Action Date |
Action |
Description |
DEC Staff |
4/10/2007 |
Site Added to Database |
Site added to the database. |
Mitzi Read |
4/10/2007 |
Exposure Tracking Model Ranking |
Intitial Ranking Complete for Source Area: 75362 (Autogenerated Action) |
|
1/16/2008 |
Update or Other Action |
ADEC staff attended a Restoration Advisory Board meeting in Yakutat to discuss the status of various contaminated sites associated with the Yakutat AFB. Discussions at the RAB meeting included the results from the 2007 investigations including the Military Munitions Respons Program work and research; Avgas pipeline removal work scheduled for the upcoming summer; discussions concerning the Feasibility Study that is scheduled to be conducted in upcoming years; and the work to be conducted at the Ocean Cape Radio Relay Station in the NALEMP program. |
Jonathan Schick |
1/17/2008 |
Site Visit |
ADEC Staff pariticipated in a site visit to various sites around the Yakutat area. Snow inhibited access to many of the sitess but the purpose of the trip was to get an understanding of the distribution of sites and to attend a Restoration Advisory Board Meeting. |
Jonathan Schick |
8/13/2008 |
Meeting or Teleconference Held |
ADEC staff attended a Restoration Advisory Board meeting in the community of Yakutat. Various topics were discussed concerning the status of the on-going environmental restoration work that is going on in the area. Topics included, the new TAPP advisor for the RAB; the release of the Final Military Munitions Response Program report, a discussion of the progress at the Runwway Safety Area(20) and the status of the Feasibility Study. additional discussion was centered around the removal/abandonment of the Avgas pipeline from Concern L, as well as the upcoming work at the Ocean Cape RRS NALEMP Site. |
Jonathan Schick |
8/14/2008 |
Site Visit |
ADEC Staff pariticipated in a site visit to various sites in and around the Yakutat AFB area. We visited the Ocean Cape RRS NALEMP project site as well as performeds ome Quality assurance on the pipeline removal work in Concern L. The purpose of the QA work was to confirm that there were no undetected releases from the pipeline that was largely abandoned in place. The other purpose of the site visit was to attend a Restoration Advisory Board Meeting. |
Jonathan Schick |
9/30/2009 |
Update or Other Action |
ADEC staff signed a CON/HTRW project closeout report fort he Formerly Used Defense Sites associated with the Yakutat Air Base. The State of Alaska, through the Department of Environmental Conservation concurs with this USACE project closure. The decision may be reviewed or modified in the future if information becomes available that indicates the presence oif military CON/HTRW that may cause unacceptable risk to human health or the environment. The remeduiation of these sites will continue as necessary, this report only states that no containerized wastes are known to be present at the subject sites.
|
Jonathan Schick |
3/17/2010 |
Update or Other Action |
ADEC Staff issued a letter to the USACE approving the finalization of the Feasibility Study Report as all of the State's comments have been responded to and incorporated in the document. THe Feasibilty Study provides comparisons of applicable remedial alternatives for the numerous sites associated with the Former Yakutat Air Force Base. |
Jonathan Schick |
5/28/2010 |
Update or Other Action |
ADEC staff recieved a copy of the Draft Work Plan for the 2010 Supplemental Remedial Investigation. The Work Plan details the USACE's efforts to confirm that the Chromium detections are not hexavalent Chromium and to further investigate several sites that require additional sampling conducted. |
Jonathan Schick |
6/22/2010 |
Update or Other Action |
ADEC staff completed the review of the Draft Work Plan for the 2010 Supplemental Remedial Investigation and submitted comments to the US Army Corps of Engineers. The State's main concern was regarding the best way to characterize the impacts from the skeet range located near the airport. Multi-Incremental Sampling was proposed in the work plan but it may not be appropriate due to the size of the site. |
Jonathan Schick |
8/6/2010 |
Site Characterization Workplan Approved |
ADEC staff sent a letter to the USACE project manager approving the implementation of the final work plan for the Supplemental Remedial Investigation for several sites in Yakutat. The field work is scheduled to begin immediately and will be continuing for approximately one month. |
Jonathan Schick |
10/22/2010 |
CERCLA FS |
