. During the 2012 season no new monitoring wells were installed. Five of the six existing wells were sampled, benzene (1 well) and lead (1 well) were the only COC (Contaminant of concern) that exceeded the FRG (final remediation goal). There was no detected COPC (Contaminant of potential concern) t in levels that exceeded current MCL (Maximum contaminant level) or ADEC groundwater levels. A comparison of the data shows the extent of both the benzene and lead contamination in groundwater has decreased significantly between 1993 and 2012. Due to only one well contaminated with each contaminant, the extent of the plume cannot be determined. |
Anna Iverson |
5/1/2014 |
Document, Report, or Work plan Review - other |
2013-Draft installation-wide monitoring program (IWMP) report received March, 26 2014. During 2013, 5 (DP25) and 3 (ST27) IWMP wells were sampled in the spring and 8 (DP25) and 5 (ST27) IWMP wells, were sampled in the fall. Benzene (3 wells fall) was the only COC that exceeded the ROD FRGs. GRO (1 well fall) was the only COPC that exceeded current MCL (Maximum contaminant level) or ADEC groundwater levels. Concentrations for benzene appear to have a decreasing trend. The single GRO exceedance was co-located with a benzene sample, no trend could be observed as petroleum hydrocarbon data at the well prior to 2012 is available. |
Anna Iverson |
3/17/2015 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area, information based off railroad update report. |
Anna Iverson |
5/27/2015 |
Site Visit |
Conducted site visit with EPA, DEC and Air Force personal. |
Anna Iverson |
9/22/2015 |
CERCLA RI Plan Approved |
Joint approval issued by EPA and DEC for the final "Remedial Investigation / Feasibility Study Management Plan For Operable Units 3, 4, and 5 Source Areas, Eielson Performance-Based Remediation, Eielson Air Force Base, Alaska" dated September 2015 (OU 3, 4 & 5 RI/FS MP). The OU 3, 4 & 5 RI/FS MP describes planned remedial investigations at 23 contaminated sites at Eielson Air Force Base, including ST27. |
Melinda Brunner |
9/22/2015 |
CERCLA RI Plan Approved |
DEC and EPA jointly approved the "2015 Annual Field Sampling Plan, Eielson Performance-Based Remediation, Eielson Air Force Base, Alaska" dated September 2015 (FSP). The FSP describes remedial investigations planned for 2015 at 21 contaminated sites at Eielson Air Force Base, including ST27. The FSP is meant to be used in conjunction with the appropriate remedial investigation/feasibility study (RI/FS) management plan(i.e. OU 3,4,& 5) and the Programmatic Quality Assurance Project Plan. |
Melinda Brunner |
7/22/2016 |
Institutional Control Compliance Review |
DEC and EPA Approved the Final 2016 Installation-Wide Monitoring Program Quality Assurance Project Plan Addendum No. 5. The IWMP QAPP Add. 5 updates the 2012 IWMP QAPP for the 2016 field season. Changes and additions to the existing network of monitoring wells were described. |
Monte Garroutte |
4/25/2017 |
Update or Other Action |
DEC reviewed and provided comments on the Draft Programmatic Quality Assurance Project Plan, Addendum No. 2, Eielson Air Force Base, Alaska (March, 2017). |
John O'Brien |
7/18/2017 |
Document, Report, or Work plan Review - other |
DEC reviewed and provided comments on the Installation-Wide Monitoring Program, 2016 Groundwater Monitoring Report, Eielson Air Force Base, Alaska (June, 2017). |
John O'Brien |
3/9/2018 |
Document, Report, or Work plan Review - other |
DEC issued comments on the Draft Site Characterization Report I Source Areas ST011, SD021, SD022, SD024, DP025, ST027, SS030, ST058, SO065, SO069, SO070, SO071, SO073, SO075, SS078, SS084, SO504, TU506, MY512, and MY518 dated February 2018. |
Bri Clark |
6/25/2018 |
Document, Report, or Work plan Review - other |
