Action Date |
Action |
Description |
DEC Staff |
1/1/1964 |
Update or Other Action |
Alaskan Air Command Master Plan base map with update notes of January 1, 1966 and January 1, 1970, and hand-drawn edits reportedly from 1971. |
Former Staff |
1/1/1969 |
Update or Other Action |
Corps of Engineers Boring Logs, Shemya AFB, Alaska, AP 526 - AP884, January 1969 - December 82. |
Former Staff |
1/1/1976 |
Update or Other Action |
Corps of Engineers Boring Logs, Shemya AFB, Alaska, DH 885 - DH 1105, January 1976 - May 85. |
Former Staff |
11/1/1982 |
Update or Other Action |
Recoverable, Reclaimable and Waste Petroleum Product Management Plan 19-14. |
Former Staff |
6/15/1984 |
Update or Other Action |
(Undated) Shemya ACE Projects, 1984 to date. Internal Report. Prepared by 5099th CEOS. |
Former Staff |
9/1/1984 |
Preliminary Assessment Approved |
Installation Restoration Program, Phase I Records Search, 5073rd Air Base Group, Shemya Air Force Base, Alaska (dated September 1984) prepared by JRB Associates. |
Former Staff |
2/15/1985 |
Update or Other Action |
Management Action Plan, Eareckson Air Station, Alaska (formerly Shemya AFB, Alaska). Prepared by Jacobs Engineering Group. |
Former Staff |
5/1/1985 |
Update or Other Action |
Corps of Engineers Boring Logs, Shemya AFB, Alaska, AP 1105 - AP 1463, May 1985 - November 1987. |
Former Staff |
11/22/1985 |
Update or Other Action |
CH2M Hill trip report dated 1985. |
Former Staff |
12/30/1985 |
Interim Removal Action Approved |
(Undated) Alaska Cleanup Effort, Shemya History 1975 - 1985. Internal Report. Prepared by 5099th CEOS. |
Former Staff |
6/1/1986 |
Update or Other Action |
Phase II - Task I Presurvey Report, Shemya Air Force Base and King Salmon Air Force Station. |
Former Staff |
12/2/1986 |
Notice of Violation |
Notice of Violation letter submitted to Air Force by EPA (Charles Findley, Director of Hazardous Waste Division). A shipment of "salvage materials" violated hazardous waste laws and regulations promulgated under RCRA. |
Former Staff |
9/25/1987 |
Update or Other Action |
Shemya Field Trip Notes, September 15-19, 1987. Prepared by CH2M Hill. |
Former Staff |
7/29/1988 |
Update or Other Action |
Installation Restoration Program, Stage I Workplan, Shemya Air Force Base, Alaska. Prepared by CH2M Hill. |
Former Staff |
8/15/1988 |
Update or Other Action |
Environmental Sampling Data Sheet. |
Former Staff |
8/29/1988 |
Update or Other Action |
Comprehensive Plan, Shemya Air Force Base. Prepared by TRA/FARR and Dowl Engineers. |
Former Staff |
9/2/1988 |
Update or Other Action |
Pollution Incident Report. |
Former Staff |
9/9/1988 |
Update or Other Action |
Installation Restoration Program, Stage I Quality Assurance Project Plan, Shemya Air Force Base, Alaska. |
Former Staff |
10/1/1988 |
Update or Other Action |
Evaluation of Lake at Shemya Air Force Base, Alaska. Technical memorandum prepared by Robert Binovi summarizing an evaluation of water samples collected from lakes at Shemya Island. |
Former Staff |
10/1/1988 |
Update or Other Action |
Corps of Engineers Boring Logs, Shemya Air Force Base, Alaska, AP1464 - AP1765, October 1988 - April 1991. |
Former Staff |
10/5/1988 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). CH2M Hill submits final work plans, QA plans and health and safety plans for Stage I IRP |
Former Staff |
10/17/1988 |
Update or Other Action |
Trip Report, Shemya Air Force Base, Alaska. Memorandum by Clare Jaeger (COE) summarizing the contamination discovered during soil and water sampling on October 6, 1988. |
Former Staff |
10/17/1988 |
Update or Other Action |
Trip Report, Shemya Air Force Base, Alaska. Memorandum by Clare Jaeger (COE) summarizing the contamination discovered during soil and water sampling on October 6, 1988. |
Former Staff |
2/8/1989 |
Update or Other Action |
Water System, Phase 1B, Surface Water Quality of Several Lakes, Shemya AFB, Alaska Technical memorandum prepared by Thomas Delwyn summarizing a surface water quality investigation conducted at Shemya in October 1988. |
Former Staff |
6/15/1989 |
Update or Other Action |
1988 U.S. Army COE discovery of additional POL Contamination. |
Former Staff |
7/6/1989 |
Update or Other Action |
POL Contamination Investigations at Shemya Air Force Base, Alaska, 25 April through 3 June 1989. Memorandum by Thomas Delwyn (COE). |
Former Staff |
7/20/1989 |
Update or Other Action |
ADAL Aircraft Equipment Shop, POL Contamination Investigations at Shemya AFB, AK. |
Former Staff |
8/23/1989 |
Update or Other Action |
