Site Report: Jillian Square Apartments HOTs
Site Name: | Jillian Square Apartments HOTs |
---|---|
Address: | 3000 Davis Road, Fairbanks, AK 99709 |
File Number: | 102.38.089 |
Hazard ID: | 4348 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 64.829980 |
Longitude: | -147.792410 |
Horizontal Datum: | NAD83 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Diesel range organic-contaminated soil was discovered during investigation of five 6,000-gallon and one 1,000-gallon heating oil tanks. Release possibly due to loose pipe fitting on Tank D. All tanks passed tightness testing.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
2/4/1994 | Update or Other Action | Level 2 Environmental Site Assessment: soil samples were collected near the heating oil tanks. Tank D had soil contamination at the groundwater interface than exceeded ADEC cleanup levels for DRO. A well point was installed and groundwater was found to have BTEX below ADEC cleanup levels. Tank B had soil contamination below ADEC cleanup levels for DRO at the groundwater interface. | Former Staff |
6/17/1994 | Update or Other Action | Groundwater Quality Assessment: four soil borings and two monitoring wells were installed to assess groundwater quality around tanks B and D. All soil and groundwater data were non-detect for BTEX. | Former Staff |
10/19/1994 | Update or Other Action | Summary Report on Groundwater Monitoring and Sampling Program: two monitoring wells (MW-1 and MW-2) were sampled on 9/6/94, BTEX levels were below the Maximum Contaminant Levels. | Former Staff |
1/23/1995 | Update or Other Action | Summary Report on Groundwater Monitoring and Sampling Program: two monitoring wells (MW-1 and MW-2) were sampled on 12/10/94, BTEX levels were below the Maximum Contaminant Levels. | Former Staff |
3/24/1995 | Update or Other Action | Summary Report on Groundwater Monitoring and Sampling Program: two monitoring wells (MW-1 and MW-2) were sampled on 3/5/95, BTEX levels were below the Maximum Contaminant Levels. | Former Staff |
7/17/1995 | Site Closure Approved | No Further Action letter issued by Mehrdad Nadem. | Former Staff |
2/5/2007 | Site Added to Database | Site added to the database. | Mitzi Read |
2/6/2007 | Exposure Tracking Model Ranking | Baseline ranking completed. | Mitzi Read |
2/12/2007 | Exposure Tracking Model Ranking | Current ranking completed. | Mitzi Read |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
For more information about this site, contact DEC at (907) 465-5390. |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. |
There are no documents for this site report.