3/31/2006 |
GIS Position Updated |
Latitude and longitude determined using ArcGIS and maps in file. |
Mitzi Read |
3/31/2006 |
Site Ranked Using the AHRM |
Preliminary ranking based on information in site file. AHRM score was not calculated due to number of unknown values. |
Mitzi Read |
3/31/2006 |
Spill Transferred from Prevention Preparedness and Response Program |
PERP Spill #04389912001, PERP File #410.02.031. |
Mitzi Read |
3/31/2006 |
Site Added to Database |
Site added to the database. |
Mitzi Read |
6/6/2006 |
Potentially Responsible Party/State Interest Letter |
Sent PRP letter to landowner NANA Corporation requesting release investigation of site. |
Shannon Oelkers |
9/12/2006 |
Site Characterization Workplan Approved |
Received release investigation plan from Travis/Peterson. Approved plan for removal of one UST and the characterization of possible DRO plume from second tank located within building footprint. |
Shannon Oelkers |
12/12/2006 |
Update or Other Action |
Received site characterization report from Travis/Peterson. Soil and suprapermafrost groundwater impacted. DRO detected in groundwater at 15.4 mg/L, DRO in soil up to 1580 mg/kg. Analytical samples show strong evidence of a leak or spill from both tanks. |
Shannon Oelkers |
4/11/2007 |
Exposure Tracking Model Ranking |
Intitial Ranking Complete for Source Area: 78188 (Autogenerated Action) |
|
4/12/2007 |
Exposure Tracking Model Ranking |
Intitial Ranking Complete for Source Area: 78189 (Autogenerated Action) |
|
7/27/2007 |
Update or Other Action |
Site transferred from Oelkers to Farris. |
Shannon Oelkers |
6/4/2008 |
Update or Other Action |
DRO is 36.6 mg/L in gw. May be migrating off-site. BTEX and PAHs not sampled in GW. Sent letter to TPECI asking for surface water analysis. |
Neal Everson |
6/11/2008 |
Update or Other Action |
Added Lat-Lon after Kotzebue visit. |
Tamara Cardona-Marek |
2/25/2009 |
Update or Other Action |
Responsible party requested that work be delayed until 2011 when hotel will be demolished. DEC approved request for soil characterization and removal until 2011, but groundwater characterization should be addressed sooner absent a compelling need. Work can be done concurrently with Hanson Trading Post Site. |
Neal Everson |
2/16/2010 |
Update or Other Action |
Changed DEC project manager to James Fish. |
Janice Wiegers |
1/23/2012 |
Update or Other Action |
Draft Work Plan received for tank/soils excavation |
Jim Fish |
8/10/2012 |
Site Characterization Workplan Approved |
Work plan for soil excavation and stockpiling at Landfill approved. If soils remian stockpiled for greater than 180 days, a stockpile management plan will be required. If soils not accepted as lanfill cover by Solid Waste Program or landfill,a soil remediation work plan will be required. |
Jim Fish |
10/5/2012 |
Update or Other Action |
Soil disposal (to landfill) request letter from consultant to DEC SOlid Waste receieved. |
Jim Fish |
12/21/2012 |
Update or Other Action |
Recieved site characterization and remediation report from consultant |
Jim Fish |
10/14/2013 |
Update or Other Action |
Received additional information about the site from TPECI (historic use as cannery) and confirmation that no stockpiles of contaminated soils remain on site. |
Jim Fish |
10/28/2013 |
Document, Report, or Work plan Review - other |
Reviewed tank excavation report and sent RP (NANA Corp) letter asking for groundwater assessment and evaluation of neighboring lot (New Nullagvik Hotel). |
Jim Fish |
3/5/2018 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 78188 HOT #1. |
Laura Jacobs |
5/16/2018 |
Meeting or Teleconference Held |
DEC staff were contacted by RP, Nana Management Services, asking about continued billing. Was not aware of remaining issues with site. DEC forwarded the most recent letter from DEC that outlines what remains to be completed before site closure can occur. |
Laura Jacobs |
2/22/2019 |
Meeting or Teleconference Held |
Meeting held with DEC staff and NANA Development Corporation to discuss site history, remaining contamination onsite, and requirements for the site moving forward. NANA Development Corporation indicated they would retain an environmental consultant to prepare a work plan. |