POL OPS/Vehicle Storage, POL Contamination Investigation at Shemya Air Force Base, Alaska. Memorandum by Thomas Delwyn )COE) summarizing an investigation conducted to determine the amount of POL contamination of soil and water at the site for the new POL OPS office, Vehicle Storage Building and gas station. |
Former Staff |
8/28/1989 |
Update or Other Action |
Communication Facility, POL Contamination Investigations at Shemya Air Force Base, Alaska. Memorandum by Thomas Delwyn (COE) summarizing an investigation conducted in May 1989 to obtain data on the extent of POL contamination at the site of the new communication facility and to obtain design information for Worker Safety and Dewatering during construction. |
Former Staff |
9/11/1989 |
Update or Other Action |
Vehicle Maintenance Facility, POL Contamination Investigations at Shemya AFB, Alaska. |
Former Staff |
9/15/1989 |
Update or Other Action |
Preliminary Assessment / Site Investigation report completed. |
Former Staff |
10/5/1989 |
Update or Other Action |
Notice of Noncompliance letter to Air Force Shemya Contractors by EPA (Gil Haselberger, Chief of Toxic Substances Section) regarding a June 1989 inspection and violations with TSCA. |
Former Staff |
10/6/1989 |
Update or Other Action |
ADAL BCE Maintenance Facility, POL Contamination Investigations at Shemya AFB, AK; also BCE Maintenance Shop, POL Contamination Investigation at Shemya AFB, Alaska (dated 4-7-??) listed in Information Repository / Administrative Record Materials. |
Former Staff |
6/12/1990 |
Update or Other Action |
Federal Facility Compliance Agreement between the Air Force (signed by Charles Crabb, Jr., 5073d ABG/CC) and EPA (signed by Charles Findley, Director of Hazardous Waste Division) on March 15, 1991 regarding noncompliance with RCRA. RCRA Docket Number 1090-04-02-3008. |
Former Staff |
6/13/1990 |
Update or Other Action |
Notice of Noncompliance letter to 5073 ABG/CC Air Force by EPA (Charles Findley, Director of Hazardous Waste Division) regarding RCRA violations; RCRA Docket Number 1090-04-02-3008. The attachment included a Federal Facilities Compliance Agreement with a Notice of Noncompliance, a Compliance Schedule, and a Notice of Necessity for Conference. The Air Force response letter (signed by Colonel Charles Crabb, Jr., Commander) is dated April 1991, and includes attachments. |
Former Staff |
10/26/1990 |
Update or Other Action |
Memorandum from Environmental Contaminants Coordinator, USFSW, to Supervisor, Fisheries Management Services regarding fish from Shemya Lakes. |
Former Staff |
11/1/1990 |
Update or Other Action |
Volume III, Concept Approved Draft of the Coastal Management Plan. |
Former Staff |
6/25/1991 |
Update or Other Action |
Site Summaries for Shemya Air Force Base, Alaska Installation Restoration Program. |
Dan Hartung |
7/26/1991 |
Update or Other Action |
Notice of Violation / Request for Corrective Action letter to 5099th CEOS Air Force (Captain Kenneth Brown, Chief of Environmental Contract and Planning Section) from ADEC (Ron Klein, Manager of Regional Contaminated Sites) regarding numerous sites and the status of site assessments and remedial actions. The Air Force response letter is dated August 29, 1991. ADEC letter dated September 23, 1991 serves as a formal notification that the terms of the NOV were satisfied. |
Dan Hartung |
8/27/1991 |
Update or Other Action |
Shemya Soils and Groundwater Database. |
Dan Hartung |
10/4/1991 |
Update or Other Action |
Installation Restoration Program (IRP) Field Investigation Plan, Shemya Air Force Base, Alaska (2 volumes). |
Dan Hartung |
5/5/1992 |
Update or Other Action |
Hazardous Toxic Waste (HTW) Investigation for the Base Civil Engineering / Vehicle Maintenance Facility, Shemya AFB, Alaska. |
Dan Hartung |
6/23/1992 |
Preliminary Assessment Approved |
EPA has reviewed a preliminary assessment submitted for Shemya Air Force Base. |
Ray Burger |
6/23/1992 |
Site Characterization Workplan Approved |
(Old R:Base Action Code = SI - Site Investigation). EPA has reviewed the Field Investigation Plan submitted for Shemya Air Force Base. |
Ray Burger |
7/31/1992 |
Notice of Violation |
Compliance Advisory letter to Alaska District Army (Colonel John Pierce) by ADEC (Ronald Klein, Contaminated Sites Program Supervisor) regarding Application of Underground Storage Tanks (UST) regulations to removal and installation of USTs at Shemya AFB. The Air Force response letter is dated September 18, 1992. |
Ray Burger |
10/1/1992 |
Update or Other Action |
