Site Report: Eklutna NALEMP Drum Removal
Site Name: | Eklutna NALEMP Drum Removal |
---|---|
Address: | Near Railroad in Eklutna, Chugiak, AK 99567 |
File Number: | 2108.38.003 |
Hazard ID: | 4310 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 61.455068 |
Longitude: | -149.384459 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
The project was to remove what was thought to be empty drums on native land adjacent to the railroad. While removing the drums a pool of 1-2 gallons of what appears to be paint resin accumulated. It is also reported that some asphalt/tar like substance was in another drum. Work has been temporarily halted on the removal action until a work plan can be developed to address the hazardous substances found.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
9/26/2006 | Meeting or Teleconference Held | Site visit to drum area next to railroad, small spill of what appears to be paint resin | Debra Caillouet |
9/27/2006 | Site Added to Database | Site added to the database. | Mitzi Read |
10/8/2007 | Meeting or Teleconference Held | Staff met with representatives of the Native Village of Eklutna and their contractor to discuss work that has been done and future work. | Debra Caillouet |
10/11/2007 | Exposure Tracking Model Ranking | Debra Caillouet | |
8/19/2008 | Update or Other Action | Comments were sent to the Eklutna Tribal Council on the Phase II Site Remediation Work Plan for Eklutna Army Site, August 2008 | Debra Caillouet |
9/4/2009 | Site Characterization Workplan Approved | Staff approved a plan for minimal sampling after drum removal. | Debra Caillouet |
9/15/2009 | Site Visit | Staff visited the site with the Corps NALEMP PM | Debra Caillouet |
9/28/2009 | Interim Removal Action Approved | Staff issued a letter of non-objection to the excavation of contaminanted soil and confirmation sampling at the limits of excavation. | Debra Caillouet |
8/25/2010 | Document, Report, or Work plan Review - other | comments were sent to NVE on the Drum Dump Site Activity Report 2009 | Debra Caillouet |
9/1/2010 | Document, Report, or Work plan Review - other | The Native Village of Eklutna Drum Dump Site Activity Report 2009 was accepted. | Debra Caillouet |
8/12/2011 | Final Cleanup Report Reviewed | 2010 report, 116.33 tons of soil removed. TCE remaining in excavation to a max of.059 mg/kg at 6' bgs. Additional characterization required to determine extent of TCE remaining. | Debra Caillouet |
8/12/2011 | Exposure Tracking Model Ranking | A new updated ranking with ETM has been completed for source area 75289 DRums. | Debra Caillouet |
1/10/2013 | Document, Report, or Work plan Review - other | Native Village of Eklutna, Eklutna Army Site Drum Dump Site Investigation, Draft Work Plan, August 2012 The Alaska Department of Environmental Conservation received the referenced draft work plan by e-mail on August 27, 2012 and provided comments and review of the comment responses through early October 2012. DEC accepted the responses with the exception of the question on the suitability of the use of Method 200.8 rather than the standard Method 6020 for metals in water. DEC received the explanation from the laboratory on January 9, 2012 and will accept the use of Method 200.8. Please incorporate the responses into the work plan and submit a final for approval. | Debra Caillouet |
4/10/2013 | Site Characterization Workplan Approved | Eklutna Army Site Drum Dump Investigation Work Plan, April 2013 | Debra Caillouet |
7/11/2014 | Cleanup Complete Determination Issued | based on draft soil and groundwater sampling report | Debra Caillouet |
10/6/2014 | Update or Other Action | Notification received of decommissioning the monitoring well at the site. | Debra Caillouet |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
Lead - Total | < Method 2 Most Stringent | Soil | |
Trichloroethene | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. |
There are no documents for this site report.