Site Report: Bullen Pt. DEW SS001 Shed No. 1
Site Name: | Bullen Pt. DEW SS001 Shed No. 1 |
---|---|
Address: | 36 Miles East of Prudhoe Bay, On Pad West of Active Radar Dome, Prudhoe Bay, AK 99734 |
File Number: | 375.38.002 |
Hazard ID: | 4322 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 70.176699 |
Longitude: | -146.853431 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
The shed was used for flammable liquid storage, some leaking containers were found in 1988. One 55-gallon drum of heavy oils, one of light oil and solvent, and one drum of PCB greater than 500 mg/kg were shipped off site. The soil around the shed was sampled and analyzed for VOCs, PAHs and PCBs, BTEX and the petroleum hydrocarbon ranges. The only detections were DRO up to 7320 mg/Kg and GRO up to 236 mg/Kg. The excavation at SS001 was to native soil with 30 cubic yards being shipped offsite for thermal treatment and 230 cubic yards shipped offsite for disposal; another 60 cubic yards were used as backfill at the Bullen Point Landfill. Confirmation sampling indicated that some petroleum contamination exists next to, the then operational, Short Range Radar Station that could not be safely excavated. With the exception of the soil adjacent to the SRRS the cleanup goals were met with a 95% UCL of 1153 mg/kg DRO. The cleanup of SS001 was determined complete in 2008,but subsequent contamination was identified in 2014 as part of further assessment, and the site was re-opened. Hazard ID 4682 File Number 375.38.006
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
11/28/2006 | Site Added to Database | Site added to the database. | Mitzi Read |
3/12/2007 | Exposure Tracking Model Ranking | Intitial Ranking Complete for Source Area: 75302 (Autogenerated Action) | |
4/3/2007 | Update or Other Action | staff provided comment on the clean sweep work plan | Debra Caillouet |
4/26/2007 | Update or Other Action | Staff provided comment on the Draft Final Decision Document | Debra Caillouet |
6/8/2007 | Cleanup Plan Approved | Clean Sweep removal work plan approved. | Debra Caillouet |
10/1/2007 | Record of Decision | Debra Caillouet | |
8/1/2008 | Update or Other Action | The Clean Sweep Remedial Action Report was approved. POL contamination extended southeast from the shed. POL contamination was pervasive down to native soils (approximately 2.5-3.5’ bgs). Approximately 320 cy of soil over an area of 2,587 sf was excavated. An approximate volume of 30 cy of soil with DRO concentrations greater than 12,500 mg/Kg was bagged and shipped offsite for thermal treatment and disposal. An approximate volume of 230 cy of soil with DRO/RRO concentrations above 2,000 mg/Kg was bagged and shipped offsite for disposal. Approximately 60 cy of soil was used as cover material in the Bullen Point landfill (40 cy from excavation and 20 cy following land spreading). The site was backfilled with clean gravel and graded to fit the contours of the area. 2460 DRO 639 RRO MI confirmation sample of the tundra floor of the excavation. 3540 DRO 1550 RRO MI confirmation sample of the gravel and sand walls of the excavation. 1080 DRO 728 RRO Duplicate MI confirmation sample of the gravel and sand walls of the excavation. 1110 DRO 895 RRO Triplicate MI confirmation sample of the gravel and sand walls of the excavation. | Debra Caillouet |
8/29/2008 | Site Closure Approved | DRO was removed to below 2000 mg/kg. Soil remaining is subject to DEC approval for transport. | Debra Caillouet |
10/22/2015 | Site Reopened | Based on information obtained from a 2015 report that documented field activities and assessment associated with SS001 that yielded concentrations as high as 74,300 mg/kg in soil from 28 inches below surface. Additional assessment to be completed in 2016. | John Carnahan |
10/22/2015 | Exposure Tracking Model Ranking | A new updated ranking with ETM has been completed for source area 75302 Spills. | John Carnahan |
12/2/2015 | Document, Report, or Work plan Review - other | Review and approve FINAL Building Demolition and Debris Removal Technical Report for SS001-Shed#1. Work to continue in 2016. | John Carnahan |
4/12/2016 | Document, Report, or Work plan Review - other | Provide review comments to Supplementary SI specific to SS001 and vicinity. Conclusions that additional investigation to verify extent of contamination will be required. | John Carnahan |
5/23/2016 | Site Characterization Report Approved | DEC Approval of FINAL Supplemental Site Investigation Report, SS001-Shed #1, Bullen Point SRRS, May 2016 | John Carnahan |
1/17/2017 | Update or Other Action | Stephen Krause replaces Lori Roy as the AF RPM for Barter, Bullen, Wainwright, Lisburne, Point Lonely, Oliktok, Lake Louise, Big Mtn and Duncan Canal. | John Carnahan |
4/4/2017 | Document, Report, or Work plan Review - other | Provide comments on SS001 UVOST investigation work plan for 2017. | John Carnahan |
10/19/2018 | Meeting or Teleconference Held | Meeting with AF and consultant to discuss approach to addressing area-wide petroleum contamination identified during recent site characterization. | John Carnahan |
10/29/2018 | Cleanup Complete Determination Issued | Site closure was re-instated as contamination identified in close proximity to the Shed No. 1 site was to be managed under Bullen Point SRRS site, Hazard ID no. 4682. Actions documented since site was re-opened will be duplicated in site ‘Bullen Point SRRS.’ No new separate closure letter accompanies this recent determination. See original attached closure letter for details on closure. | John Carnahan |
10/29/2018 | Institutional Control Record Removed | Institutional Controls have been removed. | John Carnahan |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil | Target level was <2,000 mg/kg |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. | |
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) |
No associated sites were found.