Field and Analytical Report for Interim Remedial Action to Remove Petroleum Oil Lubricant (POL) Impacted Soil at Buildings 605 and 616, Eareckson AFB, Alaska (dated October 1992 to June 1993). Prepared by 11th CEOS. |
Ray Burger |
1/1/1993 |
Update or Other Action |
Trip Report: Winter Wildlife and Oil Contamination Surveys, Shemya I., Alaska, 4-8 January 1993. |
Ray Burger |
1/13/1993 |
Update or Other Action |
Chemical Data Report, Shemya Seawall/Erosion Protection, Shemya Air Force Base, Alaska. Memorandum prepared by Thomas Delwyn documenting a sampling effort to investigate potential soil contamination in areas to be excavated at Eareckson AS. |
Ray Burger |
2/1/1993 |
Update or Other Action |
(Old R:Base Action Code = FI - Field Inspection (General)). |
Former Staff |
2/1/1993 |
Update or Other Action |
Shemya Air Force Base, Alaska 1992 Installation Restoration Program Field Investigation Report, prepared by CH2M Hill; report finalized in February 1993 |
Ray Burger |
3/1/1993 |
Update or Other Action |
Field Survey Report and Computer Database for Underground Storage Tanks at Shemya Air Force Base, Shemya Island, Alaska, prepared by 11th CES. |
Ray Burger |
3/29/1993 |
Update or Other Action |
Chemical Data Report, Hazardous Waste Management Facility and Hazardous Material Storage Facility, Shemya AFB, AK. |
Ray Burger |
5/20/1993 |
Update or Other Action |
Status of Shemya Air Force Base in Relation to Proposal for the National Priorities List. |
Ray Burger |
6/1/1993 |
Update or Other Action |
Shemya Air Force Base, Alaska General Stockpiling Plan for Contaminated Soil. |
Ray Burger |
6/15/1993 |
Update or Other Action |
Field Survey Report and Computer Database for Underground Storage Tanks at Shemya Air Force Base, Shemya Island, Alaska. Prepared by Ecology and Environment. |
Ray Burger |
12/1/1993 |
Update or Other Action |
Eareckson Air Force Station (formerly Shemya AFB, Alaska) 1993 Installation Restoration Program Basewide and Limited Source Investigation Workplan. Prepared by Jacobs Engineering Group. |
Ray Burger |
12/15/1993 |
Update or Other Action |
Letter to ADEC from Major Herr (11th Civil Engineering Operations Squadron) regarding Underground Storage Tank Site List and transfer of sites |
Ray Burger |
4/15/1994 |
Update or Other Action |
Draft Informal Technical Information Report, Site Characterization Summary Report, 1993 Field Program, Eareckson Air Station, Alaska (formerly Shemya AFB, Alaska). Prepared by Jacobs Engineering Group |
Ray Burger |
4/28/1994 |
Site Ranked Using the AHRM |
Initial ranking by staff. |
Former Staff |
4/28/1994 |
Site Added to Database |
TPH contamination. |
Former Staff |
5/17/1994 |
Update or Other Action |
Release Investigation for Buildings 588, 614, 625 and 1001. Prepared by 11th CEOS. |
Ray Burger |
9/30/1994 |
Notice of Violation |
Notice of Violation letter to 673rd ABG Air Force (Colonel Johnny Jarnigan, Commanding Officer) from ADEC (Janice Adair, Regional Administrator) regarding the April 1994 RCRA Compliance Evaluation Inspection. |
Ray Burger |
12/15/1994 |
Update or Other Action |
Final Remedial Investigation, Workplan and Sampling and Analysis Addendum, 1994 Field Season, Eareckson Air Station, Alaska (formerly Shemya AFB, Alaska). Prepared by Jacobs Engineering Group. |
Ray Burger |
1/1/1995 |
Update or Other Action |
Natural Resource Plan, Eareckson AS, Shemya Island, Alaska, draft. |
Ray Burger |
1/31/1995 |
Update or Other Action |
Memorandum from 611 CES/CEOR to 611 CES/CEVR regarding Asphaltic Tar Soil Samples, Eareckson AS, Alaska. |
Ray Burger |
2/1/1995 |
Update or Other Action |
Community Relations Photo Notebook; Remedial Investigations, Feasibility Studies and Remedial Actions. |
Ray Burger |
3/3/1995 |
Update or Other Action |
Underground Storage Tank (UST) Removals and Site Assessments 1994, Eareckson AS, Alaska. (final dated February 1995, received March 1995) Prepared by 611 CES. |
Ray Burger |
4/15/1995 |
Update or Other Action |
Revised 1994 Well Abandonment Summary Report. Prepared by Jacobs Engineering Group. |
Ray Burger |
8/1/1995 |
Update or Other Action |
Eareckson AS, Shemya Island, Alaska Fact Sheet Numbe 2 "Public Involvement in the Decision Making Process". |
Ray Burger |
10/23/1995 |
Update or Other Action |
Notice of Violation letter to USAF (Colonel Samuel Johnson III) from ADEC (Michael Conway, Industrial Operations Section Chief) regarding the June 1995 hazardous waste inspection. |
Ray Burger |
12/1/1995 |
Update or Other Action |