Contaminated Sites Staff submitted a letter to the US Army Corps of Engineers approving the Final Version of the Feasibility Study Report. The report details the amount of money and effort that cleanup wil require for each of the impacted sites at the Yakutat former Naval Air Facility. There were a few sites that were excluded from the study pending additional investigation. |
Jonathan Schick |
4/22/2011 |
Document, Report, or Work plan Review - other |
Contaminated Sites Staff recieved a copy of the Draft 2010 Supplemental Remedial InvestigationReport for the Fromer Yakutat Air Force Base. The report augmented the initial RI report from 2010 to collect additional data at several of the sites. The report is dated April 2011. |
Jonathan Schick |
6/3/2011 |
Document, Report, or Work plan Review - other |
Contaminated Sites Staff submitted a letter to the US Army Corps of Engineers with comments on the Draft 2010 Supplemental Remedial Investigation Report for the Former Yakutat Air Force Base. The State's main concerns were regarding methylene chloride present in some of the groundwater samples and the change to the cleanup level for lead as the site location should not be considered industrial despite it being located on airport property. |
Jonathan Schick |
3/16/2012 |
Document, Report, or Work plan Review - other |
Contaminated Sites Staff recieved a Final version of the 2010 Supplemental Remedial Investigation Report for Former Yakutat Air Force Base. The report details the follow-on investigation at several sites in the area to complete the Remedial Investigation that started over 10 years ago. The information gained from this Remedial Investigation will be used to support a Feasibility Study and in the future to select remedial techniques to be employed at the contaminated sites in Yakutat. |
Jonathan Schick |
3/19/2012 |
Site Characterization Report Approved |
Contaminated Sites Staff submitted a letter to the US Army Corps of Engineers Remedial Project Manager approving the final version of the Supplemental Remedial Investigation Report. The report contained the agreed upon changes and the final version is approved. |
Jonathan Schick |
4/5/2012 |
Update or Other Action |
Contamianted Sites Staff recieved revised pages to insert into the final version of the 2010 Supplemental Remedial Investigation Report for sites in Yakutat, AK. Pages were replaced in the final version of the report and the report was re-filed. |
Jonathan Schick |
9/29/2014 |
Site Visit |
The ADEC contaminated Sites staff participated in a Restoration Advisory Board (RAB) meeting, a tribal meeting, and site inspections in Yakutat with the Army Corps of Engineers to share information on the status of Formerly Used Defense Site investigation and cleanup activities around Yakutat. |
Jessica Morris |
10/15/2015 |
Site Visit |
The ADEC contaminated Sites staff participated in a Restoration Advisory Board (RAB) meeting and site inspections in Yakutat with the Army Corps of Engineers to share information on the status of Formerly Used Defense Site investigation and cleanup activities around Yakutat. |
Jessica Morris |
2/17/2016 |
Update or Other Action |
The ADEC Contaminated Sites Program provided comments on the revised Property Survey Summary Sheet for the DERP-FUDS Property No. F10AK0606, Inventory Project Report (INPR), Yakutat Air Base, Yakutat Alaska. The Yakutat AFB Firing Range was excluded from the revised INPR, and is to be addressed under a future INRP revision as a Military Munitions Response Program (MMRP) project. |
Jessica Morris |
10/11/2016 |
Site Visit |
The ADEC contaminated Sites staff participated in a Restoration Advisory Board (RAB) meeting and site inspections in Yakutat with the Army Corps of Engineers to share information on the status of Formerly Used Defense Site investigation and cleanup activities around Yakutat. |
Jessica Morris |
10/4/2017 |
Update or Other Action |
The ADEC Contaminated Sites Program sent a letter to the USACE documenting the State's non-concurrence with the Revised Property Survey Summary Sheet for DERP-FUDS Property No. F10AK0606, Inventory Project Report (INPR) for the Yakutat Air Base, Yakutat Alaska. ADEC does not have sufficient information to concur with the reduction of the overall Yakutat Air Base FUDS eligible projects, as described in the INPR. ADEC requested more information regarding the overall site reduction and a meeting with the USACE.
|
Jessica Morris |
8/16/2023 |
Document, Report, or Work plan Review - other |
DEC approved the Native American Lands Environmental Mitigation Program (NALEMP) Fiscal Year 2022 Cooperative Agreement Draft Work Plan for Site Investigation at the Rifle Range, Yakutat Tlingit Tribe, dated August 2023 |
Ginna Quesada |