DEC issued comments on the Draft Site Characterization Report I Source Areas ST011, SD021, SD022, SD023, SD024, DP025, ST027, SS030, ST058, SO065, SO069, SO070, SO071, SO073, SO075, SS078, SS084, SO504, TU506, MY512, and MY518, Eielson Air Force Base, Alaska, dated February 2018. |
Bri Clark |
8/6/2018 |
CERCLA ROD Periodic Review |
DEC evaluated "Fifth Five-Year Review Report for Eielson Air Force Base, Alaska" draft dated April 2018 and issued comments. |
Bri Clark |
8/9/2018 |
Document, Report, or Work plan Review - other |
DEC reviewed and provided a second round of comments on Explanation of Significant Differences (ESD) to the Records of Decisions for Eielson Air Force Base Operable Units, OU1, OU2, OU3,4,5, and OU6, dated November 2017. |
Bri Clark |
8/10/2018 |
Institutional Control Periodic Reporting |
DEC and EPA reviewed the "Installation-Wide Monitoring Program 2017 Groundwater Monitoring Program" for Eielson Air Force Base, Alaska dated March 2018 and issued comments. |
Bri Clark |
12/19/2018 |
Document, Report, or Work plan Review - other |
DEC reviewed and provided comments on the "Draft Installation-Wide Monitoring Program Quality Assurance Project Plan, Addendum No. 8, Eielson Performance-Based Remediation, Eielson Air Force Base, Alaska," dated November 2018. |
Bri Clark |
2/13/2019 |
Institutional Control Periodic Reporting |
DEC and EPA approved the Installation-Wide Monitoring Program 2017 Groundwater Monitoring Report, Eielson Air Force Base, Alaska, dated January 2019. |
Bri Clark |
3/4/2019 |
Institutional Control Periodic Reporting |
DEC issued comments on the Draft Installation-Wide Monitoring Program 2018 Groundwater Monitoring Report, Eielson Air Force Base, Alaska, dated January 2019. This report describes the groundwater monitoring activities conducted installation-wide in 2018. |
Bri Clark |
8/21/2019 |
Site Characterization Report Approved |
DEC Approval for the Final Site Characterization Report 1, Source areas ST011, SD021, SD022, SD023, SD024, DP025, ST027, SS030, ST058, SO065, SO069, SO070, SO071, SO073, SO075, SS078, SS084, SO504, TU506, MY512, and MY518, Eielson Performance Based Remediation, Eielson AFB, Alaska, May 2019 |
Sara Marshall |
2/23/2021 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 71367 auto-generated pm edit Eielson AFB (OU-4) (ST27) E-11. |
Cascade Galasso-Irish |
9/20/2022 |
Document, Report, or Work plan Review - other |
The U.S. Environmental Protection Agency (EPA) and Alaska Department of Environmental Conservation (DEC) approved the Final 2021 Institutional Controls/Land Use Controls Annual Report, Eielson Air Force Base, Alaska (dated September 2022). The report provides inspection findings and reviews individual ICs established by the record of decision (ROD) documents for Installation Restoration Program source areas with enforceable ICs, as well as other contaminated sites currently with LUCs in effect. |
Dennis Shepard |
11/1/2022 |
Document, Report, or Work plan Review - other |
DEC provided review comments for the Draft Supplemental Remedial Investigation (RI) Work Plan (WP) Addendum, Eielson Air Force Base, Alaska, September 2022. The Supplemental RI Work Plan Addendum is prepared with the intention of providing a detailed approach to support the objectives of characterizing contamination in general accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and applicable state laws at 29 source areas within Operable Unit (OU) 1, OU2, OU4, and OU6 at Eielson AFB. This supplemental work plan addendum complements the primary planning documents Final Supplemental Remedial Investigation Work Plan Eielson Air Force Base, Alaska (September 2022) (Gaps 1 Work Plan) and the Risk Assessment Work Plan (USAF 2016). |
Dennis Shepard |