Management Action Plan, Eareckson Air Station, Alaska (formerly Shemya AFB, Alaska). |
Ray Burger |
1/15/1996 |
Update or Other Action |
Final Remedial Investigation / Feasibility Study Report, Volume III, Eareckson Air Station, Alaska (Formerly Shemya Air Force Base Alaska). |
Ray Burger |
2/20/1996 |
Update or Other Action |
Memorandum for the record: Possible Mercury Site at Eareckson AS. |
Ray Burger |
3/15/1996 |
Site Characterization Report Approved |
Final Remedial Investigation / Feasibility Study Report, Volume IV, Eareckson Air Station, Alaska (Formerly Shemya Air Force Base Alaska). |
Ray Burger |
10/30/1998 |
Meeting or Teleconference Held |
Meeting with Air Force on response to comments for Decision Documents Volumes 3 and 4. Two main issues - (1) documents lacking detail necessary to describe remedial investigation, risk assessment, remedial, and no-further-action decisions, and (2) Air Force determination that no analyses will be performed for DRO, GRO and RRO based on a 1994 Department approval of specific petroleum constituents for risk assessment studies. No resolution reached on these 2 main issues - outcome resulted in potential for dispute resolution process. |
Gretchen Pikul |
11/23/1998 |
Meeting or Teleconference Held |
Meetings with Air Force on Decision Documents Volumes 3 and 4. Two main issues - (1) level of detail needed in documents, and (2) no DRO, GRO and RRO analyses in long-term monitoring. No resolution reached on these 2 main issues - outcome resulted in potential for dispute resolution process. |
Gretchen Pikul |
12/11/1998 |
Update or Other Action |
ADEC sent out letter outlining the remaining unresolved issues from the 3 Decision Document comment resolution meetings. |
Gretchen Pikul |
12/17/1998 |
Update or Other Action |
Final Management Action Plan (updated December 1998) |
Gretchen Pikul |
12/30/1998 |
Meeting or Teleconference Held |
Meeting with Air Force on Decision Documents Volumes 3 and 4. Two main issues - (1) level of detail needed in documents, and (2) no DRO, GRO and RRO analyses in long-term monitoring. Avoided formal dispute resolution process - began working on document detail needed and necessary analyses for long-term monitoring. |
Gretchen Pikul |
1/20/1999 |
Meeting or Teleconference Held |
Meeting with Air Force to discuss appropriate sites to be included within the Decision Documents Volumes 3 and 4 and the appropriate site status (transfer to Compliance, RCRA, Remedial Actions, and No-Further-Remedial-Action-Planned). |
Gretchen Pikul |
1/20/1999 |
Update or Other Action |
Final Basewide Monitoring Program Workplan - note DRO, GRO and RRO were not included as requested by ADEC |
Gretchen Pikul |
2/5/1999 |
Update or Other Action |
Remedial Investigation Basewide Groundwater Monitoring Report, August - September 1998, Basewide Monitoring Activities and Findings (dated January 1999) |
Gretchen Pikul |
2/5/1999 |
Update or Other Action |
Review of 43 UST Decommissioning Site Assessments - comment letter by ADEC Storage Tank Program |
Gretchen Pikul |
6/22/1999 |
Meeting or Teleconference Held |
ADEC participated in a facility-wide site visit from June 22 - 25. The 24 site inspections and discussions were designed to aid in the development and review of upcoming Decision Documents. |
Gretchen Pikul |
6/25/1999 |
Update or Other Action |
Project Report - Underground Storage Tank Site Assessment Reports, Aboveground Storage Tank Removal Reports and Environmental Compliance Activities (dated June 1999). |
Gretchen Pikul |
6/25/1999 |
Update or Other Action |
Project Report - Underground Storage Tank Site Assessment Reports, Aboveground Storage Tank Removal Reports, and Environmental Compliance Activities (dated June 1999) |
Gretchen Pikul |
11/30/1999 |
Update or Other Action |
Decision Documents (review draft dated November 1999, received November 30, 1999, meeting on January 4, 2000). |
Gretchen Pikul |
12/8/1999 |
Site Ranked Using the AHRM |
Initial ranking. |
Gretchen Pikul |
1/4/2000 |
Meeting or Teleconference Held |
ADEC participated in a Decision Document meeting with Air Force and USFWS; ADEC reviewed, commented and participated in internal briefing meetings during January and February. |
Gretchen Pikul |
3/10/2000 |
Update or Other Action |
Comprehensive Basewide Monitoring Report, June 1999 Basewide Monitoring Activities and Findings (draft dated October 1999); ADEC comment letter dated January 7, 2000; final dated 1-31-00, received by Air Force on 3-1-00, and ADEC on 3-10-00) |
