Site Report: Sheldon Jackson College Stockpiles

Site Name: Sheldon Jackson College Stockpiles
Address: 801 Lincoln Street, Sitka, AK 99835
File Number: 1525.38.037
Hazard ID: 3989
Status: Cleanup Complete - Institutional Controls
Staff: IC Unit, 9074655229 dec.icunit@alaska.gov
Latitude: 57.051886
Longitude: -135.324129
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Approximately 2,000 cubic yards of petroleum-contaminated soil excavated during utility upgrades stockpiled on liners in several locations around the campus. This project includes the Sheldon Jackson Penstock stockpile transferred from PERP 2/26/03.

Action Information

Action Date Action Description DEC Staff
6/2/2004 Cleanup Level(s) Approved Method 2 migration to groundwater Bill Janes
6/2/2004 Cleanup Plan Approved Soils from the stockpiles will be incapsulated within an impermeable liner and capped with asphalt for a new parking lot. Iinstitutional controls will be required for long term management. Bill Janes
6/2/2004 Site Added to Database Petroleum contamination. Bruce Wanstall
6/2/2004 Site Ranked Using the AHRM Initial ranking. Bill Janes
8/24/2004 Meeting or Teleconference Held On-site with Fred Knowles, SJ College. Parking lot is finished. Photos are in site file in G drive. Bill Janes
4/10/2006 Update or Other Action David Dobler is the SJ Acting President. Jim Clare is in the process of finishing up the statistics for the final report. Bill Janes
8/15/2006 Update or Other Action Final remedial action report submitted to DEC. Bill Janes
10/11/2006 Conditional Closure Approved The estimated average DRO concentration in the encapsulated soil is between the migration to groundwater cleanup level (230 mg/kg DRO) and the human health ingestion cleanup level (8,250 mg/kg DRO). Formal land or activity use controls between these regulatory cleanup levels is not required. However, this determination is subject to the following conditions: 1. The Juneau office of DEC’s Contaminated Sites Program must be notified immediately if there is a planned change in land use, or if the parking lot is reconfigured or removed. 2. Sheldon Jackson College is required to submit a short letter and photos documenting the condition of the paved parking lot every three years, on or before the anniversary date of this letter. The first report is due one year from the date of this letter, which coincides to approximately three years from the project completion date. 3. Sheldon Jackson College will note the exact location of the encapsulated soil on its campus geographic information system. A summary of the encapsulation specifications and the total volume of encapsulated soil will be noted in any applicable campus land use or facility management plans. Sheldon Jackson College will complete this condition within one year of the date of this letter and provide written verification to DEC. Bill Janes
10/11/2006 Institutional Control Record Established Informational posting to database only. Bill Janes
1/18/2012 Institutional Control Compliance Review Received photos from the RP of the paved parking lot that is the engineering control IC requirement for this site. The ticker system has been updated to check on the condition of the parking lot once again in three years time. Evonne Reese
1/18/2012 Update or Other Action In 2011 The Sheldon Jackson Collect board of trusties bequeathed the campus land and buildings to Alaska Arts Southeast. Evonne Reese
4/3/2014 Update or Other Action GIS coordinates revised to reflect the center of final disposal location of the encapsulated soil beneath the parking lot. Bill Janes
3/18/2015 Institutional Control Update An IC reminder letter was issued to the responsible party on this date. Kristin Thompson
4/7/2015 Institutional Control Update Responsible party responded to ADEC's IC reminder letter on this date. Memo and photos indicate that the parking lot adjacent to North Pacific Hall shows no signs of physical change or deterioration. Site use has remained the same since establishment of institutional controls and there are no plans for changes in land use. Kristin Thompson
3/23/2016 Institutional Control Update I was contacted by the City of Sitka Engineering Dept. regarding the project happening in near future near the parking lot that has the encapsulated soil underneath it. There is an additional aspect to this project that involves moving a catch basin and also re-routing the runoff from the parking lot. This project should not affect the encapsulated soil beneath the parking lot. I provided the Right of Way Guidance document was along with the 2006 final report and the soil encapsulation details from 2004 for some background to the original remediation project. Evonne Reese
10/9/2018 Institutional Control Update An ICs reminder letter was issued to the responsible party/landowner on this date with request for documentation regarding the nature and current use of the Sheldon Jackson College stockpiles property and a short letter with photos documenting the current condition of the paved parking lot. As of 4/10/2019 no response has been received. Mossy Mead
4/10/2019 Institutional Control Update Another ICs reminder letter was issued to the responsible party/landowner on this date with request for documentation regarding the nature and current use of the Sheldon Jackson College stockpiles property and a short letter with photos documenting the current condition of the paved parking lot. Mossy Mead
7/18/2019 Institutional Control Compliance Review Compliance response and photo documentation received from the landowner on this date. No changes to land use have occurred. Mossy Mead
3/16/2023 Institutional Control Compliance Review An IC compliance review was conducted on this date. A reminder letter was issued to the Alaska Arts Southeast contact requesting current photos of the paved parking lot which covers the contained stockpiles of contaminated soil Evonne Reese
3/20/2023 Institutional Control Periodic Reporting Received the requested current photos of the paved parking lots and the confirmation that the use has not changed and the paving is still in place providing a protective barrier. Evonne Reese

Contaminant Information

Name Level Description Media Comments
DRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil

Control Type

Type Details
CS Database Notation And Letter To Landowner/RP

Requirements

Description Details
Maintenance / Inspection Of Engineering Controls Soil encapsulated beneath a paved parking lot in an impermeable liner. Letter/photos documenting condition of parking lot due to DEC every three years. First report due 10/11/07 to correspond with three years since construction completion.
When Contaminated Soil is Accessible, Remediation Should Occur
Advance approval required to transport soil or groundwater off-site.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close