Megan Roberts |
2/22/2019 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 78188 HOT #1. |
Megan Roberts |
5/15/2019 |
Document, Report, or Work plan Review - other |
DEC received a work plan addressing site characterization. |
Megan Roberts |
5/30/2019 |
Workplan Requested |
DEC provided work plan revision comments and requested that a revised work plan be submitted. |
Megan Roberts |
7/11/2019 |
Meeting or Teleconference Held |
Meeting held between DEC Project Manager and NANA Develp Corp to discuss work plan revision intent and it was indicated a response to the work plan revision comments would be submitted soon followed by a teleconference to discuss sampling points with DEC and environmental consultants. |
Megan Roberts |
7/16/2019 |
Meeting or Teleconference Held |
Meeting held between DEC staff, NANA Development Corp., and Kuna Engineering to discuss work plan revisions. Sampling efforts will be focused on identifying and sampling in the location where former tanks resided. Additional soil borings will be placed at the north-western side of the new Nullagvik Hotel. Groundwater sampling will be proposed here to investigate the groundwater to surface water connection. The boiler house investigation will remain as proposed in the initial work plan. DEC indicated lead and lead scavengers analysis should be included. |
Megan Roberts |
8/16/2019 |
Document, Report, or Work plan Review - other |
ADEC received revised work plan from Kuna engineering on this date. ADEC will review and respond. This work plan is join with the Hansen Trading Post site (ADEC file no 410.38.022). |
Erin Gleason |
11/6/2019 |
Document, Report, or Work plan Review - other |
ADEC has reviewed the revised work plan and requests further changes. A letter was sent to NANA on this date request further work plan revisions and documentation of Kuna engineering's impartial third party status. ADEC understands that Kuna Engineering may be a subsidiary of NANA. Revised work plan due November 29th. |
Erin Gleason |
3/19/2020 |
Update or Other Action |
Received request for waiver for impartial third party of the QEP letter from NANA on2/26/20.ADEC has granted the waiver. |
Erin Gleason |
3/19/2020 |
Update or Other Action |
ADEC received revised work plan from NANA on 2/26/2020. Upon review, ADEC finds that further revisions are needed. Letter sent to NANA on this date requesting revised work plan by April 30th, 2020. |
Erin Gleason |
5/15/2020 |
Site Characterization Workplan Approved |
ADEC received revised work plan on this date. The work plan is now approved. Schedule for field work to be determined based on pandemic travel restrictions. |
Erin Gleason |
3/5/2021 |
Document, Report, or Work plan Review - other |
Received characterization report on 2/1/21. ADEC will has reviewed report and requests revisions. Letter send on this date. |
Erin Gleason |
3/15/2021 |
Update or Other Action |
Received response to comments from Kuna Engineer. ADEC will review and respond. |
Erin Gleason |
5/17/2021 |
Site Characterization Report Approved |
Received revised report from Kuna Engineering on behalf of NANA on May 10th, 2021. ADEC has review the report and it is now approved. ADEC has review the file and determined it is not available for closure. The extent of groundwater contamination needs to be determined in the vicinity of MW1 before it can be eligible for closure. |
Erin Gleason |
6/2/2021 |
Update or Other Action |
Received TDD for soil cuttings. |
Naomi Mason |
7/13/2022 |
Workplan Requested |
Work plan request letter sent to NANA Native Corporation on this date for this site in conjunction with the Hanson Trading Company UHOT (Haz ID 4504). |
Naomi Mason |
7/21/2023 |
Workplan Requested |
Data gap analysis/work plan request letter sent to NANA on this date for both the Nullagvik Hotel and Hanson Trading Company. |
Naomi Mason |
8/23/2023 |
Site Visit |
ADEC staff visited site on this date. No obvious signs of contamination. Two heating oil tanks (10,000-gallon and approximately 15,000-gallon) are present on the southeast side of the building. Building is on post and pad foundation and appears to be in very good condition and well-maintained. |