Gretchen Pikul |
8/16/2000 |
Update or Other Action |
Basewide Monitoring Program Workplan (draft dated June 14, 2000; ADEC comment letter dated June 16, 2000; final dated August 16, 2000) |
Gretchen Pikul |
11/1/2000 |
Update or Other Action |
Environmental Compliance Program - Site Assessments and Remediation Plan - Calendar Year 1997 UST Removal dated February 2000; ADEC Storage Tank Program comment letter dated June 22, 2000; final workplan retitled Final Corrective Action Plan and Corrective Action Plan Addendum (dated August 2000). |
Gretchen Pikul |
1/16/2001 |
Meeting or Teleconference Held |
Decision Document and general status meeting with new Air Force project manager, Larry Opperman and staff. |
Gretchen Pikul |
5/24/2001 |
Update or Other Action |
Year 2000 Basewide Monitoring Program Report (draft final dated April 9, 2001, ADEC comment letter dated May 24, 2001) |
Gretchen Pikul |
7/3/2001 |
Update or Other Action |
Technical Memorandum - Risk Assessment Assumptions for Decision Documents (draft final dated January 8, 2001, ADEC comment letter dated March 19, 2001, comment resolution meeting on May 18, 2001, final received June 11, 2001, ADEC e-mail comments after reviewing final document dated July 3, 2001). |
Gretchen Pikul |
12/10/2001 |
Update or Other Action |
Decision Document Report Volumes III and IV (draft dated March 1996; draft final dated April 1997 and received May 1997; ADEC comment letter dated October 1, 1997 with extensive comments; related meetings in 1998 on October 30, November 23, November 24 and December 30; related meetings in 1999 on January 20 and 26, February 2 and 25, June 22-25 during site visit, August 24 during FY00 project scoping meeting, and October 1; received Review Draft Decision Documents on November 30, 1999 ADEC comment letters in February 2000; related meetings in 2000 on January 4; related meetings in 2001 on January 4 and 16; ADEC comment letter on Draft Final Technical Memorandum - Risk Assessment Assumptions for Decision Documents (dated March 19) with comment resolution meeting on May 18, final memorandum dated June 2001; draft Proposed Plan for 6 sites received August 24, ADEC comment letter dated September 19, 'response to comments' received December 10, 2001). |
Gretchen Pikul |
2/27/2003 |
Update or Other Action |
ADEC participated in a meeting regarding 2002 Missile Defense program field work. A previously unknown UST was discovered during excavation activities for the Defense Satellite Communication System structure (in vicinity of this site). Approximately 15,000 cubic yards of contaminated soil was removed and is currently in long term stockpiles located on abandoned runway B. Based on the limited construction timeframe, the soil was removed in lieu of in situ remediation. According to the preliminary data, the most elevated DRO level detected in the contaminated soil is 1,800 mg/kg. Follow-on activities will include: (1) Missile Defense will program a study to determine the best possible management or treatment options for the contaminated stockpiles; (2) A comprehensive report detailing the 2002 project will be issued; and (3) An Operation and Maintenance plan will be developed for management of the contaminated soil stockpiles until a final decision can be made on management or treatment options. An Air Force Memo outlines this meeting. |
Gretchen Pikul |
12/11/2003 |
Update or Other Action |
Air Force has reprioritized all remaining sites as medium and low priority due to security on island, no local community affected, and no current human health or ecological risk determined by risk assessment and investigations. Since the Air Force is required to complete all high priority projects by 2007, the Eareckson projects are being placed further in the outyears. See ADEC e-mail dated December 11, 2003 regarding sites ST46, SS23, SS25, ST50, and ST51 and requested monitoring during the interim years. |
Gretchen Pikul |
10/17/2007 |
Meeting or Teleconference Held |
Discussed the future of the site at the TRIAD meeting. Discussion regarding te evaluation of groundwater contaminant levels and check the product level in AP-1525. |
Jonathan Schick |
11/16/2007 |
Site Visit |
ADEC staff travelled to Eareckson Air Station for 4 days to conduct site visits and become familiar with the ecology and topography of the island. Site visits were conducted to all pertinent sites and meetings were held to discuss the plan moving forward for Records of Decision and remedial alternatives. |
Jonathan Schick |
3/6/2008 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed. |
Jonathan Schick |
5/6/2008 |
Update or Other Action |
ADEC staff issued a letter to the USAF regarding the submission of a Remedial Investigation Work Plan that does not address all of the site characterization information required by the state. It is the recommendation of the ADEC that a more comprehensive remedial investigation be conducted to collect a sufficient amount of information to characterize the subsurface contamination at each of the 12 sites in question. |
Jonathan Schick |
7/11/2008 |
Site Characterization Workplan Approved |
ADEC staff approved the Remedial Field Investigation Work Plan for 12 sites including ST051. |
Jonathan Schick |
3/26/2009 |
Update or Other Action |
ADEC staff recieved a draft version of the Analytical Data Report for the 12-site Remedial Investigation at Eareckson AS. A Draft Risk ASsessment Work Plan was submitted at the same time for our review. |
Jonathan Schick |
7/29/2009 |
Update or Other Action |
ADEC Staff recieved a draft version of the Remedial Field Investigation at 12 Environmental Restoration Sites Remedial Investigation Report dated July, 2009. THe report details the findings from the Remedial Field Investigation that took place during 2008. The purpose of the RFI was to gather additional information about the 12 subject sites in order to support a Risk Assessment. Additional Site characterization will be necessary at SS12 where the PCB contamination extends beyond the bounds of the 2008 investigation. |
Jonathan Schick |
8/25/2009 |
Update or Other Action |
ADEC staff submitted comments on the Draft Remedial Field Investigation Report for 12 SItes at Eareckson AS. The report detailed the results of the investigation that took place in 2008. THe State's concerns are regarding the incomplete characterization of the PCB contamination at SS12 adn some inconsistencies between the Work Plan and the Field Investiagtion including some subsurface sampling that was excluded from the RFI. |
Jonathan Schick |
7/29/2010 |
Update or Other Action |
ADEC submitted comments on the Draft Remedial Field Investigation at 12 Environmental Restoration Program Sites (Addendum) which included an island wide background metals sampling event. The State;s main concern with the report is the statistical analysis of the background metals as the 95% UCL was used as the background concentration instead of the UPL or UTL. Additionally the report detailed the follow-on remedial investigation of the PCB impacts at SS012. |
Jonathan Schick |
11/3/2010 |
Site Characterization Report Approved |
Contaminated Sites Staff issued a letter to the USAF approving the Final version of the Remedial Field Investigation at 12 Environmental Restoration Program Sites Remedial Investigaion Report Addendum. The report detailed the additional investigation of the extent of PCB impacted soils at SS012 the Old White Alice Site at Eareckson Air Station. Samples were collected around the perimeter of the previous investigations and also down the slope that drops from the site to the north/northwest. Also the addendum detailed the collection and calculation of background metals concentration from across the island at locations not associated with known contaminated sites. |
Jonathan Schick |
12/20/2011 |
CERCLA FS |
Contaminted Sites Staff recieved the final version of the Feasibility Study Report for 12 sites at Eareckson Air Station. The comments from the draft were resolved and the changes incorporated into the Final document. |
Jonathan Schick |
6/12/2012 |
Update or Other Action |
Contaminated Sites Staff recieved the Draft Proposed Plan for several of the 12 sites that went through the Remedial Investigation together in 2008. The proposed plan does not include the proposed remedy for ST051 but this site will be addressed in another Proposed Plan that should be available for review in the near future. |
Jonathan Schick |
3/17/2014 |
CERCLA ROD Approved |
The ADEC Contaminated Site Program approved the February 2014 Record of Decision for SS010, SS023/ST035, SS025, ST046, ST050, and ST051. The selected remedy for ST051 was Long-term Management with Institutional Controls to restrict access to or inappropriate use of soil and groundwater. The remedy also includes Monitored Natural Attenuation (MNA) of contaminants in groundwater in sampling events conducted every 2 years. |
Jessica Morris |
8/27/2014 |
Long Term Monitoring Established |
The ADEC Contaminated Sites Program approved the Final Work Plan for Environmental Long Term Monitoring and Site Inspections ((FT001, FT002, FT003, OT048, SS007, LF015, LF018, LF024, LF026, SS010, SS023, ST035, SS025, ST009, ST044, ST046, ST050, ST051) and Limited Site Characterization (Building 3055 Area) at Eareckson Air Station, Alaska. This scope of work is not sufficient to meet the long term monitoring objectives outlined in the most recently established RODs. The USAF will hold a scoping meeting with ADEC to plan additional well installation to meet these long term monitoring requirements. |
Jessica Morris |
5/20/2015 |
Institutional Control Compliance Review |
The ADEC Contaminated Sites Program approved the Final Report for Environmental Long Term Monitoring and Site Inspections (FT001, FT002, FT003, OT048, SS007, LF015, LF018, LF024, LF026, SS010, SS023, ST035, SS025, ST009, ST044, ST046, ST050, ST051) at Eareckson Air Station, Alaska. |
Jessica Morris |
10/22/2015 |
Update or Other Action |
The ADEC Contaminated Sites Program reviewed and commented on a draft scope of work for investigation, remedial process optimization, and long term management studies at several sites for Eareckson Air Station. |
Jessica Morris |
8/31/2016 |
Site Characterization Workplan Approved |
The ADEC Contaminated Sites Program conditionally approved the 2016 Uniform Federal Policy - Quality Assurance Project Plan (UFP-QAPP) for Site Characterization at 14 Former POL Sites, Eareckson Air Station, Shemya Island, Alaska. The conditions for the UFP-QAPP are as follows: 1) We do not object to the long term monitoring work being completed as outlined in the UFP-QAPP; however ADEC cannot concur that efforts will be counted towards meeting the end point criteria outlined in the decision documents until an adequate monitoring program has been established. 2)The QAPP states that field screening results and field observations will be used to determine additional groundwater monitoring well locations. These locations should to be coordinated with ADEC. 3) The leaking underground storage tank (LUST) sites at Eareckson Air Station will need to be characterized and closed in accordance with LUST regulations that are included in 18 AAC 78. 4) The scope of work for this investigation may not be sufficient to fully characterize the sites listed in the work plan, and additional investigation may be necessary. |
Jessica Morris |
11/14/2016 |
Site Visit |
ADEC staff travelled to Eareckson Air Station for 4 days to conduct site visits and become familiar with the ecology and topography of the island. Site visits were conducted to all pertinent sites and meetings were held to with ADEC and USAF to discuss a path forward for the sites. |
Jessica Morris |
3/31/2017 |
Document, Report, or Work plan Review - other |
The ADEC Contaminated Sites Program approved the Final UFP-QAPP Site Investigation for Perfluorinated Compounds and Long Term Management Studies, Eareckson Air Station. The work plan was approved with the condition that the monitoring program proposed was not sufficient to meet the requirements in the RODs. ADEC requires a work plan for remedy implementation to establish an adequate monitoring program. |
Jessica Morris |
11/27/2017 |
Site Visit |
ADEC staff travelled to Eareckson Air Station for 3 days to conduct site visits and institutional control inspections. Site visits were conducted to all pertinent sites and meetings were held to with ADEC and USAF to discuss a path forward for the sites. |
Jessica Morris |
5/2/2018 |
Document, Report, or Work plan Review - other |
The ADEC Contaminated Sites Program submitted comments on the Draft Remedial Process Optimization Report for Eareckson Air Station. The purpose of the report was to present an evaluation of the effectiveness of the current selected site remedies and make recommendations for optimization of an island-wide monitoring and management program for contaminated sites at Eareckson. ADEC had numerous comments on the document, and requested a project team meeting to further discuss a more effective and efficient program at Eareckson. |
Jessica Morris |
1/8/2019 |
Institutional Control Compliance Review |
The Alaska Department of Environmental Conservation (ADEC) Contaminated Sites Program received a copy of the Final Long Term Monitoring and Institutional Controls Inspection Report for Eareckson Air Station. The report is accepted as final documentation of the field activities. The report is approved with the conditions noted in the ADEC’s comments 1/8/19 letter.
The field efforts completed are not considered sufficient to meet the overall long term monitoring requirements outlined in the site records of decision and regulations for closure end point criteria. ADEC is working with the USAF to develop a more efficient island-wide long term monitoring strategy for Eareckson Air Station. |
Jessica Morris |
7/5/2019 |
CERCLA ROD Periodic Review |
DEC provided comments to the U.S. Air Force on the "Five-Year Review Report and Period Review for Eareckson Air Station, Shemya Island, Alaska, Draft” dated November 2018 on July 5, 2019. |
Melinda Brunner |
10/9/2019 |
Update or Other Action |
Approved 2019 Remedial Action Operations, land Use/Institutional Control Supplemental Work Plan. |
William Schmaltz |
6/25/2020 |
Institutional Control Periodic Reporting |
2019 Technical Project Report. The purpose of this project is to continue environmental long-term management at multiple sites
at Eareckson AS, Alaska. The objectives of this project were to conduct groundwater sampling
at eight sites, surface water sampling at four sites, sediment sampling at three sites, conduct IC
inspections at 19 sites, and conduct an assessment of necessary repairs at LF026. The
assessment of LF026 is documented in a separate technical memorandum; this LTM report
presents the findings of the IC inspections and the results of groundwater, surface water, and
sediment sampling. |
Darren Mulkey |
6/25/2020 |
Document, Report, or Work plan Review - other |
The purpose of this project is to continue environmental long-term management at multiple sites at Eareckson AS, Alaska. The objectives of this project were to conduct groundwater sampling at eight sites, surface water sampling at four sites, sediment sampling at three sites, conduct IC inspections at 19 sites, and conduct an assessment of necessary repairs at LF026. The assessment of LF026 is documented in a separate technical memorandum; this LTM report presents the findings of the IC inspections and the results of groundwater, surface water, and sediment sampling. |
Darren Mulkey |
6/25/2020 |
Document, Report, or Work plan Review - other |
"Draft Technical Project Report, 2019 Environmental Long Term Management Activities, Eaceckson Air Station, Sites FT001, FT002, FT003, OT048, SS007, SS010, SS023, SS025, ST009, ST035, ST039, ST044, ST046, ST050, ST051, LF015, LF018, LF024, and LF026, May 2020". The purpose of this project is to continue environmental long-term management at multiple sites at Eareckson AS, Alaska. The objectives of this project were to conduct groundwater sampling at eight sites, surface water sampling at four sites, sediment sampling at three sites, conduct IC inspections at 19 sites, and conduct an assessment of necessary repairs at LF026. The assessment of LF026 is documented in a separate technical memorandum; this LTM report presents the findings of the IC inspections and the results of groundwater, surface water, and sediment sampling. |
Darren Mulkey |
4/27/2022 |
Update or Other Action |
On 4/27/2022 ADEC approved the Eareckson Air Station, Alaska, REMEDIAL PROCESS OPTIMIZATION REPORT dated April 2022.
This Remedial Process Optimization (RPO) Report presents an evaluation of the effectiveness of current selected site remedies and makes recommendations for optimization of the IWM Program, as appropriate to establish a more integrated groundwater monitoring program at Eareckson AS. RPO is a systematic approach for evaluating and improving the effectiveness of site remediation without increasing site risk. This RPO Report presents a site-by-site evaluation of effectiveness of the sites selected remedy and provides recommendations to:
• Streamline groundwater monitoring.
• Develop a holistic approach to site management.
• Maintain the remedial action objectives (RAOs) set forth in established Record of Decisions (RODs) and Decision Documents (DDs).
|
Daniela Fawcett |
7/3/2023 |
Document, Report, or Work plan Review - other |
DEC submitted responses to comments for the Draft Final 2021 Long Term Management, Land Use and Institutional Controls Report Eareckson Air Station, Shemya, Alaska Sites CS566, DA002/DA002A, DA003, FT001, FT002, FT003, LF015, LF018, LF024, LF026, ML001, MU001, OD001, OT048, OT617, PL560, PL575, SS005, SS007, SS010, SS012, SS023, SS025, ST009, ST035, ST039, ST044, ST046, ST050, ST051, TA555, TA556, TA616, TU553, TU554, TU558, TU559, TU567, TU568, XU912, ZZ001, dated June 2023. |
Ginna Quesada |
8/3/2023 |
Long Term Monitoring Workplan or Report Review |
DEC approved the "Final 2021 Long Term Management, Land Use and Institutional Controls Report Eareckson Air Station, Shemya, Alaska Sites CS566, DA002/DA002A, DA003, FT001, FT002, FT003, LF015, LF018, LF024, LF026, ML001, MU001, OD001, OT048, OT617, PL560, PL575, SS005, SS007, SS010, SS012, SS023, SS025, ST009, ST035, ST039, ST044, ST046, ST050, ST051, TA555, TA556, TA616, TU553, TU554, TU558, TU559, TU567, TU568, XU912, ZZ001, dated July 2023." The report recommends continuing with land-use control site inspections and monitoring the groundwater until all remedial objectives are met. |
Erica Blake |